Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date30 Dec 2024
Closing Date12 Feb 2025
Tender Amount₹ 40,00,00,000
Costs
EMD
₹ 50,00,000Document Cost
₹ 2,714Tender Fee
Refer Documents
Summary
Widening And Strengthening Of Kumarganj Kamakhya Dham Medha Rishi Ashram Road Odr
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEUFZ_987462_1Tender No
8286/54(I)Com(CD-4)-Ayo/Ambd Circle Dt 06.12.2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.Using Grader.
5108
-
-
... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.(1% OPC Cement + 3.5% Emulsion)
14630
-
-
... More
Providing and applying tack coat VG-10 using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bitumenous surface cleaned with mechanical broom.
146300
-
-
... More
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects
6745
-
-
... More
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 310 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing
2420
-
-
... More
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
9000
-
-
... More
Construction of U-Type Drain size 300mmx450mm -Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
2000
-
-
... More
Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days.
245
-
-
... More
Providing and laying reinforced cement concrete M 20 grade in superstructure as per drawing and technical specifications clauses 800, 1205.4 and 1205.5
765
-
-
... More
Supplying fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and Technical Specifications clauses 1002, 1010 and 1202
50
-
-
... More
Exetention of Hume pipe Culvert -Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
448
-
-
... More
Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days.
44.8
-
-
... More
First Class brick work in 1 : 3 cement and course sand in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion of the work. As per SI no 305(b)
323
-
-
... More
Ruled pointing in 1:3 cement and fine sand mortar on brick work including supply of all materials, labour and T and P etc Requuired for proper completion of work as per S.I No. 574.
770
-
-
... More
Supply & laying of 350mm dia NP3 hume pipe including fixing of collar with 1:2 cement mortar.
150
-
-
... More
Supply & laying of 600mm dia NP3 hume pipe including fixing of collar with 1:2 cement mortar.
75
-
-
... More
Supply & laying of 900mm dia NP3 hume pipe including fixing of collar with 1:2 cement mortar.
50
-
-
... More
Plaster 12 mm thick in 1:3 cement & coarse sand mortar for proper completion of work. SI No-583
82
-
-
... More
Extension of RCC culvert 1.5m span and 3.00 span-Earth-work Excavation in trenches for foundations pipes, cable etc,(Loan clay or sand) including lift upto 1.5m lead upto 50m. And dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer i/c within ahead of 30m.
230
-
-
... More
Providing and laying Cement concrete 1:3:6 (1 cement : 3 fine sand : 6 graded brick aggregate 40 mm. nominal size) including supply of all materials, labour and T & P etc. required for proper completion of the work and curing complete, also including cost of formwork in foundation and floors. as per SI No. 281 Qty as per attached sheet
60
-
-
... More
Class-150 brick work in 1:4Cement and Coarse sand of mortar infoundation and plinth including supply of all materials, labour and tools and plants,etc ,required for proper completion of the work.
80
-
-
... More
Class-150 brick work in 1;3 Cement and Coarse sand of mortar in Sub Structure including supply of all materials, labour and tools and plants,etc ,required for proper completion of the work.
117
-
-
... More
R.C.C. M-20 work with cement approved coarse sand and 2 cm. (3/4") gauge approved stone ballast in the proportion of 1:1.5:3, in lintels of doors and windows excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shutteringe etc. and also including supply of all materials, labour and T&P etc. required for proper completion of the work. Binding wire cost being included in the item.
25.4
-
-
... More
Mild steel or iron in plan work such as reinforced concrete or reinforced brick work(When not included in an overall rates). Wrought to required shape as necessary including bending for proper completionof the work and including supply of steel its wastage bend hooks and authorised ovelapping shall be measured upto floor two level.
2
-
-
... More
Supplying and laying one layer of tar felt or any other equivalent approved material at the junction of wall and roof of any place an roof as per direction of E/I including necessaryoverlap, giving a coat of approved mastic paint belowthe Tar felt and including supply of all materials , labour and tools and plants etc.Required for propercompletion of work fix as per standard.
20
-
-
... More
Supply and fixing of 10cm internal Dia Ac Down pipes required for proper completion of work in weep holes.
80
-
-
... More
Plain cement concrete. 1:3:6 mix with crushed stone aggregate 40mm nominal size mechanically mixed placed in foundation and compacted vibration i/c curing 14 days. SI No-280 Qty as per attached sheet
4
-
-
... More
Struck Pointing on brick work with cement mortar 1:3 (1Cement :3 sand)
200
-
-
... More
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 1st year maintenance cost @ 0.00% as per circular No-3689 C-OPRMC/Mool/23-24 Dt 17.02.2024
1
-
-
... More
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 0.25% as per circular No-3689 C-OPRMC/Mool/23-24 Dt 17.02.2024
1
-
-
... More
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @ 0.50% as per circular No-3689 C-OPRMC/Mool/23-24 Dt 17.02.2024
1
-
-
... More
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 0.75% as per circular No-3689 C-OPRMC/Mool/23-24 Dt 17.02.2024
1
-
-
... More
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 1.00% as per circular No-3689 C-OPRMC/Mool/23-24 Dt 17.02.2024
1
-
-
... More
Total cost of work (item No- 1 to 32) without maintenance cost
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%