Public Works Department Tender

... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.

Public Works Department Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date12 Feb 2025
Closing Date17 Feb 2025
Tender Amount₹ 48,79,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing, laying, spreading and compacting stone aggregates of 22.4-53mm Sukrut Stone ballast size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, Type-B screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.

151.88

3750

569550

... More
Providing and appying prime coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate 0.70 kg/Sqm using mechanical means as per Technical specification claue 502 .

2025

46

94162.5

... More
Providing and applying tack coat with bitumen VG-10 pressure distributor at the rate of 0.35 kg. per sqm on the prepared bituminous / granular surface cleaned with hydrulic broom as per Techinical Specification No. 503

2025

20

41512.5

... More
Providing laying and rolling of open graded premix carpet of 20mm thickness composed of 13.2mm nominal mix (22.4 mm-11.2mm)and 11.2mm nominal mix (13.2mm-5.6mm) dalla aggregate either using 80/100 penetration grade bitumen VG-10 @1.46kg per sqm. To required line,grade and level to serve as wearing course on a previously prepared base,including mixing by mixol,laying and rolling with a three wheel 80-100 KN static roller capacity.as per technical specification clause 508.(Including cost of bitumen).

2025

182

368550

... More
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C, as per Technical Specification Clause 510.

2025

68

138712.5

... More
Earthwork in excavation for structures as Per drawing and techanical specification clause 305.1 in soil mixed with moorum/shingle/black cotton kankar requaring the use of special T&P such as pickaxe,subbals etc with 30m lead and 1.5m lift and also including setting out, construction of shoring and bracing, removal of stumps and other deleterous material and disposal up to a lead of 50m dressing of sides and bottom and backfilling in trenches with excavated suitable material.

214

110

23540

... More
Plain Cement Concrete (PCC) M-10(1:3:6 Nominal Mix) in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed placed in foundation completed vibration including curring for 14 days.

23

6200

142600

... More
Stone masonary work in cement mortor(1:4) in foudation complete asper drawing and techanical specification .

145

5600

812000

... More
Stone masonary work in cement mortor(1:5) in sub-structure complete asper drawing and techanical specification clauses 702,704,1202 and 1203(2nd sort

96

5900

566400

... More
Raised cement pointing with cement mortar consisting of 1 part cement and 3 part of coarse sand as per drawing and Techanical specification clauses 613.3,1204

178

71

12638

... More
S/O 900 mm 7.5 R/M

7.5

4000

30000

... More
ProvidingC.C archtectural coping on the top of wing/return wall. etc. complete as per drawing and techanical spec.

120

185

22200

... More
The routine maintenance of above road work including embankment, patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 1at year maintenance cost (0%)

0.54

-

-

... More
The routine maintenance of above road work including embankment, patri, pavement, road sides and cross drains,hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.including cost of material T&P abour but excluding GST) for 2"* year maintenance cost (1% of Construction

0.54

83077

44861.58

... More
The routine maintenance of above road work including embankment, patri, pavement, road sides and cross drains, hume pipe culvert etc to the required standards and In the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. including cost of material T&P abour but excluding GST) for 3a year maintenance cost (1.5% of Construction Cost)

0.54

124615

67292.1

... More
The routine maintenance of above road work including embankment, patri, pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost (2% of Construction Cost)

0.54

166154

89723.16

... More
The routine maintenance of above road work including embankment, patri, pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.including cost of material T&P labour but excluding GST) for 5* year maintenance cost(3% of Construction Cost)

0.54

249231

134584.74



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.