Public Works Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date20 Feb 2024
Closing DateCancelled
Tender Amount₹ 73,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing laying spreading and compacting stone aggregates of specific sizes to water bound macadam (G-3) specification including spreading in uniform thickness, hand packing rolling with 3-wheeled steel/vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density.

309

1257630

4070

... More
Brick edging with class-150 bricks laid on edge on both sides of road in mud mortar includin cost of all material , labour T&P etc required for proper completion of work As per SOR No. 765.

1.1

89999

81818

... More
Providing and applying primer coat with bitumen emulsion(SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per technical means 502. Including cost of Emulsion

4125

140250

34

... More
Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.35 kg per sqm on the prepared dry and hungry bituminous surface cleaned with hydraulic broom as per technical specicification Clause 503. Including cost of Bitumen

4125

57750

14

... More
Providing and laying rolling of open graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggreates using Bitumen VG-10 to required line, grade and level to serve as wearing course on a previously prepared base by manual means, including mixing in a suitale plant, laying and rolling with a 3 wheel 8 - 10 tonne static roller capacity, finished to required level and grades to be followed by seal coat as per technical clause 508. Including cost of Bitumen.

4125

771375

187

... More
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 including Cost of Bitumen VG-10 using @0.65 Kg/Sqm and Road Roller Charges all complete.Including cost of Bitumen.

4125

280500

68

... More
Earthwork in cutting or in embankment in ordinary soil excavation to be in the from of regular pits not exceeding 1/2 metre c 20'' in depth and earthwork in embankment to be in 20 cm(8) Layers including ramming and derssing the surface to required levels.

960

84480

88

... More
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the All kinds of soil. DAR No. 2.8.1

83.3

12911

155

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:5:10 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 40 mm (nominal size) DAR No. 4.1.10

5.06

29019

5735

... More
Brick work with common burnt clay (non modular) bricks of class-150 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) DAR No. 6.1.1

14.4

90244

6267

... More
Supply of 900 mm NP3 Hume Pipe and its coller including cartage etc. complete.

15

67650

4510

... More
Layaing of 900mm dia NP3 Hume Pipe in proper posistion and joining them with coller and filling of jute and cement mortar in 1:2 cement and sand complete.

15

13905

927

... More
Pointing on tile brick work with cement mortar 1:3 (1 cement : 3 fine sand): Flush/ Ruled/ Struck or weathered pointing DAR 13.32.1

39.96

5474

137

... More
Making coping at the top end of parapet of culvert in 1:2:4 Cement and C. sand and stone grit as cost of cement concrete indoor sills shoukhat, boundary parts etc. as per S.L.No. 279(1b)

0.1

762

7628

... More
Providing & Laying of Brick bats upto Half depth arround pipes as per Sl. No.-2 Material & S.L.- 255

0.72

1042

1448

... More
Supply of 350 mm NP3 Hume Pipe and its coller including cartage etc. complete.

15

17400

1160

... More
Layaing of 350mm dia NP3 Hume Pipe in proper posistion and joining them with coller and filling of jute and cement mortar in 1:2 cement and sand complete.

15

6375

425

... More
Second Year Maintenance Cost

1

42539

0.01

... More
Third Year Maintenance Cost

1

85078

0.02

... More
Fourth Year Maintenance Cost

1

127618

0.02

... More
Fifth Year Maintenance Cost

1

170157

0.03



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.