Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date9 Feb 2024
Closing DateCancelled
Tender Amount₹ 1,46,000
Costs
EMD
₹ 15,000Document Cost
₹ 944Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEGKP_890585_6Bid Award Id
ViewTender No
340/7A DATE 02-02-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Same As in Item No-3 above but for Column S.l.No 288
0.5
4350
8700
Class 150 sub class 'A' brick work in 1:6 cement and coarse sand mortor in foundation & up to plinth including supply of all materials and tools and plants etc. required for proper completion of the work . As per (S.l.No303)
4.3
19780
4600
Same as in item No 3 above but for Plinth band as per S.l.No 282
0.5
3750
7500
Same as in item No 3 above but for Lintel Band for Tie As per S.l.No 283
0.25
1900
7600
Same as in item No 5 above but in super structure for one brick thick wall As per S.l.No 303+309+310
2.4
12240
5100
12 mm thick plaster with cement mortar in proportion of 1:6 cement and fine sand on brick work minimum thickness not be less than 10 mm including supply of all material, labour and T&P etc. Required for proper completion of work. As per S.l.No 586+596
70
8400
120
Finishing walls with water proofing on cement paint of approved make and on new work with 3 coats to give an even shade including supply of all material and labour cost of all materials As per S.l.No 660 + 661
70
4550
65
Mild steel of iron work in plain work such as in reinforced concreate or reinforced brick work (When not included in overall rate) wrought to required shapes as necessary and bending for the proper completion of work including supply of steel and its wastages and all labour and T&P required for proper completion of work note the steel shall bent cold and all bends hooks and authorised over lapping shall be measured as per S.l. No 504
3.5
19950
5700
Earth work in cutting or in embankment ordinary soil (loam, clay or sand) excavation to be in the from of pit not exceeding 50 cm. in depth and earthwork in embankment to be in 20 cm. layers including the raming and dressing the surface to required leves slopes and also 1.50 meter lift and 30 mt. lead. The earth from cutting to be used in making embankment or to be deposited as spoil bank withen 30 mt. distance as directed by the Engineer Incharged per S.l.No 253 Same as ithem no above but in the earth carted from 1.00 km distance on katchha road.
15
2250
150
Gate
640
36480
57
Supply and fixing of sign board including supply and cost of all materils labours T & P etc. required templet as directed by the Engineer In charge.
1
5000
5000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements