Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date9 Jan 2025
Closing Date16 Jan 2025
Tender Amount₹ 98,80,000
Costs
EMD
₹ 6,94,000Document Cost
₹ 2,354Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_CEALG_991687_4Bid Award Id
ViewTender No
5322/Cashier(pdh)-AC/24-25 Dt. 07-11-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing, laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type-B as per Technical Specification Clause 511.(Excluding Cost of GST)
35327
50
1766350
... More
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 Carted earth 2 km .(Excluding Cost of GST)
2700
77
207900
... More
Excavation in foundation in ordinary soil (Loam, Clay or Sand) Including lift upto 1.50 m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer In-charge upto a distance of 30m from the foundation trenches by Hydraulic excavator/manual means. For Building/ Drain work only. As Per SOR Ch.- 4 S.I. No 251 page 25 (Culvert) (Excluding Cost of GST)
20
150
3000
... More
Providing and laying cement concrete in 1:4:8 (1 Cement : 4 Coarse sand : 8 graded stone aggregate 40 mm nominal size) including supply of all material, labour and T&P etc. required for proper completion of the work. In Foundation and floors. As Per SOR Ch.- 5 S.I. No 275 page 27a (For Culvert) (Excluding Cost of GST)
3.5
5900
20650
... More
Providing and laying of 40 mm gauge B/B under Hume pipe culvert foundation in road work including all materials, labours, T&P etc. required for completion of the work. As Per SOR 20-18 (For Culvert) (Excluding Cost of GST)
12
1650
19800
... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation-100 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) As Per SOR Ch.- 6 SI. No 6 page 30 (For Drain ) (Excluding Cost of GST)
16
5500
88000
... More
Supply and Laying of of 350 mm dia NP-3 Hume Pipe including 15% Transportation Charges includin all materials, Labour, T&P etc. complete as per requirements of Site. As Per Direction of E/I. foundation below HP Level (For 350mm) (For Culvert ) (Excluding Cost of GST)
15
1835
27525
... More
Supply and Laying of of 600 mm dia NP-3 Hume Pipe including 15% Transportation Charges includin all materials, Labour, T&P etc. complete as per requirements of Site. As Per Direction of E/I.
foundation below HP Level (For 600mm) (For Culvert ) (Excluding Cost of GST)
15
2987
44805
... More
Ruled Pointing on brick work with cement mortar of mix 1:3 (1Cement 3 Fine Sand) SOR SI No. 574A (For Culvert ) (Excluding Cost of GST)
36
135
4860
... More
12 mm cement plaster on brick work with cement mortar of mix (upto 10 mtr height from Ground level) 1:4 (1 cement: 4 Coarse sand) As Per SOR 13.4.1 (For Culvert ) (Excluding Cost of GST)
3
200
600
... More
White washing with lime on undecorated wall surfaces (Two coats) to give an even shade including thoroughly brooming the surface to remove all dirt, dust mortar drops and loose scales of lime wash and other foreign matters. As Per SOR 672(For Culvert) (Excluding Cost of GST)
36
13
468
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements