Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date6 Nov 2024
Closing Date14 Nov 2024
Tender Amount₹ 32,64,000
Costs
EMD
₹ 3,26,000Document Cost
₹ 944Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEUVZ_970905_21Bid Award Id
ViewTender No
3508/8A DATE 15-10-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Providing and laying seal coat sealing 6.7mm stone grit @0.009 cum per sqm the voids in a bituminous grade VG-10 @0.65kg per sqm surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510. (Including all material, Bitumen T&P, labour cess etc. but excluding G.S.T.)
5010
65
325650
Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (in patri work) .(Including all material, T&P, labour cess etc. but excluding G.S.T.)
700
60
42000
The routine Maintainance Jogibadh Madaraha Chakesar Atardiha marg se Parasin Gram tak Sampark marg. including embankment, Patri, Road Sides, Cross Drains Hume Pipe Culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. including cost of material T&P labour cess, etc. but Excluding cost of GST ) For 1st Year maintenance Cost (Bituminous work)
1.67
-
-
The routine Maintainance Jogibadh Madaraha Chakesar Atardiha marg se Parasin Gram tak Sampark marg. including embankment, Patri, Road Sides, Cross Drains Hume Pipe Culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. including cost of material T&P labour cess, etc. but Excluding cost of GST ) For 2nd Year maintenance Cost (Bituminous work)
1.67
13945
23288.15
The routine Maintainance Jogibadh Madaraha Chakesar Atardiha marg se Parasin Gram tak Sampark marg. including embankment, Patri, Road Sides, Cross Drains Hume Pipe Culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. including cost of material T&P labour cess, etc. but Excluding cost of GST ) For 3rd Year maintenance Cost (Bituminous work)
1.67
27891
46577.97
The routine Maintainance Jogibadh Madaraha Chakesar Atardiha marg se Parasin Gram tak Sampark marg. including embankment, Patri, Road Sides, Cross Drains Hume Pipe Culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. including cost of material T&P labour cess, etc. but Excluding cost of GST ) For 4th Year maintenance Cost (Bituminous work)
1.67
41837
69867.79
The routine Maintainance Jogibadh Madaraha Chakesar Atardiha marg se Parasin Gram tak Sampark marg. including embankment, Patri, Road Sides, Cross Drains Hume Pipe Culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. including cost of material T&P labour cess, etc. but Excluding cost of GST ) For 5th Year maintenance Cost (Bituminous work)
1.67
55782
93155.94
(B) C.C. work
Providing laying spreading and compacting stone aggregates of water bound macadam specification including spreading in uniform thickness hand packing-rolling with 3- wheeled steel/vibratory roller 80-100 tonnes in stages to proper grade and camber applying and brooming requisite type of screening/binding materials to fill-up the interstices of course aggregtate watering and compacting to the required density grading 3 as per Technical Specification clause 405. (Including all material, T&P, labour cess etc. but excluding G.S.T.)
49.5
3300
163350
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M 30 (Grade), coarse and fine aggregates conforming to IS: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete withshovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501. (Including all material, T&P, labour cess etc. but excluding G.S.T.)
148.5
7500
1113750
Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (in patri work) .(Including all material, T&P, labour cess etc. but excluding G.S.T.)
100
60
6000
The routine Maintainance Jogibadh Madaraha Chakesar Atardiha marg se Parasin Gram tak Sampark marg. including embankment, Patri, Road Sides, Cross Drains Hume Pipe Culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. including cost of material T&P labour cess, etc. but Excluding cost of GST ) For 1st Year maintenance Cost (C.C. work)
0.33
-
-
The routine Maintainance Jogibadh Madaraha Chakesar Atardiha marg se Parasin Gram tak Sampark marg. including embankment, Patri, Road Sides, Cross Drains Hume Pipe Culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. including cost of material T&P labour cess, etc. but Excluding cost of GST ) For 2nd Year maintenance Cost (C.C. work)
0.33
9720
3207.6
The routine Maintainance Jogibadh Madaraha Chakesar Atardiha marg se Parasin Gram tak Sampark marg. including embankment, Patri, Road Sides, Cross Drains Hume Pipe Culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. including cost of material T&P labour cess, etc. but Excluding cost of GST ) For 3rd Year maintenance Cost (C.C. work)
0.33
19440
6415.2
The routine Maintainance Jogibadh Madaraha Chakesar Atardiha marg se Parasin Gram tak Sampark marg. including embankment, Patri, Road Sides, Cross Drains Hume Pipe Culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. including cost of material T&P labour cess, etc. but Excluding cost of GST ) For 4th Year maintenance Cost (C.C. work)
0.33
29161
9623.13
The routine Maintainance Jogibadh Madaraha Chakesar Atardiha marg se Parasin Gram tak Sampark marg. including embankment, Patri, Road Sides, Cross Drains Hume Pipe Culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. including cost of material T&P labour cess, etc. but Excluding cost of GST ) For 5th Year maintenance Cost (C.C. work)
0.33
38881
12830.73
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements