If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date28 Feb 2025
Closing Soon7 Mar 2025
Tender Amount₹ 11,02,39,000
Costs
EMD
₹ 22,10,000Document Cost
₹ 7,950Tender Fee
Refer Documents
Summary
Widening And Strengthening Of Mau-garoutha Link Road In Km 1 To 11 (mdr).
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_CEJNS_1011906_2Tender No
9095/44 C-jhs-cir/24, Date 11.12.2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of embankment with approved material obtained from roadway with all lifts ane leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2 complete as per M.O.R.T.&H. specification clause 305. complete in all respects.
6758.42
-
-
... More
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401.
13937.24
-
-
... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
2438.85
-
-
... More
Providing, laying, Spreading & compacting graded stone aggregate (WMM) with 1% OPC cement, (ACC, Birla Uttam, J.K. Super Brand and 3.5% Emulsion specification including premixing the material with water at OMC in mechnical mix plant carriage of mixed material by tipper to site laying in uniform layer with paver in sub-base/coarse on well prepared surface and compacting withvibratory roller to achieve the desire density.
1382.02
-
-
... More
Providing and applying tack coat with bitumen VG-10 using pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
74729.5
-
-
... More
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 Percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (Two layer 70 mm & 65 mm thick)
812.95
-
-
... More
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause No. 507.
2280.16
-
-
... More
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
24754.55
-
-
... More
Excavation in Foundation in ordinary soil (Loam clay, or sand) including lift upto 1.5 metre (5 fts.) and lead upto 30 m (100 fts) & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30 m. (100 fts) from the foundation trenches (S.I. No.251).
1199.67
-
-
... More
Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 km.(5 miles) from the site of work and including watering, dressing etc. Rate to include cost of all materials, labour and T&P etc. required for proper completion of the work. (Rate is Including Royality) (S.I. No.255).
223.44
-
-
... More
Cement concrete with 4 cm (1.5") gauge approved stone ballast, approved coarse sand and cement in the proportion of 6 : 3 : 1 including supply of all materials, labour and T & P etc. required for proper completion of the work. (S.I. No.280).
178.27
-
-
... More
Random course rubble masonary in 1:4 cement and coarse sand mortar in foundation and plinth, including supply of material as order by the Engineer-in-charge, labour, T&P etc, required for proper completion of work (Ch.-8, Additional Item-2).
302.59
-
-
... More
Providing and Laying Reinforced cement concrete pipe NP3/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . (350 mm dia).
37.5
-
-
... More
Providing and Laying Reinforced cement concrete pipe NP3/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets. (1000 mm dia).
55
-
-
... More
Raised pointing with cement and Fine sand 1.25 F.M. mortar on brick work in proportion of 1 :2, including supply of all material, labour and T & P etc. required for proper completion of the work (S.I. No.577).
147.79
-
-
... More
Cement concrete with 2 cm gauge approved stone ballast, approved coarse sand and cement in the proportion of 4 : 2 : 1 including supply of all materials, labour and T & P etc. required for proper completion of the work. (S.I. No.279 (New Item-a)).
17.09
-
-
... More
Supply and fixing of 75mm dia PVC spouts including supply of material labour T&P etc required for proper completion of the work. S.I. No. New Item-4 (Ch-19)
78.6
-
-
... More
R.C.C work with cement approved coarse sand and 2 cm. (3/4") gauge approved stone ballast in the proportion of 1:1.5:3 in lintels of doors and windows excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour& T&P etc. required for proper completion of the work. Binding wire cost being included in the item. (S.I. No-283(i).
757.09
-
-
... More
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage & overlapping & hooks. (S.I. No. 504)
891.48
-
-
... More
Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification.
672.78
-
-
... More
Construction of embankment with approved material obtained from roadway with all lifts ane leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2 complete as per M.O.R.T.&H. specification clause 305. complete in all respects.
4573.8
-
-
... More
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401
173.25
-
-
... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
115.5
-
-
... More
Kilometer stone.
9
-
-
... More
5th Kilometer stone.
2
-
-
... More
Hectometer.
43
-
-
... More
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost (0%)
10.63
-
-
... More
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost (0.25% Construction Cost)
10.63
-
-
... More
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost (0.50% Construction Cost)
10.63
-
-
... More
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost (0.75% Construction Cost)
10.63
-
-
... More
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost (1% Construction Cost)
10.63
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%