Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date16 Nov 2024
Closing Date22 Nov 2024
Tender Amount₹ 32,47,000
Costs
EMD
₹ 3,24,700Document Cost
₹ 950Tender Fee
Refer Documents
Summary
Sr Of Hatheda Linkroad (construction Cost For 05 Years Maintenance Including 15 Percent For Pc Work And 2.50 Pecent For Cc Work)
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEMRZ_971900_15Bid Award Id
ViewTender No
4040/Nivida/2024-25 Dated 29-10-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510
2700
65
175500
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,
270
7380
1992600
Earth work in patries both one side of road. Excavation to be in inordinary black with moorum soil form of regular pits not excceding 0.50 m in depth and earth work in embankment in 20 cm layers including ramming and dressing the surface to required lavels and slopes and also including 1.5 m lift and 30 m lead including all labour. T&P etc complete as per direction of Engineer-in-charge
300
80
24000
CONSTRUCTION OF HP-350MM Culvert
Earth work in excavation in foundation in moorum/single/ kankar requiring the used of specal T&P such as pixckaxes subbals etc including all labour T&P royality etc all complete.
8
110
880
Supply and laying of local sand in trench including ramming, dressing, watering etc. including cost of all material, labour etc. complete. (within 8 km.) SI No. 255
1.8
650
1170
Cement concrete with 4 cm gauge stone ballast coarse sand and cement in the proportion 8:4:1 including cost of all material, labour etc. complete. SI No. 281
1.9
4900
9310
RCR stone masonary in 1:4 cement chopan caorse sand mortar in cluding all labour T&P etc complete
4.3
3850
16555
Struck pointing 1:2 cement and fine sand mortar on both visibule face of end wall in parapet.
10.4
165
1716
Providing and laying 350 mm dia N.P-3 H.P. jointing with coller in proper position including cost of cement , jute etc. required for proper completion of work. Laying
7.5
1000
7500
Providing and laying 350 mm dia N.P-3 H.P. jointing with coller in proper position including cost of cement , jute etc. required for proper completion of work. Pipe
3
250
750
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements