Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date12 Dec 2024
Closing Date18 Dec 2024
Tender Amount₹ 20,00,000
Costs
EMD
₹ 2,00,000Document Cost
₹ 944Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEUCZ_983121_10Tender No
2438/10 MG / 2024 DATE 28.11.2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Seal Coat
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510. Including Biumen, all taxes and labour cess but excluding GST
1500
60
90000
... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M 30 (Grade), coarse and fine aggregates conforming to IS: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501. Including all taxes and labour cess but excluding GST
112.5
7900
888750
... More
Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3. Including all taxes and labour cess but excluding GST
48
35
1680
... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I.P.C.C grade M 10 (i)Nominal mix 1:3:6. Including all taxes and labour cess but excluding GST
15.5
7000
108500
... More
Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 &amp; 1203 I. Brick masonry in 1:3 cement mortar Including all taxes and labour cess but excluding GST
17.5
6600
115500
... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 III.P.C.C. grade M 20 (i)Nominal mix (1:2:4) Including all taxes and labour cess but excluding GST
6.3
7200
45360
... More
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204. Including all taxes and labour cess but excluding GST
105
190
19950
... More
Construction of Subgrade and Earthen Shoulders
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.. Including all taxes and labour cess but excluding GST
120
95
11400
... More
Laying 350 mm dia reinforced cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling,concrete and masonary works in head walls and parapets.. Including all taxes and labour cess but excluding GST
20
1900
38000
... More
Maintenance of constructed Bitumenus road for next five yrears after completion the contractor shall be paid total maintenance cost for five year in the form of installment as below, The payment shall the inclusive of cess but excluding GST. Payment shall be done as per satisfaction of engineer in charge regarding maintenance work carried out by contractor.. (Including Labour cess but Excluding GST)
(i) From completion of 1 Year to 2nd year 15.00% of 10%
0.4
17200
6880
... More
(ii) 2nd year to 3rd year 20%
0.4
34300
13720
... More
(iii) 3rd year to 4th year 30%
0.4
51600
20640
... More
(iv) 4th year to 5th year 40%
0.4
68900
27560
... More
Maintenance of constructed C.C road for next five yrears after completion the contractor shall be paid total maintenance cost for five year in the form of installment as below, The payment shall the inclusive of cess but excluding GST. Payment shall be done as per satisfaction of engineer in charge regarding maintenance work carried out by contractor.. (Including Labour cess but Excluding GST)
(i) From completion of 1 Year to 2nd year 2.50% of 10%
0.2
17900
3580
... More
(ii) 2nd year to 3rd year 20%
0.2
35900
7180
... More
(iii) 3rd year to 4th year 30%
0.2
53900
10780
... More
(iv) 4th year to 5th year 40%
0.2
71900
14380
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements