Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date24 Dec 2024
Closing Soon7 Jan 2025
Tender Amount₹ 1,13,20,000
Costs
EMD
₹ 7,66,000Document Cost
₹ 4,082Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEKNP_986473_7Tender No
6969C/131C-KV/2024-25 Dt. 07.12.2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Tack Coat (i) Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.35 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.Clause 503. MORD
7125
16
114000
... More
20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type C as per Technical Specification Clause 508. Case - II By Mechanical Means(HMP 30/40) (I) Bitumen VG-10
7125
160
1140000
... More
Seal Coat Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 Case - III : Type C By Mechanical Means(HMP 30/40) (I) Bitumen VG-10
7125
50
356250
... More
Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1..
1920
75
144000
... More
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3
80
20
1600
... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10 (i) Nominal mix 1:3:6
10.5
5730
60165
... More
Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 II. Brick masonry in 1:4 cement mortar
33
6580
217140
... More
Pointing with Cement Mortar (1:3) on brickwork as per technical specification Clause MORD 613.3
89
80
7120
... More
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204
7.5
190
1425
... More
Providing and laying reinforced cement concrete pipe NP3 on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1100.(350 mm Dia Hume Pipe Gule)
30
1520
45600
... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1100.(750 mm Dia Hume Pipe )
15
3500
52500
... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1100.(1000 mm Dia Hume Pipe)
15
5700
85500
... More
Lettering and painting of culvert and parapet etc. complete.
4
1000
4000
... More
Providing and fixing of kilometre,hectometre and sign board etc all comp.work
2
15000
30000
... More
Maintenance of bituminous surface road and / or gravel road and / or WBM road including filling of pot holes and patch repair etc., restoration of rain cuts and dressing of side slopes / berms, making up of berms / shoulders,maintenance of drains, maintenance of guard rail and parapets, maintenance of road signs, speed breakers, standing tree adjacent to road wherever required, maintenance of 200m (hectometre stone) and kilometre stones,cutting of branches of trees, shrubs and trimming of grass and weeds etc.,white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per erformance Index Annexure-1) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated 16.01.2024 & Enc Letter no. 3689/COPRMC/MUL-2023-24 dated 17.02.2024)
Maintinance of 1st year cost of Work @ 0.00% of total work of amount Item No. 1to 16
1
-
-
... More
Maintenance of bituminous surface road and / or gravel road and / or WBM road including filling of pot holes and patch repair etc., restoration of rain cuts and dressing of side slopes / berms, making up of berms / shoulders,maintenance of drains, maintenance of guard rail and parapets, maintenance of road signs, speed breakers, standing tree adjacent to road wherever required, maintenance of 200m (hectometre stone) and kilometre stones,cutting of branches of trees, shrubs and trimming of grass and weeds etc.,white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per erformance Index Annexure-1) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated 16.01.2024 & Enc Letter no. 3689/COPRMC/MUL-2023-24 dated 17.02.2024)
Maintinance of 2nd year cost of Work @ 1% of total work of amount Item No. 1to 16
1
92362
92362.3
... More
Maintenance of bituminous surface road and / or gravel road and / or WBM road including filling of pot holes and patch repair etc., restoration of rain cuts and dressing of side slopes / berms, making up of berms / shoulders,maintenance of drains, maintenance of guard rail and parapets, maintenance of road signs, speed breakers, standing tree adjacent to road wherever required, maintenance of 200m (hectometre stone) and kilometre stones,cutting of branches of trees, shrubs and trimming of grass and weeds etc.,white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per erformance Index Annexure-1) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated 16.01.2024 & Enc Letter no. 3689/COPRMC/MUL-2023-24 dated 17.02.2024) Maintinance of 3rd year cost of Work @ 1.50% of total work of amount Item No. 1to 16
1
138543
138543.45
... More
AMaintenance of bituminous surface road and / or gravel road and / or WBM road including filling of pot holes and patch repair etc., restoration of rain cuts and dressing of side slopes / berms, making up of berms / shoulders,maintenance of drains, maintenance of guard rail and parapets, maintenance of road signs, speed breakers, standing tree adjacent to road wherever required, maintenance of 200m (hectometre stone) and kilometre stones,cutting of branches of trees, shrubs and trimming of grass and weeds etc.,white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per erformance Index Annexure-1) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated 16.01.2024 & Enc Letter no. 3689/COPRMC/MUL-2023-24 dated 17.02.2024) Maintinance of 4th year cost of Work @ 2% of total work of amount Item No. 1to 16
1
184724
184724.6
... More
Maintenance of bituminous surface road and / or gravel road and / or WBM road including filling of pot holes and patch repair etc., restoration of rain cuts and dressing of side slopes / berms, making up of berms / shoulders,maintenance of drains, maintenance of guard rail and parapets, maintenance of road signs, speed breakers, standing tree adjacent to road wherever required, maintenance of 200m (hectometre stone) and kilometre stones,cutting of branches of trees, shrubs and trimming of grass and weeds etc.,white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per erformance Index Annexure-1) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated 16.01.2024 & Enc Letter no. 3689/COPRMC/MUL-2023-24 dated 17.02.2024)
Maintinance of 5th year cost of Work @ 3% of total work of amount Item No. 1to 16
1
277086
277086.9
... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density as per MORD specification 401
39
2800
109200
... More
WBM Grading 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (A) By Manual Means
28
3400
95200
... More
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing
56
7500
420000
... More
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3
48
20
960
... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10 (i) Nominal mix 1:3:6
9.5
5730
54435
... More
Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 II. Brick masonry in 1:4 cement mortar
20.5
6580
134890
... More
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204
90
190
17100
... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 IV. R.C.C grade M 20
5
6680
33400
... More
Supplying, fitting and placing HYSD bar reinforcement in foundation as per drawing and Technical Specification clause 1000 & 1202
120
80
9600
... More
Maintenance of Concrete surface including Crack Sealing spot patching,restoration of rain cuts and dressing of side slopes / berms, making up of berms / shoulders, maintenance of drains, maintenance of culverts and cause ways, maintenance of guard rails and parapet, maintenance of road signs, speed breakers, standing trees adjacent to road wherever required. maintenance of 200m (hectometre stone) and kilometre stones, cutting of branches of trees, shrubs and trimming of grass and weeds etc., white washing of parapets including CD works, painting of guard stones, re-fidding of displaced guard stones (as per performance Index Annexure-2) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated16.01.2024 & Enc Letter No. 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024) (I) Maintenance of First Year (@ 0% of Total Work Amount of Item no 22 to 30
1
-
-
... More
Maintenance of Concrete surface including Crack Sealing spot patching,restoration of rain cuts and dressing of side slopes / berms, making up of berms / shoulders, maintenance of drains, maintenance of culverts and cause ways, maintenance of guard rails and parapet, maintenance of road signs, speed breakers, standing trees adjacent to road wherever required. maintenance of 200m (hectometre stone) and kilometre stones, cutting of branches of trees, shrubs and trimming of grass and weeds etc., white washing of parapets including CD works, painting of guard stones, re-fidding of displaced guard stones (as per performance Index Annexure-2) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated16.01.2024 & Enc Letter No. 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024) Maintinance of 2nd year cost of Work @ 0.25% of total work of amount Item No. 22 to 30
1
2186
2186.96
... More
Maintenance of Concrete surface including Crack Sealing spot patching,restoration of rain cuts and dressing of side slopes / berms, making up of berms / shoulders, maintenance of drains, maintenance of culverts and cause ways, maintenance of guard rails and parapet, maintenance of road signs, speed breakers, standing trees adjacent to road wherever required. maintenance of 200m (hectometre stone) and kilometre stones, cutting of branches of trees, shrubs and trimming of grass and weeds etc., white washing of parapets including CD works, painting of guard stones, re-fidding of displaced guard stones (as per performance Index Annexure-2) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated16.01.2024 & Enc Letter No. 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024) Maintinance of 3rd year cost of Work @ 0.50% of total work of amount Item No. 22 to 30
1
4373
4373.93
... More
Maintenance of Concrete surface including Crack Sealing spot patching,restoration of rain cuts and dressing of side slopes / berms, making up of berms / shoulders, maintenance of drains, maintenance of culverts and cause ways, maintenance of guard rails and parapet, maintenance of road signs, speed breakers, standing trees adjacent to road wherever required. maintenance of 200m (hectometre stone) and kilometre stones, cutting of branches of trees, shrubs and trimming of grass and weeds etc., white washing of parapets including CD works, painting of guard stones, re-fidding of displaced guard stones (as per performance Index Annexure-2) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated16.01.2024 & Enc Letter No. 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024) Maintinance of 4th year cost of Work @ 0.75% of total work of amount Item No. 22 to 30
1
6560
6560.89
... More
Maintenance of Concrete surface including Crack Sealing spot patching,restoration of rain cuts and dressing of side slopes / berms, making up of berms / shoulders, maintenance of drains, maintenance of culverts and cause ways, maintenance of guard rails and parapet, maintenance of road signs, speed breakers, standing trees adjacent to road wherever required. maintenance of 200m (hectometre stone) and kilometre stones, cutting of branches of trees, shrubs and trimming of grass and weeds etc., white washing of parapets including CD works, painting of guard stones, re-fidding of displaced guard stones (as per performance Index Annexure-2) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated16.01.2024 & Enc Letter No. 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024)
Maintinance of 5th year cost of Work @ 1.00% of total work of amount Item No. 22to 30
1
8747
8747.85
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%