Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date6 Nov 2024
Closing Date13 Nov 2024
Tender Amount₹ 17,60,000
Costs
EMD
₹ 1,76,000Document Cost
₹ 1,120Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEKNP_971129_2Tender No
1939/4A dated 23.10.2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Providing and laying Seal Coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using 'Type-C' as per Technical Specification Clause 510 (MORD 5.12) (B) By Mechanical Means Case-III : Type C
2760
58
160080
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (MORD 3.14).
410
75
30750
Providing, laying, spreading and compacting stone aggregates of specific sizes (22.4-53 mm guage) to water bound macadam (WBM-3) specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per MORD Technical Specification Clause 405. (MORD 4.7) (3) (a) by Manual Means for C.C. Road
27
4100
110700
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,
81
8150
660150
Maintenance Charges for Bituminous Surface including @ Earth work, Repair of Painted Surface, Earthwork in Patri, etc. as Per GO-17/2024/sa-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 & Letter CE (HQ-1) PWD Lucknow 3689C-OPRMC/mool 23-24 Dated 17.02.2024 subjected to approval from Govt. Maintenance of 1st Year after completion of work (for above Item No. 1 to 5) @ Zero % of cost of construction of work / BOQ.
1
-
-
Item No.6 but Maintenance of 2nd Year after completion of work @ 1.50% of total Work amount of item 1 to 5 (for Bituminous Road).
1
11647
11647
Item No.6 but Maintenance of 3rd Year after completion of work @ 3.00% of total Work amount of item 1 to 5 (for Bituminous Road).
1
23295
23295
Item No.6 but Maintenance of 4th Year after completion of work @ 4.50% of total Work amount of item 1 to 5 (for Bituminous Road).
1
34943
34943
Item No.6 but Maintenance of 5th Year after completion of work @ 6.00% of total Work amount of item 1 to 5 (for Bituminous Road).
1
46591
46591
Maintenance Charges for C.C. Road including @ Earth work, Repair of Painted Surface, Earthwork in Patri, etc. as Per GO-17/2024/sa-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 & Letter CE (HQ-1) PWD Lucknow 3689C-OPRMC/mool 23-24 Dated 17.02.2024 subjected to approval from Govt. Maintenance of 1st Year after completion of work (for above Item No. 6 to 7) @ Zero % of cost of construction of work / BOQ.
1
-
-
Item No.6 but Maintenance of 2nd Year after completion of work @ 0.25% of total Work amount of item 6 to 7 (for C.C. Road).
1
1927
1927
Item No.6 but Maintenance of 3rd Year after completion of work @ 0.50% of total Work amount of item 6 to 7 (for C.C. Road).
1
3854
3854
Item No.6 but Maintenance of 4th Year after completion of work @ 0.75% of total Work amount of item 6 to 7 (for C.C. Road).
1
5781
5781
Item No.6 but Maintenance of 5th Year after completion of work @ 1.00% of total Work amount of item 6 to 7 (for C.C. Road).
1
7708
7708
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements