If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Road Construction
Eprocure
Opening Date25 Nov 2024
Closing Soon16 Jan 2025
Tender Amount₹ 25,71,00,000
Costs
EMD
₹ 38,57,000Document Cost
₹ 5,590Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEUVZ_975055_1Tender No
89/Camp/SE Tender/jnp-gzp circle/24 date 14-10-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (WMM) as MORTH clause 406 b (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )
16613
-
-
... More
Providing and applying primer coat with bitumen slow setting emulsion on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.as MORTH clause 502 (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )
82643
-
-
... More
Providing and laying dense graded bituminous macadam with higher capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause 505 complete in all respects. (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )
6606
-
-
... More
Providing and laying tack coat with bitumen VG-10 using emulsion distributer at the rate of 0.20 Kg / Sqm. on the prepared granular surface treated with primer and cleaned with hydraulic broom as per technical specification clause 503 (I) (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )
82643
-
-
... More
Providing and laying bituminous concrete with higher capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction. As per MORTH clause 507 (b) complete in all respects (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST )
2479
-
-
... More
Construction of un-reinforced, dowel jointed, plain cement concrete pavement (M-35) over a prepared sub base with approve grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, (Grade M40) maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing. as MORTH clause 602 (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )
1015
-
-
... More
Earth work in excavation of foundation as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. As per MORTH clause 304 b (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST ) (For Drain and Structure)
1413
-
-
... More
PCC M15 in Foundation Plain cement concrete M15 in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundationand compacted by vibration including curing for 14 days foundation. As per MORTH clause 1500 A (Case-ii) (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but excluding GST )
165.5
-
-
... More
Reinforced Cement Concrete (M-20) in Open Foundation complete as per Drawing and Technical Specifications. As per MORTH clause 1500 C (Case-ii) (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but excluding GST )
273
-
-
... More
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawing and technical specifications. As per MORTH clause 1600 (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but excluding GST )
17
-
-
... More
Construction of sub-grade and earthern shoulders with approved materials obtained from ROW with all lifts & leads, transporting to site, spreading, gradding to required slope and compacted to meet requirement of table No 300-2. As per MORTH clause 305 (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but excluding GST )
11500
-
-
... More
Providing and laying 600 mm dia NP-3 H.P. jointing with coller in proper position including cost of cemment, jute etc required for proper completion of work. But excluding cost of coller. As per S.I. 26 (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST )
70
-
-
... More
Providing and laying 900 mm dia NP-3 H.P. jointing with coller in proper position including cost of cemment, jute etc required for proper completion of work. But excluding cost of coller. As per S.I. 26 (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST )
50
-
-
... More
M-150 brick in 1:4 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and tools & plants, etc required for proper completion of the work. as per MORTH Specification. As per S.I. 305b (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST )
108
-
-
... More
Struck pointing with cement mortar consisting of 1 part cement and 2 parts of fine sand of 1.25 fineness modulous including supply of all materials, labour and T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge. As per S.I. 574 (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST )
173
-
-
... More
Providing Lifting Handling and Placing 900 MM NP-3 Hume Pipe in alignment, fixing, callers and filling joint with 1:2 Cement Mortar As per S.I. 26 (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST )
10
-
-
... More
Construction of embankment with approved material obtained from ROW with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. As per MORTH clause 305 (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST )
2200
-
-
... More
Brick soling with straight over burnt bricks laid flat and dry including preparation of sub grade to prescribed camber and including supply of bricks, filling joints, with local earth spreading a blinding coat of one cm. (3/8”) depth of local earth of P.I.5 to 7 or sand over the entire surface & including all materials, labour , T&P etc. required for proper completion of the work. As per S.I. 762b (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST )
550
-
-
... More
Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed by Engineer-in-charge within a distance of 60 meter (200 feet). As per S.I. 692 (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST )
76
-
-
... More
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. as per MORTH clause 2100 (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST )
63
-
-
... More
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications. as per MORTH clause 1300 (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST )
87
-
-
... More
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. (RCC M-30) as per MORTH clause 1500, 1700, 2100 (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST )
53
-
-
... More
Supplying, fitting and placing HYSD bar reinforcement in foundation comlete as per drawing and technical specifications (Foundations) as per MORTH clause 1600 (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST )
5
-
-
... More
Furnishing and Placing Reinforced/ Prestressed cement concrete in sub-structure as per drawing and Technical Specification. ( Hight upto 5m) as per MORTH clause 1500, 1700, 2200 (13.05) (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST )
71.5
-
-
... More
Supplying, fitting and placing HYSD bar reinforcement in sub-structure comlete as per drawing and technical specifications. as per MORTH clause 1600, 2200 (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST )
13.5
-
-
... More
Furnishing and Placing Reinforced/ Prestressed cement concrete in sub-structure as per drawing and Technical Specification. as per MORTH clause 1300 (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST )
72.9
-
-
... More
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification. as per MORTH clause 2706, 2200 (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST )
142
-
-
... More
Proviaing and laying filter media with granular meterials / stone crushed aggregates satisfying the requirements laid down in clause 2504.0.0. of MORTH specifications to a thickness of not less than 600 mm with smaller size towards the wall and provided over the entire surface behind abutment , wing wall and return wall to the full height compacted to a firm condition complate as per drawing and Technical Specification. as per MORTH clause 710.1.4 of IRC:78 and 2504.2 (13.10) (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST )
22.9
-
-
... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification (ii) Granular material- as per MORTH clause section 1600 & 2200 (13.06) (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST )
36
-
-
... More
Providing and laying Cement concrete wearing coat M-35 grade including reinforecement complete as per drawing and Technical Specifications. as per MORTH clause 2702 (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST )
6.47
-
-
... More
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. (M-15) as per MORTH 1500, 1700 & 2100 (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST )
14.95
-
-
... More
Pointing with cement mortar (1:3 ) on brick work in substructure as per S.I. 13.2 (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST ) ( for box culvert)
71
-
-
... More
Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces S.I. 8.8 (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST )
385
-
-
... More
PART B
Maintainance cost :- Maintainance cost will be paid year wise as per Government order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD,Lucknow order No. 3689COPRMC/Mul-23-24 Date 17.02.2024
12.14
-
-
... More
1st year- maintainance cost 0% on Bituminous, CC & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
12.14
-
-
... More
2nd year- maintainance cost 0.25% on Bituminous, CC & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
12.14
-
-
... More
3rd year- maintainance cost 0.50 % on Bituminous, CC & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
12.14
-
-
... More
4th year- maintainance cost 0.75% on Bituminous, CC & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
12.14
-
-
... More
5th year- maintainance cost 1.00 % on Bituminous, CC & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
12.14
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%