Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date11 Dec 2024
Closing Date21 Dec 2024
Tender Amount₹ 65,30,000
Costs
EMD
₹ 5,27,000Document Cost
₹ 2,720Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEJNS_977321_2Tender No
2049/30C-Hamirpur Circle/2024 Date 08.11.2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing and laying seal coat by manual means with VG-10 grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type-C As per Technical Specification Clause 510
16125
56
903000
... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,
168
6080
1021440
... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 etc complete as per Technical Specification.
1470
75
110250
... More
Maintenance Charge including @ Earth work ,repair of painted surface, earthwork on patri , etc.as direction of E.I for the period of five years from the actual completion of work
Maintenance cost for 1st year (@ 0 % of PC Portion work amount )
1
-
-
... More
Maintenance Charge including @ Earth work ,repair of painted surface, earthwork on patri , etc.as direction of E.I for the period of five years from the actual completion of work
Maintenance cost for 2nd year (@ 1.5 % of PC Portion work amount )
1
62668
62668.2
... More
Maintenance Charge including @ Earth work ,repair of painted surface, earthwork on patri , etc.as direction of E.I for the period of five years from the actual completion of work
Maintenance cost for 3rd year (@ 3.0 % of PC Portion work amount )
1
125336
125336.4
... More
Maintenance Charge including @ Earth work ,repair of painted surface, earthwork on patri , etc.as direction of E.I for the period of five years from the actual completion of work
Maintenance cost for 4th year (@ 4.5 % of PC Portion work amount )
1
188004
188004.6
... More
Maintenance Charge including @ Earth work ,repair of painted surface, earthwork on patri , etc.as direction of E.I for the period of five years from the actual completion of work
Maintenance cost for 5th year (@ 6.0 % of PC Portion work amount )
1
250672
250672.8
... More
Maintenance Charge including @ Earth work ,repair of CC surface, earthwork on patri , etc.as direction of E.I for the period of five years from the actual completion of work
Maintenance cost for 1st year (@ 0.0 % of CC Portion work amount )
1
-
-
... More
Maintenance Charge including @ Earth work ,repair of CC surface, earthwork on patri , etc.as direction of E.I for the period of five years from the actual completion of work
Maintenance cost for Zero to 2nd year (@ 0.25 % of CC Portion work amount )
1
3220
3220.2
... More
Maintenance Charge including @ Earth work ,repair of CC surface, earthwork on patri , etc.as direction of E.I for the period of five years from the actual completion of work
Maintenance cost for Zero to 3rd year (@ 0.5 % of CC Portion work amount )
1
6440
6440.4
... More
Maintenance Charge including @ Earth work ,repair of CC surface, earthwork on patri , etc.as direction of E.I for the period of five years from the actual completion of work
Maintenance cost for 4th year (@ 0.75 % of CC Portion work amount )
1
9660
9660.6
... More
Maintenance Charge including @ Earth work ,repair of CC surface, earthwork on patri , etc.as direction of E.I for the period of five years from the actual completion of work
Maintenance cost for 5th year (@ 1.0 % of CC Portion work amount )
1
12880
12880.8
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements