Public Works Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Public Works Department - PWD Tender

Works
Eprocure
Opening Date23 May 2018
Closing Date29 May 2018
Tender Amount₹ 42,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of granular sub base by providing close graded material spreading in uniform layer with motor grader on prepared surface mix in place method with rotavator at OMC and compacting with vibartory power roller to achieve the desired density including complete as per clause 401 (Excluding GST)

380

1406000

3700

... More
Provinding, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the materials with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers with paver in sub base/base couse on well prepared surface and compacting with vibratory roller to achieve the desired density (Excluding GST)

300

1170000

3900

... More
Providing and applying primer coat with emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.60 kg/ sqm using mechanical means as per clause 502 (Excluding GST)

1750

43750

25

... More
Providing and laying dense graded bituminous macadam with 40-60 TPH HMP producing an avarage output of 75 tonne per hour using crused aggregates of specified grading premixed with bituminous binder @ 4.50 percent by weight of total mix and filler, transporting the hot mix to work site, laying with hydostatic paver finisher with sensor control to be required grade, level and alignment, rolling with smooth wheeled , vibratory and tendom roller to achieve the desired compaction as per MoRT&H Specification Clause 507 complete in all respects. (Excluding GST)

87

800400

9200

... More
Providing and applying tack coat with bitumen VG.-10 with pressure distributor at the rate of 0.30 kg per sqm on the prepare bituminous surface cleaned with mechanical broom as per MoRT&H Specification Clause 503 (Excluding GST)

1750

17500

10

... More
Providing and laying bituminous concrete with 60-90 TPH hot mix plant producing an avarage output of 75 tonne per hour using crushed aggregates of specified grading premixed with bituminous binder @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with hydostatic paver finisher with sensor control to the required grade, level and alignment , rolling with smooth wheeled, vibratory and tendom roller to achieve the desired compaction as per MoRT&H Specification Clause 509 complete in all respects. (Excluding GST)

43

417100

9700

... More
Construction of patri using earth in proper slope with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement for proper completion of work. (For Normal Earth) (Excluding GST and Royalty)

100

7300

73

... More
Scraping old surface

375

600

1.6



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.