Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date14 Nov 2024
Closing Date10 Dec 2024
Tender Amount₹ 52,85,000
Costs
EMD
₹ 4,65,000Document Cost
₹ 2,714Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEUVZ_973865_9Tender No
96/Camp/SE Tender/jnp-gzp circle/24 date 14-10-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Providing and applying tack coat with bitumen VG-10 using bitumen distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with hydraulic broom as per Technical Specification Clause 503 (I) (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )
11580
15
173700
Providing, laying and rolling of open graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 (13.2mm & 11.20mm in 2:1) mm aggregates either using penetration grade bitumen VG-10 to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type C as per Technical Specification Clause 508(Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )
11580
180
2084400
Providing and laying seal coat sealing 6.7mm stone grit @0.009 cum per sqm the voids in a bituminous grade VG-10 @0.65kg per sqm surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )
11580
64
741120
Construction of un-reinforced expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M 30 (Grade), coarse and fine aggregates conforming to IS: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete withshovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )
153
7800
1193400
Construction of Subgrade and earthen shoulders with approved material obtained from R.O.W. with all lift and leads, transporting to site, spresding grading to reqiire slope and compacted to meet requirement of Tables 300.2 as per Technical Specification Clause 303.1 (in patri work) (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but excluding GST ) For Bitumenus Work
1500
61
91500
Construction of Subgrade and earthen shoulders with approved material obtained from R.O.W. with all lift and leads, transporting to site, spresding grading to reqiire slope and compacted to meet requirement of Tables 300.2 as per Technical Specification Clause 303.1 (in patri work) (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but excluding GST ) For CC Work
130
61
7930
PART A
Maintainance cost :- Maintainance cost will be paid year wise as per Government order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD,Lucknow order No. 3689COPRMC/Mul-23-24 Date 17.02.2024
0.5
-
-
1st year- maintainance cost 0% on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
3.86
-
-
2nd year- maintainance cost 1.5% on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
3.86
14221
54893.1
3rd year- maintainance cost 3.00 % on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
3.86
28442
109786.2
4th year- maintainance cost 4.50% on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
3.86
42663
164679.3
5th year- maintainance cost 6.00 % on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
3.86
56884
219572.4
PART B
Maintainance cost :- Maintainance cost will be paid year wise as per Government order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD,Lucknow order No. 3689COPRMC/Mul-23-24 Date 17.02.2024
0.5
-
-
1st year- maintainance cost 0% on CC Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
0.34
-
-
2nd year- maintainance cost 0.25% on CC Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
0.34
9984
3394.75
3rd year- maintainance cost 0.50 % on CC Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
0.34
19969
6789.5
4th year- maintainance cost 0.75% on CC Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
0.34
29953
10184.25
5th year- maintainance cost 1.00 % on CC Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
0.34
39938
13579
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%