If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department Tender
Civil And Construction
Road Construction
Building Construction
Eprocure
Opening Date8 Oct 2024
Closing DateCancelled
Tender Amount₹ 88,77,000
Costs
EMD
₹ 6,44,000Document Cost
₹ 2,720Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEMRZ_963696_13Tender No
4555/53M MZP Circle/24 Date-23.09.2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Providing ,laying,spreading and compacting stone aggregates of 53-22.4 mm size to water bound macadam specification including spreading in uniform thickness ,hand packing, rolling with smooth wheel roller 80-100KN in stages to proper grade and camber ,applying and brooming, stone screening , binding material to fill up the interstices of course aggregate, watering and compacting to the required density grading 3 as per PWD specification.
275.63
1015696
3685
Providing and applying primer coat with bitumen emulsion (SS-2) on prepared surface of granular base spraying primer @0.70kg / sqm using mechanical means as per Technical Specification Clause 502.
3675
141487
38.5
Providing and applying tack coat with bitumen VG-10 using pressure distributor at the rate of 0.30kg per sqm on the prepared granular surfaces treated with primer & cleaned with mechanical broom as per Technical Specification Clause 503.
3675
58800
16
Providing, laying and rolling of open - graded premix carpet of 20 mm thickness composed of 13.2 mm (sieve passing 22.4 mm & retaining 11.2mm) & 11.2 mm grit (sieve passing 13.2 mm & retaining 5.60mm) aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type C as per Technical Specification Clause 508.
3675
580650
158
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C seal coat.
3675
213150
58
Earth work in patari in ordinary soil etc including dressing every additional 1.50m lift or part of 1.50m as per S.I. No. 253.
1158
92640
80
Earth work in excavation for structures as per drawing and technical specification Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
388
42680
110
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanical mixed ,placed in foundation and completed by vibration inluding curing for 14 days.
57
346560
6080
Plain cement concrete 1:2:4 nominal mix in foundation with crushed stone aggregate 20 mm nominal size mechanical mixed ,placed in foundation and completed by vibration inluding curing.
10.58
72684
6870
Reinforcement cement concrete (M-25) in Super structure complete as per drawing and technical specification as per MORD Data Book.
11.8
68322
5790
Mild Steel or iron in plain work such as in reinforced concrete including bending for proper completion of the work and including supply of steel its wastage etc.
10.8
74304
6880
S/O 600 mm 7.50 R/M including supply of all material ,labour, T&P etc complete as per direction of Eng-in-charge.
15
28080
1872
P/L ,Fixing, Jointing 900 mm H.P with Coller SI No. 30 (NS 5)(III)
4
1800
450
Stone masonary work in cement mortar 1:4 in foundation compacted as per drawings and technical specifications .
240
1279200
5330
Stone masonary work in cement mortar 1:4 in Sub structure compacted as per drawings and technical specifications .
173
970530
5610
Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification clause 613.3 and 1204.
278
54210
195
Providing weep hole in abutement ,wingwll, return wall with 100mm dia AC pipe as per drawing and technical specification Clauses 614,709,1204.3.7
68
6800
100
Filter Media behind retaining wall as per specifications 1204.3.8 in a width of 600mm.
104
317200
3050
Running of 5HP pump for dewatering including arrangement of pump suction and delivery pipes & other sccessories at site including cost of POL NS page -57
120
13200
110
The routine maintenance of above road work including embankment, patari, pavement, road side and cross drain,hume pipe culvert etc to the required standards and in the manner as defined in CB conditions and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 1st year maintenance cost (0%)
0.98
-
-
The routine maintenance of above road work including embankment, patari, pavement, road side and cross drain,hume pipe culvert etc to the required standards and in the manner as defined in CB conditions and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost (1.00%)
0.98
82369
84051
The routine maintenance of above road work including embankment, patari, pavement, road side and cross drain,hume pipe culvert etc to the required standards and in the manner as defined in CB conditions and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost (1.50%)
0.98
123555
126077
The routine maintenance of above road work including embankment, patari, pavement, road side and cross drain,hume pipe culvert etc to the required standards and in the manner as defined in CB conditions and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 4th year maintenance cost (2.00%)
0.98
164739
168102
The routine maintenance of above road work including embankment, patari, pavement, road side and cross drain,hume pipe culvert etc to the required standards and in the manner as defined in CB conditions and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years (including cost of material T&P labour but excluding GST) for 5th year maintenance cost (3.00%)
0.98
247109
252153
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements