Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date20 Dec 2024
Closing Date8 Jan 2025
Tender Amount₹ 40,23,000
Costs
EMD
₹ 4,00,000Document Cost
₹ 2,714Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEUFZ_985234_6Tender No
3214/1com-Sul.A.Cir./2024-25 DATED-10.12.2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and laying G-3 i/c spreading and compacting stone aggregates of specific size to water bound macadam specification including spreading in uniform thickness, handpacking, rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber, applying and brooming, crushible screening to fill up the interstices of coarse aggregate, watering and compacting, to the required density grading 3 as per technical specification clause 405. Including 1% Labour Cess.
225
3920
882000
... More
Brick edging on both side of the road 7.50 cm wide with M-150 class bricks laid on edge with mud mortar including cost of bricks,dressing and ramming the excavated earth in proper slope, all labour, T&P etc for proper completion of the work as per direction of Engineer-in-Charge.
0.8
81818
65454.4
... More
Providing and applying primer coat with Bitumen Emulsion (SS-2) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502. Including 1% Labour Cess & cost of bitumen.
3000
38
115500
... More
Providing and applying Tack coat with VG-10 Grade using bitumen pressure dristibutor at the rate of 0.35 Kg per Sqm on the prepared granular surface treated with primer and cleaned with hydraulic broom as per technical specification clause 503. Including 1% Labour Cess & cost of bitumen.
3000
16
49500
... More
Providing, laying and rolling open-graded premix carpet of 20 mm thickness composed of 13.2 mm and 11.2 mm aggregate using VG-10 grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base by manual means , including mixing in a suitable mixol, laying and rolling with a three wheel 80-100 Kn Static roller capacity, finised to required level and grades to be followed by seal coat as per Technical Specification Clause 508. Including 1% Labour Cess & cost of bitumen.
3000
185
555000
... More
Providing and laying of seal coat by mechanical means with VG-10 Bulk bitumen sealing the voids in a bituminous surface laid to the specified levels grade and cross fall using Type C as per Technical Specification Clause 510. Including 1% Labour Cess & cost of bitumen.
3000
66
198000
... More
Earth Work in road patri with ordinary soil including levelling,dressing, ramming complete work,t&p etc.
350
88
30800
... More
P/L of 350mm Dia Hume Pipe Culvert.
Earth work in excavation In foundation parapet wall. S.I. no 251. As per PWD Specifcation and direction of Engineer-in-Charge.
18
110
1980
... More
Supply of hume pipe & fixing with coller in 1:2 cement and fine sand mortar complete job. As per PWD Specifcation and direction of Engineer-in-Charge.
15
1160
17400
... More
Laying of hume pipe with coller ((Hume pipe (350 mm dia)). As per PWD Specifcation and direction of Engineer-in-Charge.
6
425
2550
... More
P/L of 600mm Dia Hume Pipe Culvert.
Earth work in excavation In foundation parapet wall. S.I. no 251 As per PWD Specifcation and direction of Engineer-in-Charge.
40
110
4400
... More
Providing & laying plain cement concrete in foundation with cement, sand and 40 mm guage brick ballast (1:4:8) S.I.No 275 As per PWD Specifcation and direction of Engineer-in-Charge.
3.4
6200
21080
... More
Brick work in 1:4 cement and coarse sand mortar in foundation upto plinth as per S.I no 305 B As per PWD Specifcation and direction of Engineer-in-Charge.
5.9
6210
36639
... More
Struck pointing 1:2 in cement and fine sand mortar as per item no 574 As per PWD Specifcation and direction of Engineer-in-Charge.
6.78
137
928.86
... More
Plaster 1:4 in cement and fine sand mortar as per item no 583 As per PWD Specifcation and direction of Engineer-in-Charge.
2.76
168
463.68
... More
Supply of hume pipe with coller (600 mm dia) As per PWD Specifcation and direction of Engineer-in-Charge.
7.5
2250
16875
... More
laying of hume pipe and fixing with coller in 1:2 cement and fine sand mortar complete job. As per PWD Specifcation and direction of Engineer-in-Charge.
3
598
1794
... More
The routine maintenance of above road work including embankment, patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T & P labour but excluding GST) for 1st Year maintenance cost @ 0.00% of Tendered cost of Construction as per circular No.-3689 C-OPRMC/Mool/2023-24 Dt 17.02.2024
1
-
-
... More
The routine maintenance of above road work including embankment, patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T & P labour but excluding GST) for 2nd Year maintenance cost @ 0.75% of Tendered cost of Construction as per circular No.-3689 C-OPRMC/Mool/2023-24 Dt 17.02.2024
1
25490
25490
... More
The routine maintenance of above road work including embankment, patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T & P labour but excluding GST) for 3rd Year maintenance cost @ 1.50% of Tendered cost of Construction as per circular No.-3689 C-OPRMC/Mool/2023-24 Dt 17.02.2024
1
51880
51880
... More
The routine maintenance of above road work including embankment, patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T & P labour but excluding GST) for 4th Year maintenance cost @ 2.25% of Tendered cost of Construction as per circular No.-3689 C-OPRMC/Mool/2023-24 Dt 17.02.2024
1
77821
77821
... More
The routine maintenance of above road work including embankment, patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T & P labour but excluding GST) for 5th Year maintenance cost @ 3.00% of Tendered cost of Construction as per circular No.-3689 C-OPRMC/Mool/2023-24 Dt 17.02.2024
1
103761
103761
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%