Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date6 Nov 2024
Closing Soon20 Nov 2024
Tender Amount₹ 43,25,000
Costs
EMD
₹ 4,16,000Document Cost
₹ 2,714Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEGKP_971047_2Tender No
7255/135C-Gkp Circle/2024 Dated 26-10-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Seal Coat Type C :- Providing and laying seal coat sealing the voids in a bituminous VG-10, surface laid to the specified levels, grade and cross fall using Type C as per Mord S.N.-5.12 Technical Specification Clause 510 (Including cost of Bitumen & labour cess) (GST will be paid extra as applicable)
3660
76
278160
Earth work cutting or in embankment to oridinary soil, excavation to be in the from of regular pits not exceeding 0.5m in depth and earthwork in embankment to be in 20cm. layers, including ramming and dressing the surface to required levels & slopes & also including 1.5m. lift & 30m. lead The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30m. distance as directed by the engineer-in-charge (Excluding Royalty) as per SI. No. 253 (GST will be paid extra as applicable) (Including labour cess)
500
100
50000
Cement Concrete Pavement Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade OPC cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501, Sl No. 6.4) (GST will be paid extra as applicable) (Including labour cess)
126
9850
1241100
Earth work Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.5 m. & lead upto 30 m. Including filling, watering & ramming of excavated earth into the trenches or into the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the engineer in charge upto a distance of 30m from the foundation
trenches. (Excluding Royalty) As per S.I. No. 251 (GST will be paid extra as applicable) (Including labour cess)
5
120
600
Concrete with 4cm(1/4"). Gauge brick ballast, fine sand of 1.25 fineness modulous and cement in proportion of 8:4:1 in foundation and under floor, including supply of all materials, labour and T&P etc. required for proper completion of the work. As Per S.I. No. 275 (GST will be paid extra as applicable) (Including labour cess)
3.9
3635
14176.5
M-150 Class brick work in 1:4 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. As Per S.I. No. 305 (GST will be paid extra as applicable) (Including labour cess)
4.5
4555
20497.5
M-150 Class brick work in 1:4 cement and coarse sand mortar in Super Structure including supply of all materials, labour and T&P etc. required for proper completion of the work. As Per S.I. No. 305A & 309 (GST will be paid extra as applicable) (Including labour cess)
1.45
4810
6974.5
Supply and laying of 600mm dia RCC Hume pipe NP-3. required for proper completion of the work. As per S.O.R. Page No. 39 (GST will be paid extra as applicable) (Including labour cess)
7.5
2132
15990
Supply and laying of 600mm dia RCC NP-3 Collar. required for proper completion of the work. As per S.O.R. Page No. 39 (GST will be paid extra as applicable) (Including labour cess)
2
550
1100
Struck pointing with cement mortar consisting of one part cement and 2 parts of fine sand of 1.25 F.M. on brick work including supply of all materials labour and T&P etc. required for proper completion of work. As per S.I. No. 574 (GST will be paid extra as applicable) (Including labour cess)
10
175
1750
For 5 Years maintenance work
1st Year cost of BOQ @ 0% 2nd Year cost of BOQ @ 1.50% In Itme no. 1 to 5 (for PC work) and @ 0.25% in Item No. 1 & 6 to 13 (for CC and Curvert work)
1
30099
30099.47
3nd Year cost of BOQ @ 3% In Itme no. 1 to 5 (for PC work) and @ 0.50% in Item No. 1 & 6 to 13 (for CC and Curvert work)
1
60198
60198.94
4nd Year cost of BOQ @ 4.50% In Itme no. 1 to 5 (for PC work) and @ 0.75% in Item No. 1 & 6 to 13 (for CC and Curvert work)
1
90298
90298.41
5nd Year cost of BOQ @ 6% In Itme no. 1 to 5 (for PC work) and @ 1% in Item No. 1 & 6 to 13 (for CC and Curvert work)
1
120397
120397.89
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%