If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date29 Feb 2024
Closing DateCancelled
Tender Amount₹ 1,18,68,000
Costs
EMD
₹ 8,38,000Document Cost
₹ 2,715Tender Fee
Refer Documents
Summary
Construction Of Chainpurwa To Tambaur Mahmudabad Road Via Fulwari Link Road
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEUCZ_907652_3Tender No
1159/352C/E-TENDER/STP-LMP/24 Dt 16-2-24Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Providing ,Laying ,spreading and compacting stone aggregates of 53-22.4 mm size to water bound macadam specification including spreading in uniform thickness , hand packing ,rolling with Smooth wheel roller 80-100 KN in stages to proper grade and camber ,applying and brooming ,Stone screening to fill up the nterstices of coarse aggregate ,watering and compacting to the required density. As per technical specification clause 405.
450
2340000
5200
Brick edging on both sides of road surface with class-150 sub class A bricks 8 cm wide and 12 cm deep. Laid dry on edge. Including cost of material, all labour T&P charges etc complete. As per S.I. No 765
1.7
163200
96000
Construction of Subgrade and Earthen Shoulders with approved material obtained from borrow pits availble land with all lifts and leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.1and 300.2 as per Technical Specitaion Clause 303.1
1800
153000
85
Providing and applying Prime tack coat with emulsion S.S.-2 using emulsion distributor at the rate of 0.70 kg per sqm on the prepared surface cleaned with air compressure. .
6000
228000
38
Providing and applying tack coat with VG_10 using bitumen distributor at the rate of 0.35 kg per sqm on the prepared surface cleaned with hydraulic broom .
6000
90000
15
Providing laying & rolling of open graded premix carpet of 20 mm thickness composed of 13.2mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line ,grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant ,laying and rolling with a three wheel 80-100 KN static roller capacity finished to required level and grades to be followed by seal coat .
6000
1158000
193
Providing and laying seal coat 'C' Type sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall .
6000
408000
68
1000mm dia NP-3 Hume Pipe Culvert
Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
78
10140
130
Laying reinforced cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling, concrete and masonary works in head walls and parapets
30
198000
6600
Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days.
3.3
26400
8000
Brick masonry work in 1:3 cement mortar in foundation complete excluding pointing and plastering as per drawing and technical speficiations clauses 600, 1202 & 1203
40
286000
7150
Pointing with cement mortar (1:3) on brickwork in sub structure & super structure as per drawing and technical specification clauses 613.3 , 1204 and 1208.4
97
7275
75
Plastering with cement mortar (1:4) 15 mm thick on brickwork in substructure/ superstracutre as per technical specification clauses 613.4 & 1204
3.9
624
160
Construction of 350 mm dia gool. Including cost of all material , labour T&P charges etc complete.
30
63000
2100
Routine maintenance charge up to 5 Years for any diffect / damaged found after construction of all works including restoration of paved surface , shoulders , culverts road furniture etc complete. As per direction of E/I.
1
875920
875920.42