If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date22 Mar 2025
Closing Soon27 Mar 2025
Tender Amount₹ 7,50,00,000
Costs
EMD
₹ 15,00,000Document Cost
₹ 2,714Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_CEUFZ_1020463_1Tender No
1837/2com ayo-ambe-circle/2025 dt. 19.03.2025Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of embankment with approved materials obtained from Borrowpits with all lifts and leads (beyond 2 Km lead), transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. Complete as per MORT&H Sr No. 3.16 , 305
20380
-
-
... More
Construction of earthen shoulders with approved material obtained from borrow pits area lead up to 3 Km with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to97% proctor density requirement of table No. 300-2 MORT&H . Complete as per MORT&H Sr No. 3.18 , 305
2446
-
-
... More
Construction of Granular Sub-Base by providing Close graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory roller to achieve the desired density, Complete as per MORT&H Sr No. 4.01 , 401
3581
-
-
... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Complete as per MORT&H Sr No. 4.14 , 406
3007
-
-
... More
Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 to 1.00 kg/sqm using mechanical means. (Over WMM Surface) Complete as per MORT&H Sr No. 5.01 , 502
25960
-
-
... More
Providing and applying tack coat with bitumen (VG-10) using Bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. (Over DBM Surface for BC) Complete as per MORT&H Sr No. 5.02 , 503
25960
-
-
... More
Providing and laying dense graded bituminous macadam grade 2with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. Complete as per MORT&H Sr No. 5.04 , 505B
1687.4
-
-
... More
Providing and laying bituminous concrete grade2 with hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.4% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects Complete as per MORT&H Sr No. 5.05 , 507B
778.8
-
-
... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Complete as per MORT&H Sr No. 9.01 , 304B
880
-
-
... More
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days (For Hume Pipe Culvert) Complete as per MORT&H Sr No. 9.03 , 2100
120
-
-
... More
Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.RCC Grade M20 using batching plant transit mixer & Manual placing (For Drain & Culvert Bed Block) Complete as per MORT&H Sr No. 9.14 , 1500, 1700 & 2100 C Case II
342
-
-
... More
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. Complete as per MORT&H Sr No. 9.16 , 1600
201.6
-
-
... More
The routine maintenance of above road work including earthen shoulder and bituminous pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years. (Including cost of material, T&P, labour but excluding GST) for 1st year maintenance cost @ 0.00%.
1
-
-
... More
The routine maintenance of above road work including earthen shoulder and bituminous pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years. (Including cost of material, T&P, labour but excluding GST) for 2nd year maintenance cost @ 0.25%.
1
-
-
... More
The routine maintenance of above road work including earthen shoulder and bituminous pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years. (Including cost of material, T&P, labour but excluding GST) for 3rd year maintenance cost @ 0.50%.
1
-
-
... More
The routine maintenance of above road work including earthen shoulder and bituminous pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years. (Including cost of material, T&P, labour but excluding GST) for 4th year maintenance cost @ 0.75%.
1
-
-
... More
The routine maintenance of above road work including earthen shoulder and bituminous pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years. (Including cost of material, T&P, labour but excluding GST) for 5th year maintenance cost @ 1.0%.
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%