Public Works Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date13 Jan 2025
Closing Soon22 Jan 2025
Tender Amount₹ 1,20,00,000 
Notes
Download

Costs

Summary

Construction Of Reva Dabrapur Road To Achrauli Link Road (including 5 Year Maintenance Cost) Under Ridf Scheme In Year 2024-25

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cement Treated Base (Wet Mix Macadam + 4% Cement (OPC) : Providing, laying and spreading material on a prepared base, cement @ 4%by weight to the spread material manually, mix in place with Rotavator and compacting with the Road Roller at OMC to achieve the desired unconfined compressive strength and to form a layer of base.

427

4240

1810480

... More
Tack Coat (iii) Providing and applying tack coat with Bitumen VG-10 using bitumen pressure distributor at the rate of 0.35 kg per sqm on the granular surface cleaned with Hydraulic broom as per Technical Specification Clause 503.Clause 503. MORD.

3562.5

16

57000

... More
20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type C as per Technical Specification Clause 508. Case - I By Manual Means (I) Bitumen VG-10

3562.5

176

627000

... More
Seal Coat Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 Case - III : Type C (B) By Manual Means (I) Bitumen VG-10

3562.5

61

217312.5

... More
Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1..

1612

75

120900

... More
Providing concrete for plain (1:3:6) concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (M-10) (MORD 11.04) (i) P.C.C grade M 10 (i) Nominal Mix 1:3:6

12.8

6500

83200

... More
Brick masonry work (1:4) in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 (MORD 11.05) (ii) Brick masonry in 1:4 cement mortar

38.4

6700

257280

... More
Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204 (MORD 12.02)

105

80

8400

... More
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204 (MORD 12.03)

9.5

200

1900

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. (MORD 9.3 (B) 1000 mm dia

15

5700

85500

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. (750 mm dia)

7.5

3500

26250

... More
Laying Cement Concrete Pipe NP3 (burried conduits) on first class bedding of granular material including fixing collar with cement sand mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonary work in head wall and parapet (MORD 9.7) 500 mm dia

15

1800

27000

... More
Lettering and painting of culvert and parapet etc. complete as per direction of Engineer In-charge.

5

500

2500

... More
Supply and Fixing of Kilometer Stone, Hectometer Stone and Sign Board etc.

1.35

20000

27000

... More
Maintenance of bituminous surface road and / or gravel road and / or WBM road including filling of pot holes and patch repair etc., restoration of rain cuts and dressing of side slopes / berms, making up of berms / shoulders, maintenance of drains, maintenance of guard rail and parapets, maintenance of road signs, speed breakers, standing tree adjacent to road wherever required, maintenance of 200m (hectometre stone) and kilometre stones, cutting of branches of trees, shrubs and trimming of grass and weeds etc., white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per performance Index Annexure-1) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated 16.01.2024 & Enc Letter no. 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024) (I) Maintenance of First Year (@0% of Total Work Amount of 1 to 17)

1

-

-

... More
Maintenance of bituminous surface road and / or gravel road and / or WBM road including filling of pot holes and patch repair etc., restoration of rain cuts and dressing of side slopes / berms, making up of berms / shoulders, maintenance of drains, maintenance of guard rail and parapets, maintenance of road signs, speed breakers, standing tree adjacent to road wherever required, maintenance of 200m (hectometre stone) and kilometre stones, cutting of branches of trees, shrubs and trimming of grass and weeds etc., white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per performance Index Annexure-1) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated 16.01.2024 & Enc Letter no. 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024) (II) Maintenance of Second Year (@1.0% of Total Work Amount of 1 to 17)

1

52661

52661

... More
Maintenance of bituminous surface road and / or gravel road and / or WBM road including filling of pot holes and patch repair etc., restoration of rain cuts and dressing of side slopes / berms, making up of berms / shoulders, maintenance of drains, maintenance of guard rail and parapets, maintenance of road signs, speed breakers, standing tree adjacent to road wherever required, maintenance of 200m (hectometre stone) and kilometre stones, cutting of branches of trees, shrubs and trimming of grass and weeds etc., white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per performance Index Annexure-1) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated 16.01.2024 & Enc Letter no. 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024) (III) Maintenance of Third Year (@1.5% of Total Work Amount of 1 to 17)

1

78992

78992

... More
Maintenance of bituminous surface road and / or gravel road and / or WBM road including filling of pot holes and patch repair etc., restoration of rain cuts and dressing of side slopes / berms, making up of berms / shoulders, maintenance of drains, maintenance of guard rail and parapets, maintenance of road signs, speed breakers, standing tree adjacent to road wherever required, maintenance of 200m (hectometre stone) and kilometre stones, cutting of branches of trees, shrubs and trimming of grass and weeds etc., white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per performance Index Annexure-1) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated 16.01.2024 & Enc Letter no. 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024) (IV) Maintenance of Forth Year (@2.0% of Total Work Amount of 1 to 17)

1

105323

105323

... More
Maintenance of bituminous surface road and / or gravel road and / or WBM road including filling of pot holes and patch repair etc., restoration of rain cuts and dressing of side slopes / berms, making up of berms / shoulders, maintenance of drains, maintenance of guard rail and parapets, maintenance of road signs, speed breakers, standing tree adjacent to road wherever required, maintenance of 200m (hectometre stone) and kilometre stones, cutting of branches of trees, shrubs and trimming of grass and weeds etc., white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per performance Index Annexure-1) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated 16.01.2024 & Enc Letter no. 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024) (V) Maintenance of Fifth Year (@3% of Total Work Amount of 1 to 17)

1

157984

157984

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density as per MORD specification 401

116.6

3380

394108

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes (22.4-53 mm guage) to water bound macadam (WBM-3) specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per MORD Technical Specification Clause 405. (MORD 4.7) (3) (a) by Manual Means for C.C. Road

112.5

3950

444375

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,

225

8100

1822500

... More
Maintenance of Concrete surface including Crack Sealing spot patching, restoration of rain cuts and dressing of side slopes / berms, making up of berms / shoulders, maintenance of drains, maintenance of culverts and cause ways, maintenance of guard rails and parapet, maintenance of road signs, speed breakers, standing trees adjacent to road wherever required. maintenance of 200m (hectometre stone) and kilometre stones, cutting of branches of trees, shrubs and trimming of grass and weeds etc., white washing of parapets including CD works, painting of guard stones, re-fidding of displaced guard stones (as per performance Index Annexure-2) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated16.01.2024 & Enc Letter No. 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024) (I) Maintenance of First Year (@ 0% of Total Work Amount of 23 to 25)

1

-

-

... More
Maintenance of Concrete surface including Crack Sealing spot patching, restoration of rain cuts and dressing of side slopes / berms, making up of berms / shoulders, maintenance of drains, maintenance of culverts and cause ways, maintenance of guard rails and parapet, maintenance of road signs, speed breakers, standing trees adjacent to road wherever required. maintenance of 200m (hectometre stone) and kilometre stones, cutting of branches of trees, shrubs and trimming of grass and weeds etc., white washing of parapets including CD works, painting of guard stones, re-fidding of displaced guard stones (as per performance Index Annexure-2) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated16.01.2024 & Enc Letter No. 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024) (II) Maintenance of Second Year (@ 0.25% of Total Work Amount of 23 to 25)

1

6652

6652

... More
Maintenance of Concrete surface including Crack Sealing spot patching, restoration of rain cuts and dressing of side slopes / berms, making up of berms / shoulders, maintenance of drains, maintenance of culverts and cause ways, maintenance of guard rails and parapet, maintenance of road signs, speed breakers, standing trees adjacent to road wherever required. maintenance of 200m (hectometre stone) and kilometre stones, cutting of branches of trees, shrubs and trimming of grass and weeds etc., white washing of parapets including CD works, painting of guard stones, re-fidding of displaced guard stones (as per performance Index Annexure-2) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated16.01.2024 & Enc Letter No. 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024) (III) Maintenance of Third Year (@ 0.5% of Total Work Amount of 23 to 25)

1

13304

13304

... More
Maintenance of Concrete surface including Crack Sealing spot patching, restoration of rain cuts and dressing of side slopes / berms, making up of berms / shoulders, maintenance of drains, maintenance of culverts and cause ways, maintenance of guard rails and parapet, maintenance of road signs, speed breakers, standing trees adjacent to road wherever required. maintenance of 200m (hectometre stone) and kilometre stones, cutting of branches of trees, shrubs and trimming of grass and weeds etc., white washing of parapets including CD works, painting of guard stones, re-fidding of displaced guard stones (as per performance Index Annexure-2) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated16.01.2024 & Enc Letter No. 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024) (IV) Maintenance of Forth Year (@ 0.75% of Total Work Amount of 23 to 25)

1

19957

19957

... More
Maintenance of Concrete surface including Crack Sealing spot patching, restoration of rain cuts and dressing of side slopes / berms, making up of berms / shoulders, maintenance of drains, maintenance of culverts and cause ways, maintenance of guard rails and parapet, maintenance of road signs, speed breakers, standing trees adjacent to road wherever required. maintenance of 200m (hectometre stone) and kilometre stones, cutting of branches of trees, shrubs and trimming of grass and weeds etc., white washing of parapets including CD works, painting of guard stones, re-fidding of displaced guard stones (as per performance Index Annexure-2) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated16.01.2024 & Enc Letter No. 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024) (V) Maintenance of Fifth Year (@ 1% of Total Work Amount of 23 to 25)

1

26609

26609



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.