Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date17 Dec 2024
Closing Soon23 Dec 2024
Tender Amount₹ 3,89,60,000
Costs
EMD
₹ 21,48,000Document Cost
₹ 2,720Tender Fee
Refer Documents
Summary
Widening And Strengthening Of Dudhnath Tiraha To Lalbhairo Mandir Via Bartar Tiraha Road (odr) (5 Years Maintenance 2.50 Percent Of The Cost Of Construction Work)
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEMRZ_984042_1Tender No
5886/53M-Mzp Circle/2024-25 Dt. 11-12-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
G.S.B.Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete. (Two layer)
2752
1850
5091200
... More
Providing, laying spreading and compacting well graded stone aggregates as wet mix macadam specification including premixing the material at OMC in mechanical WMM mixing plant, carriage of mixed material by tipper to site and laying with paver in base course on well prepared surface, compacting with vibratory roller to achieve the desired density. Including cost of material, T&P, labour and all taxes etc. for proper completion of the work. Complete work as per MORT&H specification No. 406.
1530
2228
3408840
... More
Providing and applying prime coat with slow setting bitumen emlusion on prepared surface of Granular Base including cleaning of road surface and spraying primer @ 0.70 kg. per sqm. using machenical means as per MORT&H
20000
34
680000
... More
Dense Graded Bituminous Macadam Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects. (Grade-II)
1000
10030
10030000
... More
Providing and applying tack coat with medium setting bitumen emulsion using Bitumen pressure dristributor @ 0.20 kg. per sqm. on the prepared bituminous surface As per MORT&H Clause 503
20000
10
210000
... More
Bituminous ConcreteProviding and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonne per hour using crushed aggregates of specified grading premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specifications Clause 509 complete in all respects.
600
11150
6690000
... More
Construction of subgrade and earthen shoulders with approved material obtained from borrowpits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement to Table 300-2 (without lead) (patri work)
1240
124
153760
... More
Earth work in excavation in foundation in moorum/single/ kankar requiring the used of specal T&P such as pixckaxes subbals etc including all labour T&P royality etc all complete.
317.08
110
34879.17
... More
Supply and laying of local sand in trench including ramming, dressing, watering etc. including cost of all material, labour etc. complete. (within 8 km.) SI No. 255
51.7
650
33605
... More
Cement concrete with 4 cm gauge stone ballast coarse sand and cement in the proportion 8:4:1 including cost of all material, labour etc. complete. SI No. 281
316.3
4680
1480284
... More
RCR stone masonary in 1:3 cement chopan caorse sand mortar in cluding all labour T&P etc complete
151.25
4000
605000
... More
Struck pointing 1:2 cement and fine sand mortar on both visibule face of end wall in parapet.
267.5
51
13642.5
... More
Providing and laying 350 mm dia N.P-3 H.P. jointing with coller in proper position including cost of cement , jute etc. required for proper completion of work. Laying
80
1000
80000
... More
Providing and laying 350 mm dia N.P-3 H.P. jointing with coller in proper position including cost of cement , jute etc. required for proper completion of work. Pipe
32
250
8000
... More
Providing and laying 600 mm dia N.P-3 H.P. jointing with coller in proper position including cost of cement , jute etc. required for proper completion of work. Laying
60
1700
102000
... More
Providing and laying 600 mm dia N.P-3 H.P. jointing with coller in proper position including cost of cement , jute etc. required for proper completion of work. Pipe
24
400
9600
... More
Providing and laying 1000 mm dia N.P-3 H.P. jointing with coller in proper position including cost of cement , jute etc. required for proper completion of work. Laying
20
3700
74000
... More
Providing and laying 1000 mm dia N.P-3 H.P. jointing with coller in proper position including cost of cement , jute etc. required for proper completion of work. Pipe
8
450
3600
... More
R.C.C. in 1:2:4 with one part of cement 2 part coarse sand and 4 part of 20 mm gauge hard stone grit in slab and bed block including all taxes, royality but excluding cost of steel including supply of all material, labour, T&P and etc. required for proper completion of the work as per direction of E/I.
698
6560
4578880
... More
M.S. iron work such as in reinforced concrete work wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage. Bend hooks and authorized overlapping shall be measured. As per SI No 504 as per direction of E/I.
438
5400
2365200
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%