Public Works Department Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Bridge Construction
Eprocure
Opening Date19 Mar 2025
Closing Date24 Mar 2025
Tender Amount₹ 2,50,00,000
Costs
EMD
₹ 14,50,000Document Cost
₹ 2,714Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_CEMRT_1019205_1Bid Award Id
ViewTender No
1674/25MS-S/2025 Date 24-02-2025Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Making balli Piling in river stream for providing of a dry working area including soring G.I. Sheets, E.C. Bags, earth work etc. as required and directed by Engineer in Charge. i/c all taxess,labour cess,levy,toll fee,royalty,contractor profit but excluding GST.
75
560
42000
... More
Structural steel or iron work in cutting edge of well brought to required shape and joint as necessary including supply of steel, its cutting, bending, welding and completion of work as directed by Engineer-in-charge wastages etc. for proper completion of work. (MORT&H Sr.No. 12.10, 1200&1900) i/c all taxess,labour cess,levy,toll fee,royalty,contractor profit but excluding GST.
4.3
117747
506312.1
... More
RCC work in M-30 in well curb with cement, approved coarse sand and 2 cm gauge well graded grit including necessary shuttering, placing and fixing of reinforcement including cement including its binding with wire but excluding cost of reinforcement and also including supply of all materials, labour, T&P etc. required for proper completion of work. (MORT&H Sr. No. 12.11A Case-II) i/c all taxess,labour cess,levy,toll fee,royalty,contractor profit but excluding GST.
30
9151
274530
... More
RCC work in M-30 in well steining with cement, approved coarse sand and 2 cm gauge well graded grit including necessary shuttering, placing and fixing of reinforcement including cement including its binding with wire but excluding cost of reinforcement and also including supply of all materials, labour, T&P etc. required for proper completion of work. (MORT&H Sr. No. 12.11B(vii) Case-II) i/c all taxess,labour cess,levy,toll fee,royalty,contractor profit but excluding GST.
445
8388
3732660
... More
Sinking upto 6 M external dia through all kind of sand silt, clay except hard stratum like kankar, bouldes,rocks only below the low water level including loading and unloading of weight and pumping out of water including necessary T&P machines, labour etc required for proper completion of work. (MORT&H Sr. No. 12.12B(i)) depth below bed level up to 3.0M i/c all taxess,labour cess,levy,toll fee,royalty,contractor profit but excluding GST.
9
6999
62991
... More
Sinking upto 6 M external dia through all kind of sand silt, clay except hard stratum like kankar, bouldes,rocks only below the low water level including loading and unloading of weight and pumping out of water including necessary T&P machines, labour etc required for proper completion of work. (MORT&H Sr. No. 12.12B(ii)) depth below 3.00 to 10 M i/c all taxess,labour cess,levy,toll fee,royalty,contractor profit but excluding GST.
21
15589
327369
... More
Sinking upto 6 M external dia through all kind of sand silt, clay except hard stratum like kankar, bouldes,rocks only below the low water level including loading and unloading of weight and pumping out of water including necessary T&P machines, labour etc required for proper completion of work. (MORT&H Sr. No. 12.12B(iii)) Beyond 10.00 M i/c all taxess,labour cess,levy,toll fee,royalty,contractor profit but excluding GST.
25.5
26662
679881
... More
CC work in M-25 in bottom plugging of well with cement , approved coarse sand and to 2cm. Gauge well graded grit including necesssary shuttering , placing and fixing of reinforcement including cement including its binding with wire but excluding cost of reinforcement and also including supply of all materials, labour, T&P etc. required for proper completion of work. (MORT&H Sr. No.12.11 C-(ii), Case-I) i/c all taxess,labour cess,levy,toll fee,royalty,contractor profit but excluding GST.
107
7423
794261
... More
Local sand filling inside the well between bottom and top plugging including watering, ramming and also including necessary T&P etc required for proper completion of work. (MORT&H Sr. No.12.21) i/c all taxess,labour cess,levy,toll fee,royalty,contractor profit but excluding GST.
535
1717
918595
... More
CC work in M-25 in intermediate plugging of well with cement , approved coarse sand and to 2cm. Gauge well graded grit including necesssary shuttering , placing and fixing of reinforcement including cement including its binding with wire but excluding cost of reinforcement and also including supply of all materials, labour, T&P etc. required for proper completion of work. (MORT&H Sr. No. 12.11D(ii) Case-II) i/c all taxess,labour cess,levy,toll fee,royalty,contractor profit but excluding GST.
9
7080
63720
... More
RCC work in M-30 in well caps with cement , approved coarse sand and 2cm. Gauge well graded grit including necesssary shuttering , placing and fixing of reinforcement including cement including its binding with wire but excluding cost of reinforcement and also including supply of all materials, labour, T&P etc. required for proper completion of work. (MORT&H Sr. No. 12.11F(iii) Case-I) i/c all taxess,labour cess,levy,toll fee,royalty,contractor profit but excluding GST.
88
8069
710072
... More
RCC work in M-30 in substructure with cement , approved coarse sand and 2cm. Gauge well graded grit including necesssary shuttering , placing and fixing of reinforcement including cement including its binding with wire but excluding cost of reinforcement and also including supply of all materials, labour, T&P etc. required for proper completion of work. (MORT&H Sr. No. 13.05 G p Case-I) i/c all taxess,labour cess,levy,toll fee,royalty,contractor profit but excluding GST.
128
8307
1063296
... More
Furnishing and placing Reinforced concrete with grade M-35 in super structure as per drawing and technical specification with cement approved coarse sand and 2 cm gauge well graded grit including necesssary shuttering , placing and fixing of reinforcement including cement including its binding with wire but excluding cost of reinforcement and also including supply of all materials, labour, T&P etc. required for proper completion of work. (MORT&H Sr. No. 14.01D(ii)P i/c all taxess,labour cess,levy,toll fee,royalty,contractor profit but excluding GST.
195
10330
2014350
... More
RCC work in M-35 in Crash Barrier in superstructure with cement , approved coarse sand and 2cm. Gauge well graded grit including necesssary shuttering ,all materials, labour, T&P etc. required for proper completion of work. (MORT&H Sr. No. 14.15C i/c all taxess,labour cess,levy,toll fee,royalty,contractor profit but excluding GST.
24
9757
234168
... More
HYSSD steel or iron work in Foundation brought to required shape including cutting, bending and also including cost of necessary reinforcement for proper completion of work. (MORT&H Sr. No. 12.42) i/c all taxess,labour cess,levy,toll fee,royalty,contractor profit but excluding GST.
37.3
86684
3233313.2
... More
HYSSD steel or iron work in Sub structure brought to required shape including cutting, bending and also including cost of necessary reinforcement for proper completion of work. (MORT&H Sr. No. 13.06) i/c all taxess,labour cess,levy,toll fee,royalty,contractor profit but excluding GST.
15.1
86968
1313216.8
... More
HYSSD steel or iron work in Super structure brought to required shape including cutting, bending and also including cost of necessary reinforcement for proper completion of work. (MORT&H Sr. No. 14.02) i/c all taxess,labour cess,levy,toll fee,royalty,contractor profit but excluding GST.
30.6
87252
2669911.2
... More
Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier of their authorised representative ensuring compliance to the manufacturer's instructions for installations for proper completion of work. (MORT&H Sr. No. 14.21) i/c all taxess,labour cess,levy,toll fee,royalty,contractor profit but excluding GST.
25
4200
105000
... More
Supplying and fixing of 100 mm dia drainage spouts of cast iron with gratings as per drawing and as per direction of Engineer-in-charge, including cost of all materials, labour, T&P etc required for proper completion of work. (MORT&H Sr. No. 14.09) i/c all taxess,labour cess,levy,toll fee,royalty,contractor profit but excluding GST.
12
976
11712
... More
Supplying fiting and fixing in position true to line and level elastomeric bearing of approved company/ manufacturer conforming to IRC:83 (part-II) section-IX and clause 2005 of morth specification complete including all accessories as per drawing and technical specifications. (MORT&H Sr. No. 13.16) i/c all taxess,labour cess,levy,toll fee,royalty,contractor profit but excluding GST.
12
12659
151908
... More
Reinforced cement concrete approach slab including M30 grade and formwork complete as per drawing and Technical specification. as per MoRT&H specification clause No 1500, 1600, 1700 & 2704, 14.11 i/c all taxess,labour cess,levy,toll fee,royalty,contractor profit but excluding GST.
15
7899
118485
... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications Clause 14.04 i/c all taxess,labour cess,levy,toll fee,royalty,contractor profit but excluding GST.
23
13202
303646
... More
Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces as per Technical Specifications No. 8.08, 803 i/c all taxess,labour cess,levy,toll fee,royalty,contractor profit but excluding GST.
117
82
9594
... More
Plain/Reinforced M-15 cement concrete in open foundation complete as per drawing and technical specification as per MoRT &H specification clause No. 1200,1500,1700 & 2100,12.08 A Case II complete in all respect. i/c all taxess,labour cess,levy,toll fee,royalty,contractor profit but excluding GST.
7
6771
47397
... More
M-150 Brick work in 1:3 cement and coarse sand mortar in foundation and plinth including supply of all materials,labour and T&P etc. required for proper completion of work (si no.307) i/c all taxess,labour cess,levy,toll fee,royalty,contractor profit but excluding GST.
12
4765
57180
... More
12mm thick Plaster with 1 part of cement and 3 part of coarse sand over brick work including supply of all materials,labour and T&P etc. required for proper completion of work (si no.582a) i/c all taxess,labour cess,levy,toll fee,royalty,contractor profit but excluding GST.
90
180
16200
... More
Carted earth work form 1 Km in embankment in compacted soil (95% proctor density) including roylity on earth, earth, excavation to be in the from of regular pits not exceeding 1/2M (20inch) in depth and earth work in embankment to be in 20cm thick layers including ramming and dressing the surface to required level and slopes and including 1.5m lift and 30m lead, labour T&P etc. required for proper completion of the work. including Royality i/c all taxess,labour cess,levy,toll fee,royalty,contractor profit but excluding GST.
6200
192
1190400
... More
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 i/c all taxess,labour cess,levy,toll fee,royalty,contractor profit but excluding GST.
182
2736
497952
... More
Providing, laying, spreading and compacting stone aggregates of specific sizes 63 mm to 45 mm to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. i/c all taxess,labour cess,levy,toll fee,royalty,contractor profit but excluding GST.
54
3259
175986
... More
Providing, laying, spreading and compacting stone aggregates of specific sizes 53 mm to 22.4 mm to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST.
54
3206
173124
... More
Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per technical specificaton clause 502 i/c all taxess,labour cess,levy,toll fee,royalty, cost of bitumen emulsion, contractor profit but excluding GST.
700
36
25200
... More
Providing and applying tack coat with bitumen VG-10 using bitumen distributor at the rate of 0.35 kg per sqm on the prepared bituminous surface with hydralic broom as per technical specificaton clause 503. I/c all taxes, Labour cess, levy, toll fee, royalty, cost of bitumen, Contractor Profit but excluding GST.
700
19
13300
... More
Providing, laying and rolling of open-graded Premix Carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades. as per technical specificaton clause 508. I/c all taxes, Labour cess, levy, toll fee, royalty, cost of bitumen, Contractor Profit but excluding GST.
700
145
101500
... More
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510A I/c all taxes, Labour cess, levy, toll fee, royalty, cost of bitumen Contractor, Profit but excluding GST.
700
63
44100
... More
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification No. 2504 (16.05) i/c all taxess,labour cess,levy,toll fee,royalty,contractor profit but excluding GST.
84
2320
194880
... More
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications No. 2504 (16.04) i/c all taxess,labour cess,levy,toll fee,royalty,contractor profit but excluding GST.
175
2234
390950
... More
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m. 3.16 i/c all taxess,labour cess,levy,toll fee,royalty,contractor profit but excluding GST.
21
60
1260
... More
Cement concrete with 4 cm gauge approved stone aggregate, coarse sand and cement in proportion 6:3:1 in foundation, mechanically mixed and vibrated including supply of all material, labour and T&P etc. required for proper completion of work. (SI No. 279b) i/c all taxess,labour cess,levy,toll fee,royalty,contractor profit but excluding GST.
7
5150
36050
... More
Cement concrete with 2 cm gauge approved stone aggregate, coarse sand and cement in proportion 4:2:1 including supply of all material, labour and T&P etc. required for proper completion of work. (SI No. 279A) i/c all taxess,labour cess,levy,toll fee,royalty,contractor profit but excluding GST.
1
5750
5750
... More
Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 40 kg each.(16.02) i/c all taxess,labour cess,levy,toll fee,royalty,contractor profit but excluding GST.
180
2964
533520
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements