Public Works Department Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date14 Feb 2025
Closing SoonCancelled
Tender Amount₹ 56,38,000
Costs
EMD
₹ 4,82,000Document Cost
₹ 2,714Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_CEALD_1006265_1Tender No
370/93C-ETENDERING/PFC/2024 DT. 28.01.2025Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing, laying, spreading and compacting stone aggregates of 63-45 mm sizes to water bound macadam G-2 specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 80-100 KN in stages to proper grade and camber, applying and brooming requisite type-B of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density for Grading 2 as per MORD Specification No.405 Quarry from Shankargarh (Excluding GST)
253.13
3300
835312.5
... More
Providing, laying, spreading and compacting stone aggregates of 53-22.4 mm sizes to water bound macadam G-3 specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 80-100 KN in stages to proper grade and camber, applying and brooming requisite type-B of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density for Grading 3 as per MORD Specification.405 incluidng labour cess,Royalty. Quarry from Shankargarh (Excluding GST)
253.13
3400
860625
... More
Brick edging on both sides of the road of first brick class M-150. 8 cm wide and 12 cm deep laid with mud mortar including labour & supply of bricks finished to required template and in proper alignment and also including dressing & ramming the excavated earth as directed by the engineer-in charge of the work including material, labour and T & P etc for Proper completion of the work. (Excluding GST)
0.9
72000
64800
... More
Providing and applying Prime coat with bitumen emulsion-SS using emulsion pressure distributor @ 0.70 Kg/Sqm. on the prepared granular surface cleaned manually. As per MORD specification 502
3375
32
108000
... More
Providing and applying tack coat with bitumen using bitumen pressure distributor @ 0.35 Kg/Sqm. on the prepared bitumin surface cleaned with hydralic broom, As per MORD specification 503
3375
15
50625
... More
Providing, laying and rolling of open - graded premix surfacing of 20 mm compacted thickness with 13.2 mm crushed stone grit @ 0.18cum/10sqm and 11.2 mm size crushed stone grit @ 0.09cum/10sqm from approved quarry and bitumen @ 1.46Kg/sqm to required line, grade and level to serve as wearing course on a previously prepared base, also mixing in a suitable plant or by mixall, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades, including cost of material, labour, plant, machinery and T&P. Complete as per MORD Specification No.508(II) .including the cost of bitumenVG-10, Labour T&P etc.(Excluding GST)
3375
200
675000
... More
Providing and laying seal coat type-C sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using 6.5 mm crushed stone grit @ 0.09cum/ 10sqm from approved quarry and bitumen/emulsion @0.65kg/sqm including cost of material, labour, plant, machinery, mixall and T&P. Complete as per MORD Specification No.510(ia) including the cost of bitumen VG-10, Labour T&P etc.(Excluding GST)
3375
70
236250
... More
Construction of sub grade and earthen shoulders with approved materials obtained from borrow pits with all lifts and leads, transporting to stite, spreading, grading to required slope and compacted to meet requirement of table no. 300-2 with lead upt 1000m as per Technical specification cluase 303.1 .as per direction of E/I incluidng labour cess,Royalty (Excluding GST)
900
107
96300
... More
Earth in excavation in ordinery soil for foundation and tranchage lead up to 30M. And lift upto 1.5M. (Excluding GST)
98
60
5880
... More
Providing and Laying 40mm. Guage ballast with stone dust Complete. (Excluding GST)
14
1280
17920
... More
Cement concrete 1:3:6 with 40 mm guage brick ballast fine sand & cement. MORD Specification. 11.4 (I) (Excluding GST)
3
7300
21900
... More
Supply and Laying of 1000 MM HP NP3 into foundation, keeping in to proper alignment, fixing of collar with 1:2 Cement and coarse sand mortar and jute etc. rquired for protect jointing including-putting/shifting of pipes to foundation etc. and all labour T&P, Material, etc. required for proper completion of work. (Excluding GST)
7.5
7400
55500
... More
Supply and Laying of 600 MM HP NP3 into foundation, keeping in to proper alignment, fixing of collar with 1:2 Cement and coarse sand mortar and jute etc. rquired for protect jointing including-putting/shifting of pipes to foundation etc. and all labour T&P, Material, etc. required for proper completion of work. (Excluding GST)
22.5
3240
72900
... More
First Class 150 Brick work in 1:4 cement and fine sand of 1.25 FM modulous mortar in foundation and plinth including supply of all materials, labours and T&P etc. required for proper completion of the work. As per MORD specification 11.5 I (600, 1200) (Excluding GST)
33
6350
209550
... More
Struck pointing in 1:3 (cement & sand mortar) on brick work including supply of all materials, labour and T&P etc. Required for proper completion of the work but with cement mortar consisting of 1 part cement and 2 parts of fine sand of 1.25 F.M. As per MORD specification 12.2 (600) (Excluding GST)
67
80
5360
... More
12mm (1/2) thick plaster 1:4 (cement & sand mortar) over brick work minimum thickness not to be less than 10 mm thick including supply of all materials, labour and T&P etc. rquired for completion of the work. As per MORD specification 12.3 (600) (Excluding GST)
2.24
210
470.4
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%