Public Works Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date20 Sep 2024
Closing Date21 Oct 2024
Tender Amount₹ 82,85,000 
Notes
Download

Costs

Summary

Construction Of Pasinpurwa (parsawal) Link Road.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with Three wheel Static roller 8-10 tonnes in stages to proper grade and camber, applying and brooming crushable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical specification clause 405

281.25

1490625

5300

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with Three wheel Static roller 8-10 tonnes in stages to proper grade and camber, applying and brooming crushable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per Technical specification clause 405

281.25

1518750

5400

... More
Brick edging on both side of road of 1st class brick 8 cm. (3") wide and 12 cm. (4.5) deep laid with mud mortar all labour finished to the required template and in proper alignment and also including dressing and ramming the excavated earth including all labour, T&P sudries required for proper completion of work material.(SOR 765)

1

82000

82000

... More
Providing and applying primer coat with bitumen emulsion (SS2) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical specifications Clause 502

3750

120000

32

... More
Providing and applying tack coat with bitumen VG-10 at the rate of 0.35 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.

3750

52500

14

... More
Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or cut-back or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades to be followed by a seal coat of either Type c as per technical Specication clause 508

3750

705000

188

... More
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C, as per Technical Specification Clause 510

3750

243750

65

... More
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.

4.32

29592

6850

... More
Sand filling in plinth excluding supply of necessary quantity of sand from a distance not exceeding 8 km. From the site of work and including watering, ramming , dressing etc. Rate to include cost of all materials, labour and T & P etc. required for proper completion of the work (Analysis attached)

6.69

6355

950

... More
First class brick work in 1 : 4 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion of the work. SI No. 305b

38.15

205628

5390

... More
Providing and laying reinforced cement conrete pipe (900mm HP) NP3 for culverts o first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry work in head walls and parapets Clause 1106.

22.5

139500

6200

... More
Providing and laying reinforced cement conrete pipe (350mm HP) NP3 for culverts o first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry work in head walls and parapets Clause 1106.

7.5

13875

1850

... More
Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications

82.94

6220

75

... More
Providing & fixing of sign Board etc. complete

1

10000

10000

... More
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 1St Year Maintenance Cost @ Charge - 0.00% (Total Cost of Item nos. 1 to 17)

1

-

-

... More
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 2nd Year Maintenance Cost @ 0.75% (Total Cost of Item nos. 1 to 17)

1

56306

56306.36

... More
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 3rd Year Maintenance Cost @ 1.50% (Total Cost of Item nos. 1 to 17)

1

112612

112612.72

... More
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 4th Year Maintenance Cost @ 2.25% (Total Cost of Item nos. 1 to 17)

1

168919

168919.09

... More
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 5th Year Maintenance Cost @ 3.00% (Total Cost of Item nos. 1 to 17)

1

225225

225225.45



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.