Public Works Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Eprocure
Opening Date25 Nov 2024
Closing Soon2 Dec 2024
Tender Amount₹ 30,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing, laying and rolling of Open-graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line grade and level to serve as wearing course on a previously prepared base. including mixing in a suitable plant , laying and rolling with a smooth wheeled roller 8-10 tonne capacity, and finishing to required level and grade to be followed by seal coat of either TYpe A or Type B or Type C as per Technical Specification Clause 508 (Including all material, T&P, labour cess etc. but excluding G.S.T.)

4875

182

887250

... More
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C, as per Technical Specification Clause 510 (Including all material, T&P, labour cess etc. but excluding G.S.T.)

4875

65

316875

... More
Construction of subgrade and earthen shoulders construction of subgrade and earthen shoulders with approved material obtained from R.O.W. with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 as per Technical Specification Clause 303.1

390

61

23790

... More
Maintainance cost :- Maintainance cost will be paid year wise as per Government order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD,Lucknow order No. 3689COPRMC/Mul-23-24 Date 17.02.2024

1

-

-

... More
1st year- maintainance cost 0% on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

1.3

-

-

... More
2nd year- maintainance cost 1.5% on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

1.3

18179

23633.79

... More
3rd year- maintainance cost 3.00 % on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

1.3

36359

47267.58

... More
4th year- maintainance cost 4.50% on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

1.3

54539

70901.37

... More
5th year- maintainance cost 6.00 % on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

1.3

72719

94535.16

... More
For CC Road in Abadi Portion WBM Grading 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.

37.5

3400

127500

... More
Construction of un-reinforced, dowel jointed plain cement concrete pavement (M-30) over a prepared sub- base with approve grade cement @ 400 kg per cum, course and fine aggregate conforming to IS 383, maximum size of course aggregate not exceeding 25mm, mixed 25 mm, mixed in a batching mixing plant as per approved mixed design, transported to site laid with a fixed form or slip form paver, spread, compacted and finished in a continuos operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, Joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing.

112.5

8100

911250

... More
PART B Maintainance cost :- Maintainance cost will be paid year wise as per Government order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD,Lucknow order No. 3689COPRMC/Mul-23-24 Date 17.02.2024

1

-

-

... More
1st year- maintainance cost 0% on CC Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

0.2

-

-

... More
2nd year- maintainance cost 0.25% on CC Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

0.2

12984

2596.88

... More
3rd year- maintainance cost 0.50 % on CC Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

0.2

25968

5193.75

... More
4th year- maintainance cost 0.75% on CC Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

0.2

38953

7790.63

... More
5th year- maintainance cost 1.00 % on CC Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)

0.2

51937

10387.5



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.