Public Works Department Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date19 Feb 2025
Closing Soon7 Mar 2025
Tender Amount₹ 37,63,000
Costs
EMD
₹ 3,77,000Document Cost
₹ 2,714Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_CEUBZ_1008091_1Tender No
5760/04 E-NIVIDA-BASTI CIRCLE/24-25 DATED-20-12-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing, laying and spreading WBM Graded material on a prepared sub base, cement @ 4% by weight to the spread material manualy, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub base.
187.5
5310
995625
... More
Providing and applying tack coat with Bitumen (VG-10) using bitumen pressure distributor @ 0.35 kg/sqm on the prepared bituminous surfaces as per Technical Specification Clause 503.
1875
15
28125
... More
Providing laying and rolling of open-graded premix carpet of 20 mm thickness, composed of 13.2 mm to 5.6 mm aggregates and using Bitumen VG-10, to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller, finished to required level and grades to be followed by seal coatType C as per Technical Specification Clause 508.
1875
212
397500
... More
Providing and laying seal coat type C, composed of as chipping of 6.7mm size passing 100% passing 9.5 mm sieve and retained on 2.36 mm sieve and VG-10 Bitumen, to seal the voids in a bitumenous surface, including its mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller, finished to required level, grades and cross fall, as per Technical Specification Clause 508.
1875
73
136875
... More
Earth work in cutting or in embankment in ordinary soil excavation to be the from of regular pits not exceeding ½meter (20'' ) in depth and earth work in embankment to be in 20cm (80'' ) layers,including ramming and dressing the surface to required levels and slopes and including 1.5m (5'' ) lift and 30m (100'' ) lead. The earth form cutting to be used in making embankment or to be deposited as spoil banks within 30m (100'' ) distance as directed by the E/I. For Patri work
350
105
36750
... More
05 Year Maintenance-
1st Year maintenance charge @ 0.00% including labour cess.(GST shall be paid extra).
1
-
-
... More
2nd Year maintenance charge @ 0.75% including labour cess.(GST shall be paid extra).
1
22616
22616
... More
3rd Year maintenance charge @ 1.50% including labour cess.(GST shall be paid extra).
1
45231
45231
... More
4rth Year maintenance charge @ 2.25% including labour cess.(GST shall be paid extra).
1
67847
67847
... More
5th Year maintenance charge @ 3.00% including labour cess.(GST shall be paid extra).
1
90462
90462
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%