Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date28 Dec 2024
Closing Date28 Jan 2025
Tender Amount₹ 54,00,000
Costs
EMD
₹ 4,70,000Document Cost
₹ 2,714Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEUFZ_987201_1Tender No
8539/1KAM(BARA)E-Tender Date 19-12-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming crushable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical specification clause 405
177
4700
831900
... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming crushable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per Technical specification clause 405
210
4900
1029000
... More
Brick edging on both side of road of 1st class brick 8 cm. (3") wide and 12 cm. (4.5) deep laid with mud mortar all labour finished to the required template and in proper alignment and also including dressing and ramming the excavated earth including all labour, T&P sudries required for proper completion of work material.(SOR 765)
0.63
82000
51660
... More
Providing and applying primer coat with bitumen emulsion (SS2) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical specifications Clause 502
2362.5
35
82687.5
... More
Providing and applying tack coat with bitumen VG-10 at the rate of 0.35 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.
2362.5
14
33075
... More
Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or cut-back or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades to be followed by a seal coat of either Type c as per technical Specication clause 508
2362.5
185
437062.5
... More
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C, as per Technical Specification Clause 510
2362.5
65
153562.5
... More
Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork, spreading the concrete with shovels, rakes, compacted using needle and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying primer, sealant, as per design, admixtures as approved, curing of concrete slabs for 14-days, and water finishing to lines and grade as per drawing and Technical Specification Clause 1501
67.5
8500
573750
... More
Construction of Embankment with approved material obtained from borrow pits with all lifts & leads upto 2.00 km , transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
240
190
45600
... More
Providing and laying Cement concrete 1:4:8 ( 1 cement : 4 fine sand : 8 brick aggregate 40 mm. nominal size) including supply of all materials. labour and T&P etc. required for proper completion of the work and curing complete, also including cost of formwork in foundation and floors. SOR No. 274
26
4100
106600
... More
Providing and laying Cement concrete 1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone ballast ballast 20mm nominal size) including supply of all materials. labour and T&P etc. required for proper completion of the work and curing complete, also including cost of formwork in founation adn floors. SOR No. 284A
27
8600
232200
... More
Mild steel or iron in plan work shch as reinforced concrete or reinforced brick work(when not included in overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorized overlapping shall be measured up to floor two level. SOR No. 504
21
7500
157500
... More
First class brick work in 1 : 4 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion of the work. SI No. 305b
11.8
5390
63602
... More
Struk Pointing with cement mortar (1:2) on brickwork in sub structure & super structure as per drawing and technical specification clauses 613.3 , 1204 and 1208.4 SI 574
42.3
210
8883
... More
Providing and laying reinforced cement conrete pipe (600mm HP) NP3 for culverts o first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry work in head walls and parapets Clause 1106.
15
3100
46500
... More
Providing and laying reinforced cement conrete pipe (350mm HP) NP3 for culverts o first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry work in head walls and parapets Clause 1106.
15
1700
25500
... More
12mm thick plaster with cement mortar in praportion of 1:2 cement and fine sand of 1.25 FM S.I.No. 580
1.96
190
372.4
... More
Providing & fixing Km stone, Hectometer stone & sign Board etc. complete
1
10000
10000
... More
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 1St Year Maintenance Cost @ Charge - 0.00% (Total Cost of Item nos. 1 to 21)
1
-
-
... More
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 2nd Year Maintenance Cost @ PC 0.75%+CC 0.25% (Total Cost of Item nos. (1 to10+12 to 21+ for PC)+(5+11 For CC Road)
1
35344
35344.18
... More
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 3rd Year Maintenance Cost @ PC 1.50%+CC 0.50% (Total Cost of Item nos. (1 to10+12 to 21+ for PC)+(5+11 For CC Road)
1
70688
70688.36
... More
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 4th Year Maintenance Cost @ PC 2.25%+CC 0.75% (Total Cost of Item nos. (1 to10+12 to 21+ for PC)+(5+11 For CC Road)
1
106032
106032.53
... More
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 5th Year Maintenance Cost @ PC 3.00%+CC 1.00% (Total Cost of Item nos. (1 to10+12 to 21+ for PC)+(5+11 For CC Road)
1
141376
141376.71
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%