If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date24 Dec 2024
Closing Date7 Jan 2025
Tender Amount₹ 1,47,10,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Tack Coat (i) Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.35 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.Clause 503. MORD

10500

16

168000

... More
20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type C as per Technical Specification Clause 508. Case - II By Mechanical Means(HMP 30/40) (I) Bitumen VG-10

10500

158

1659000

... More
Seal Coat Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 Case - III : Type C By Mechanical Means(HMP 30/40) (I) Bitumen VG-10

10500

50

525000

... More
Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1..

2800

75

210000

... More
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3

85

20

1700

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10 (i) Nominal mix 1:3:6

14

5730

80220

... More
Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 II. Brick masonry in 1:4 cement mortar

40

6680

267200

... More
Pointing with Cement Mortar (1:3) on brickwork as per technical specification Clause MORD 613.3

115

90

10350

... More
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204

11

190

2090

... More
Providing and laying reinforced cement concrete pipe NP3 on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1100.(350 mm Dia Hume Pipe Gule)

45

1520

68400

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1100.(500 mm Dia Hume Pipe )

22.5

1830

41175

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1100.(750 mm Dia Hume Pipe )

15

3500

52500

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1100.(1000 mm Dia Hume Pipe)

7.5

5700

42750

... More
Lettering and painting of culvert and parapet etc. complete.

6

1000

6000

... More
Providing and fixing of kilometre,hectometre and sign board etc all comp.work

2.8

15000

42000

... More
Maintenance of bituminous surface road and / or gravel road and / or WBM road including filling of pot holes and patch repair etc., restoration of rain cuts and dressing of side slopes / berms, making up of berms / shoulders,maintenance of drains, maintenance of guard rail and parapets, maintenance of road signs, speed breakers, standing tree adjacent to road wherever required, maintenance of 200m (hectometre stone) and kilometre stones,cutting of branches of trees, shrubs and trimming of grass and weeds etc.,white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per erformance Index Annexure-1) mentioned in GO No. 17/2024/sa-113/23-1- 2024-23-1099/113/2023 dated 16.01.2024 & Enc Letter no. 3689/COPRMC/MUL-2023-24 dated 17.02.2024) Maintinance cost of 1st year cost of Work @0.0% at Item No. 1to 18

1

-

-

... More
Maintenance of bituminous surface road and / or gravel road and / or WBM road including filling of pot holes and patch repair etc., restoration of rain cuts and dressing of side slopes / berms, making up of berms / shoulders,maintenance of drains, maintenance of guard rail and parapets, maintenance of road signs, speed breakers, standing tree adjacent to road wherever required, maintenance of 200m (hectometre stone) and kilometre stones,cutting of branches of trees, shrubs and trimming of grass and weeds etc.,white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per erformance Index Annexure-1) mentioned in GO No. 17/2024/sa-113/23-1- 2024-23-1099/113/2023 dated 16.01.2024 & Enc Letter no. 3689/COPRMC/MUL-2023-24 dated 17.02.2024) Maintinance cost of 2nd year cost of Work @1.00% at Item No. 1to 18

1

134518

134518.85

... More
Maintenance of bituminous surface road and / or gravel road and / or WBM road including filling of pot holes and patch repair etc., restoration of rain cuts and dressing of side slopes / berms, making up of berms / shoulders,maintenance of drains, maintenance of guard rail and parapets, maintenance of road signs, speed breakers, standing tree adjacent to road wherever required, maintenance of 200m (hectometre stone) and kilometre stones,cutting of branches of trees, shrubs and trimming of grass and weeds etc.,white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per performance Index Annexure-1) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated 16.01.2024 & Enc Letter no. 3689/COPRMC/MUL-2023-24 dated 17.02.2024) Maintinance cost of 3rd year cost of Work @1.50% at Item No. 1to 18

1

201778

201778.28

... More
Maintenance of bituminous surface road and / or gravel road and / or WBM road including filling of pot holes and patch repair etc., restoration of rain cuts and dressing of side slopes / berms, making up of berms / shoulders,maintenance of drains, maintenance of guard rail and parapets, maintenance of road signs, speed breakers, standing tree adjacent to road wherever required, maintenance of 200m (hectometre stone) and kilometre stones,cutting of branches of trees, shrubs and trimming of grass and weeds etc.,white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per performance Index Annexure-1) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated 16.01.2024 & Enc Letter no. 3689/COPRMC/MUL-2023-24 dated 17.02.2024)Maintinance cost of 4th year cost of Work @2.00% at Item No. 1to 18

1

269037

269037.7

... More
Maintenance of bituminous surface road and / or gravel road and / or WBM road including filling of pot holes and patch repair etc., restoration of rain cuts and dressing of side slopes / berms, making up of berms / shoulders, maintenance of drains, maintenance of guard rail and parapets, maintenance of road signs, speed breakers, standing tree adjacent to road wherever required, maintenance of 200m (hectometre stone) and kilometre stones,cutting of branches of trees, shrubs and trimming of grass and weeds etc.,white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per performance Index Annexure-1) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated 16.01.2024 & Enc Letter no. 3689/COPRMC/MUL-2023-24 dated 17.02.2024)Maintinance cost of 5th year cost of Work @3.00% at Item No. 1to 18

1

403556

403556.55



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.