Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date27 Dec 2024
Closing Date13 Jan 2025
Tender Amount₹ 1,85,00,000
Costs
EMD
₹ 11,25,000Document Cost
₹ 2,354Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEMBD_986757_2Bid Award Id
ViewTender No
6369/E-Tender-RC/24-25 Date 11.12.2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401
690
3500
2415000
... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specifications including premixing the material with water at OMC in mechanical mix (Plant), carriage of mixed material by tipper to site laying in uniform layers With grader in sub-base/base course on well prepared under base and compacting with vibratory-roller to achieve the desired density. Laying using grader
498
3700
1842600
... More
Providing, laying and spreading of graded stone aggregate (WMM) after mixing with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying with 1% OPC cement and 3.5% Emulsion in uniform single layer on sub base/subgrade and compacting with the road roller to achieve the desire density
855
7700
6583500
... More
Providing and applying Tack Coat with Bitumen VG-10 using pressure distributor @ 0.25 kg per sqm on the prepared Granular surface cleaned with mechanical broom.
8332.5
14
116655
... More
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.40% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisherwith sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507complete in all respects.
208.3
11500
2395450
... More
Excavation for Structures; Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary soil (Depth upto 3Mt)
713.5
100
71350
... More
PCC 1:3:6 in foundation; Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
147.4
5560
819544
... More
Reinforced Cement Concrete-M20 in Foundation complete as per Drawing and Technical Specifications.
318
6800
2162400
... More
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawing and Technical Specifications.
16
85000
1360000
... More
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete as per Drawing and Technical Specifications. (Morth Sr. No. 12.5)
33
6200
204600
... More
Providing and laying reinforced cement concrete pipe NP3 1000mm dia for culverts. (Morth SI. No. 9.20)
10
9800
98000
... More
Providing and laying reinforced cement concrete pipe NP3 600mm dia for culverts. (Morth SI. No. 9.20)
20
5000
100000
... More
Pointing with cement mortar (1:3) on brick work in substructure.. Morth specification 1300 & 2200(Sr.No.-13.2)
66
77
5082
... More
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications (Morth Sr. No. 13.3)
2.97
152
452.03
... More
Maintainance Charge including @ Total of Work Amount 1 to 17 (Excluding G.S.T.) (I) Maintainance of First Year (@0% of Total Work Amount of S.No. 1 to S.No.17)
1
-
-
... More
Maintainance Charge including @ Total of Work Amount 1 to 17 (Excluding G.S.T.) (I) Maintainance of Second Year (@0.25% of Total Work Amount of S.No. 1 to S.No.17)
1
46137
46137.47
... More
Maintainance Charge including @ Total of Work Amount 1 to 17 (Excluding G.S.T.) (I) Maintainance of Third Year (@0.50% of Total Work Amount of S.No. 1 to S.No.17)
1
92274
92274.93
... More
Maintainance Charge including @ Total of Work Amount 1 to 17 (Excluding G.S.T.) (I) Maintainance of Fourth Year (@0.75% of Total Work Amount of S.No. 1 to S.No.17)
1
138412
138412.4
... More
Maintainance Charge including @ Total of Work Amount 1 to 17 (Excluding G.S.T.) (I) Maintainance of Fifth Year (@1% of Total Work Amount of S.No. 1 to S.No.17)
1
184549
184549.87