Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date6 Jan 2024
Closing DateCancelled
Tender Amount₹ 80,08,000
Costs
EMD
₹ 6,00,000Document Cost
₹ 2,600Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEDPW_878251_2Tender No
4614/2Com(B)-Gonda Circle/23-24 Dt. 28.12.23Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C, as per Technical Specification Clause 510
4500
337500
75
... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete, thickness as per design, over a preapared subbase, with 43 grade cement or only other type as per clause 1501.2.2 M.25 (Grade), coarse and fine aggregate not exceeding 25 mm, mixed in a concrete mixture of not less than 0.2 cum capacity and appropriate weight bactcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including leveling the formwork as per drawing) spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtyres as approved, curing of concrete slabs for 14-days,
495
4653000
9400
... More
Earthwork in excavation for structures as per drawing and technical specification clause 305.1
79.8
9975
125
... More
P.C.C. 1:4:8, with brick ballast
22.05
162067
7350
... More
R.C.C. 1:2:4, with 20 mm grit over top of walls and drain bed
23.1
228690
9900
... More
First Class brick work in 1:3 cement and Coarse Sand mortar in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion of the work
21
122850
5850
... More
12mm. Thick plaster with cement mortar in proportion of 1:3 cement & Coarse Sand and T & P etc. required for proper completion of the work
385
73150
190
... More
Constuction of Culvert :Excavation in foundations in ordinary soil (Loam clay or sand) including lift upto 1.5m. (5fts.) and lead upto 30m. (100fts.) & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-incharges upto a distance of 30m. (100 fts.) from the foundation trenches. As per SI No. 251
61.27
7658
125
... More
Providing and laying Cement concrete 1:4:8 (1 cement : 4 fine sand : 8 graded brick aggregate 40 mm. nominal size) including supply of all materials, labour and T & P etc. required for proper completion of the work and curing complete, also including cost of formwork in foundation and floors. as per SI No. 281
1.26
5418
4300
... More
Providing and laying dry brick ballast (O.B.B.) under and half round of the pipe including cost of all materials T&P etc complete.
1.82
2493
1370
... More
First Class brick work in 1 : 4 cement and course sand in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion of the work. As per SI no 305(b)
11.05
61880
5600
... More
Stuck pointing in 1:2 cement and fine sand mortar on brick work including supply of all materials, labour and T and P etc Requuired for proper completion of work as per S.I No. 574.
15.61
2341
150
... More
Concrete with 20 mm gauge approved stone grits in the proportion of 1:2:4 including supply of all materials labours and T&P etc. Required for completion of the work as per S.No. 279(B).
0.11
929
8450
... More
12mm thick plaster with cement mortar with cement and coarse sand of mortar in 1:4 SI.No. 584
0.49
71
145
... More
Supply & laying of 1000 mm dia NP3 hume pipe including fixing of collar with 1:2 cement mortar.
22.5
126000
5600
... More
Colour washing one coat, using approved colouring materials of buff, blue, grey or brown shade, including supply of all materials, labour and T&P etc. required for proper completion of the work. (Two Coat)
15.61
874
56
... More
Lettering and painting of culvert no. Plate 30x30cm of standard size with two coats of approved synthetic enamel paint and lettering as per PWD maintenance manual including cost of all materials, labour T&P etc. complete.
4
108
27
... More
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
1.7
13600
8000
... More
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications.
18.73
131110
7000
... More
Pointing with cement mortar (1:3) on brick 4 work in substructure & Super Structure as per Technical Specifications
48.64
3710
76.29
Evaluation Notes How It Works ?