Public Works Department Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date12 Mar 2025
Closing Date22 Mar 2025
Tender Amount₹ 65,65,72,000
Costs
EMD
₹ 67,31,000Document Cost
₹ 2,714Tender Fee
Refer Documents
Summary
Widening And Strengthening (including Bypass) Of Aligarh-ramghat Road (kalyan Singh Road) (mdr-105) In Km. 40 To 44 From Two Lane To Four Lane
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_CEMRT_1016967_1Bid Award Id
ViewTender No
1630/96M(II)/E-TENDER/BSR CIRCLE/2024-25 Dated 20-02-2025Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (Lead 3.00 KM) Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST.
229500
-
-
... More
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. MORT&H Specification 401 Sr No 4.1 Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST.
24500
-
-
... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST.
18900
-
-
... More
Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST.
104500
-
-
... More
Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.25 kg per sqm on the prepared Granular surface treated with primer cleaned with mechanical broom.Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST.
69460
-
-
... More
Providing and laying dense graded bituminous macadam (Grade-I) with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 4.0 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects..Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST.
9950
-
-
... More
Providing and laying dense graded bituminous macadam (Grade-II) with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects..Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST.
2478
-
-
... More
Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared Granular surface treated with primer cleaned with mechanical broom.Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST.
168600
-
-
... More
Providing and laying bituminous concrete (Gr-II) with 120 TPH batch type hot mix plant using crushed aggregates from approved quarry of specified grading, premixed with bituminous binder (VG-30) @ 5.40 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction. as per MORTH specification clause No. 507 complete in all respects Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST.
3570
-
-
... More
Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately As per Morth clause 202.(2.05 ii B) Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST.
825
-
-
... More
Construction of cement concrete kerb with channel with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M15 grade foundation 150 mm thick, kerb channel 300 mm wide, 50 mm thick in PCCM20 grade, sloped towards the kerb, kerb stone with channel laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 409
12178
-
-
... More
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. (For Drain & Culvert)
130
-
-
... More
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications. Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. (For H.P. Culvert)
200
-
-
... More
RCC Grade M20 using batching plant transit mixer & manual placing as per Drawing and Technical Specifications Clause 12.08 (1500, 1700 & 2100). Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. (For Drain)
312
-
-
... More
Sand Filling in Foundation Trenches as per Drawing & Technical Specification (As per Morth Sl.N. 15.03) Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. (For Culvert)
248
-
-
... More
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. (PCC Grade M15) As per Morth Clause 15.11 Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. (For Culvert)
274
-
-
... More
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification As per Morth Clause 15.15. Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. (For Culvert)
207
-
-
... More
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. (PCC Grade M20) As per Morth Clause 15.11 Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. (For Culvert)
728
-
-
... More
RCC Grade M30 using batching plant transit mixer & manual placing (RCC Grade M30). As per Morth Clause 15.11(G). Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. (For Culvert)
263
-
-
... More
Plain/Reinforced Cement Concrete for wall & slab etc. complete as per Drawing and Technical Specifications. (RCC Grade M30). As per Morth Clause 15.12. Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. (For Culvert)
869
-
-
... More
Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification. As per Morth 15.16. Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. (For Culvert)
352
-
-
... More
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. As per Morth Clause 15.13. Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. (For Culvert)
229
-
-
... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification (As per Morth Sl.N.15.23). Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. (For Culvert)
657
-
-
... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. As per Morth Clause 15.18.Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. (For Culvert)
130
-
-
... More
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 110 mm dia PVC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. (For Culvert)
720
-
-
... More
Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans not exceeding 10 m to cater for a horizontal movement upto 20 mm, covered with sealant complete as per drawing and technical specifications.. as per MoRT&H Specification 2605(iii).14.17 Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. (For Culvert)
288
-
-
... More
Flexible Apron: Construction of flexible apron 750mm thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall. (As per Morth Sl.N. 16.11). Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. (For Culvert)
535
-
-
... More
Providing and laying Flooring complete as per drawing and Technical specifications laid over cement Concrete bedding. (As per Morth Sl.N. 16.08(A)) (Including 100 mm thick PCC Bed. Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. (For Culvert)
146
-
-
... More
Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications as per clause 13.02 (1300 & 2200) Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. (For Culvert)
340
-
-
... More
Supply ,Laying & Fixing of NP-3 Hume Pipe 350 mm dia. Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST.
160
-
-
... More
Supply ,Laying & Fixing of NP-3 Hume Pipe 600 mm dia. Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST.
160
-
-
... More
Providing & laying of 1000 mm hume pipe in position including supply of all material, labour, T&P all taxes, labour cess etc. required for proper completion of work as per direction of Engineer In-charge .(SI. No. New Item 20.27(B)(IV))etc. required for proper completion of work as per PWD specifications. Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. (For Culvert)
200
-
-
... More
Removing all type of Hume Pipes and Stacking within a lead of 1000 metres including Earthwork and Dismantling of Masonry Works. As per MORT&H Specification cluase 2.4(ix) C. Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. (For Culvert)
200
-
-
... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres As per Clause 202 (Dismantling Brick / Tile work). Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. (For Minor Bridge)
87
-
-
... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres As per Clause 202 (Cement Concrete Grade M-15 & M-20). Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. (For Minor Bridge)
23
-
-
... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally. As per Morth Clause 304(B). Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. (For Minor Bridge)
1092
-
-
... More
Sand Filling in Foundation Trenches as per Drawing & Technical Specification (As per Morth Sl.N. 15.03) Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. (For Minor Bridge)
64
-
-
... More
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. (PCC Grade M15) As per Morth Clause 15.11 Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. (For Minor Bridge)
121
-
-
... More
RCC Grade M20 using batching plant & Manual Placing. (PCC Grade M20) As per Morth Clause 15.11. Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. (For Minor Bridge)
181
-
-
... More
RCC Grade M30 using batching plant transit mixer & manual placing (RCC Grade M30). As per Morth Clause 15.11(G). including supply of all material, labour, T&P all taxes,labour cess etc. required for proper completion of work as per direction by the Engineer In-charge (Sub Structure). Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. (For Minor Bridge)
117
-
-
... More
Plain/Reinforced Cement Concrete for wall & slab etc. complete as per Drawing and Technical Specifications. (RCC Grade M30). As per Morth Clause 15.12(C) . including supply of all material, labour, T&P all taxes,labour cess etc. required for proper completion of work as per direction by the Engineer In-charge (Super Structure). Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. (For Minor Bridge)
242
-
-
... More
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. As per Morth Clause 13.06. Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST.
(For Minor Bridge)
34
-
-
... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification (As per Morth Sl.N. 15.23). Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. (For Minor Bridge)
92
-
-
... More
Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans not exceeding 10 m to cater for a horizontal movement upto 20 mm, covered with sealant complete as per drawing and technical specifications. 15.22 (2605). Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. (For Minor Bridge)
67
-
-
... More
Providing weep holes in Brick masonry/ Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and Technical Specifications (As per Morth Sl.N. 15.14). Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST.
(For Minor Bridge)
56
-
-
... More
Drainage Spouts complete as per drawing and Technical specification (As per Morth Sl.N. 15.17). Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST.
(For Minor Bridge)
16
-
-
... More
Flexible Apron: Construction of flexible apron 750mm thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall. (As per Morth Sl.N. 16.11). Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST.
(For Minor Bridge)
288
-
-
... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. (For Minor Bridge)
37
-
-
... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. As per Morth Clause 14.04 (2702). Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. (For Minor Bridge)
17
-
-
... More
Brick on edge pavment on both sides of Road patries with straight over burnt brick with bricks,laid dry joints fileed with local sand including prepartion of base with proper slope and its ramming,spreading laying of 1 cm(3/8") depth of local sand over the subgrade etc. required for proper completion of work as per PWD specifications. Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. (For Minor Bridge)
825
-
-
... More
Providing & laying of 1000 mm hume pipe in position including supply of all material, labour, T&P all taxes, labour cess etc. required for proper completion of work as per direction of Engineer In-charge .(SI. No. New Item 20.27(B)(IV))etc. required for proper completion of work as per PWD specifications. Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. (For Minor Bridge)
87.5
-
-
... More
Removing all type of Hume Pipes and Stacking within a lead of 1200 metres including Earthwork and Dismantling of Masonry Works. As per MORT&H Specification cluase 2.4(ix) C. Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. (For Minor Bridge)
87.5
-
-
... More
Proding & fixing empty cement bag filled by local earth, hand sewing with suja & sutli and placing in position with in 60 M.Iincluding cost of E.C. Bags, all labour, material and T&P required for proper completion of work. But excluding cost of GST. (For Minor Bridge)
2000
-
-
... More
Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. (For Minor Bridge)
134
-
-
... More
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days As per MORT&H Specification Clause 12.4(2100). Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. (For Minor Bridge)
8.1
-
-
... More
Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications.As per MORT&H Specification Clause 13.1(1300 & 2200). Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. (For Minor Bridge)
27
-
-
... More
Providing and laying filter material underneath pitching in slopes complet as per drawing and Technical specification. MoRT&H spec. 2504. Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. (For Minor Bridge)
57
-
-
... More
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specification. Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST. (For Minor Bridge)
92
-
-
... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35-2015 The finished surface to be level, uniform and free from streaks and holes. Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST.
3741
-
-
... More
Providing and laying of hot applied thermoplastic compound 5 mm thick including reflectorising glass beads @ 500 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35-2015 The finished surface to be level, uniform and free from streaks and holes. Including cost of all material, labour, T&P, royality, labour cess and all taxes complete but excluding cost of GST.
43
-
-