If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date9 Nov 2024
Closing Date16 Nov 2024
Tender Amount₹ 59,77,173.17 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades as per MORD specifiction clause 508. Including cost of, all material, Bitumen, labour, T&P, royality , all taxes and labour cess complete. But excluding GST.

3000

187

561000

... More
Providing and laying seal coat by manual means with VG-10 Grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510. Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST.

3000

71

213000

... More
Earth work in cutting or in embankment in ordinary soil to be in the from of borrow pits not exceeding 0.50M in depth and earth work in embankment to be in 20cm layers including remming and dressing the surface to requirment levels and slope and also including 1.50M lift and 30M lead . the earth from cutting to be used in making embankment or be deposited as spoil banks with in 30M distance as directed by the engineer in charge with 1km cartage SOR No- 253 (a) Including cost of, all material, Bitumen, labour, T&P, royality , all taxes and labour cess complete. But excluding GST.

540

165

89100

... More
Part - B ( CC Work) Providing, laying, spreading and compacting stone aggregates of 22.4-53 mm sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST.

68

4000

272000

... More
Construction of un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and construction joints, applying debonding strips, primer, sealant, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified) and water finishing to lines and grade as per drawing and finished with Power Trowel Cum Floter-Trimix Flooring Machine.Technical Specification Clause 1501. Including complete shifting of matrials & Concrete etc and cost of all material, labour, T&P, royality, all taxes and labour cess complete . But excluding GST.

140.63

8050

1132071.5

... More
Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplusearth as directed by the Engineer-in-charge upto a distance of 30 M. from the foundation trenches. (Where machine can not reach/move). SOR No. 251(a) as per direction of E/I including cost of all material, labour, royalty, T&P and all other taxes as applicable but excluding cost of GST.

117

110

12870

... More
Providing and laying Cement Concrete with 4 cm gauge approved stone ballast, coarse sand & cement in the proportion of 8:4:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work SOR No- 281 as per direction of E/I including cost of all material, labour, royalty, T&P and all other taxes as applicable but excluding cost of GST.

23

6100

140300

... More
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202, 1204 and 12.5.800 R.C.C grade M 20 with 2 cm gauge approved stone grit, coarse sand & cement in the proportion of 3:1.5:1. Including cost of all labour, T&P, royalty, Labour cess and all taxes complete but excluding GST.

41

7750

317750

... More
Supplying, fitting and placing MS bar reinforcement Fe 415 in substructure complete as per drawings and technical specifications Clauses 1002 1005 1010 and 1202 as per direction of E/I including cost of all material, labour, royalty, T&P and all other taxes as applicable but excluding cost of GST.

2.55

78500

200175

... More
Earth work in cutting or in embankment in ordinary soil to be in the from of borrow pits not exceeding 0.50M in depth and earth work in embankment to be in 20cm layers including remming and dressing the surface to requirment levels and slope and also including 1.50M lift and 30M lead . the earth from cutting to be used in making embankment or be deposited as spoil banks with in 30M distance as directed by the engineer in charge with 1km cartage SOR No- 253 (a) Including cost of all material, labour, T&P, all taxes and labour cess complete. But excluding GST.

540

165

89100

... More
Part - A (Bitiminous Work) 05 years Maintenance Charge @15% Routine maintenance of road for 05 years after the completion of work vide GO No. - 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 & Latter No. 36890C/RMC/Mool-23-24, Date 17.02.2024 of ENC PWD, Lucknow Rate Excluding Cost of G.S.T. First year Maintenance Charge @ 0.00%

3346000

-

-

... More
Second year Maintenance Charge @ 1.50 %

3346000

-

50190

... More
Third year Maintenance Charge @ 3.00%

3346000

-

100380

... More
Fourth year Maintenance Charge @ 4.50%

3346000

-

150570

... More
Fifth year Maintenance Charge @ 6.00%

3346000

-

200760

... More
Part - B (C.C. Work) 05 years Maintenance Charge @ 2.5% Routine maintenance of road for 05 years after the completion of work vide GO No. - 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 & Latter No. 36890C/RMC/Mool-23-24, Date 17.02.2024 of ENC PWD, Lucknow Rate Excluding Cost of G.S.T. First year Maintenance Charge @ 0.00%

2164266.5

-

-

... More
Second year Maintenance Charge @ 0.25 %

2164266.5

-

5410.67

... More
Third year Maintenance Charge @ 0.50%

2164266.5

-

10821.33

... More
Fouth year Maintenance Charge @ 0.75%

2164266.5

-

16232

... More
Fifth year Maintenance Charge @ 1.00%

2164266.5

-

21642.67



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.