Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date29 Nov 2024
Closing Date10 Dec 2024
Tender Amount₹ 20,75,000
Costs
EMD
₹ 2,07,500Document Cost
₹ 880Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEUFZ_978230_12Bid Award Id
ViewTender No
3048/NIVIDA DT. 21-11-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing and laying seal coat by manual means with VG-10 bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510
5100
70
357000
... More
Earth work in Both side Patri in ordinary soil including lift upto 1.50 mtr. and lead up to 30.00 mtr. and also including ramming dressing the surface to required level and slope as per direction of E/I.
500
110
55000
... More
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 1St Year Maintenance Cost @ Charge - 0.00% (Total Cost of Item nos. 1 to 5)
1
-
-
... More
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period wwhhiicchh bbeeggiinnss ffrroomm tthhee aaccttuuaall CCoommpplleettiioonn DDaattee aanndd ends after five years.(including cost of material T&P labour but excluding GST) 2nd Year Maintenance Cost @ 1.50% (Total Cost of Item nos. 1 to 5)
1
26792
26792.25
... More
The routine maintenance of above road work including earthen shoulder, and bituminous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 3rd Year Maintenance Cost @ 3.00% (Total Cost of Item nos. 1 to 5)
1
53584
53584.5
... More
The routine maintenance of above road work including earthen shoulder, and bituminous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 4th Year Maintenance Cost @ 4.50% (Total Cost of Item nos. 1 to 5)
1
80376
80376.75
... More
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period wwhhiicchh bbeeggiinnss ffrroomm tthhee aaccttuuaall CCoommpplleettiioonn DDaattee aanndd ends after five years.(including cost of material T&P labour but excluding GST) 5th Year Maintenance Cost @ 6.00% (Total Cost of Item nos. 1 to 5)
1
107169
107169
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements