Public Works Department Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date18 Mar 2025
Closing Date24 Mar 2025
Tender Amount₹ 2,06,00,000
Costs
EMD
₹ 12,30,000Document Cost
₹ 2,714Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_CEUCZ_1018919_1Bid Award Id
ViewTender No
01 M /1MT/ E-Tender/ U.C/2024 Dated 01.01.2025Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Cement Treated Base (W.M.M.) Providing, laying and spreading material on a prepared sub base,adding Cement at site @ 4% by weight to the spread material manually mixing in place with rotavator and compacting with road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of Base (By Manual) Including all taxes and labour cess but excluding GST
956
4670
4464520
... More
Providing ,Laying ,spreading and compacting stone aggregates of 53-22.4 mm size to water bound macadam specification including spreading in uniform thickness , hand packing ,rolling with Smooth wheel roller 80-100 KN in stages to proper grade and camber ,applying and brooming ,Stone screening to fill up the nterstices of coarse aggregate ,watering and compacting to the required density Including all taxes and labour cess but excluding GST
98
4650
455700
... More
Construction of Shoulder (Parti) with approved material obtained from availble land as permitted and approved by Engineer-in-Charge and as per Technical Specitaion Clause 301.3.4.1, with all lifts and leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.1and 300.2 as per Technical Specification clause 301.5 Including all taxes and labour cess but excluding GST
2050
94
192700
... More
Providing and applying tack coat with VG_10 using bitumen distributor at the rate of 0.35 kg per sqm on the prepared surface cleaned with hydraulic broom . Including Biumen, all taxes and labour cess but excluding GST
9562.5
17
162562.5
... More
Providing laying & rolling of open graded premix carpet of 20 mm thickness composed of 13.2mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line ,grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant ,laying and rolling with a three wheel 80-100 KN static roller capacity finished to required level and grades to be followed by seal coat Including Biumen, all taxes and labour cess but excluding GST
9562.5
185
1769062.5
... More
Providing and laying seal coat 'C' Type sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall . Including Biumen, all taxes and labour cess but excluding GST
9562.5
65
621562.5
... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M 30 (Grade), coarse and fine aggregates conforming to IS: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501. Including all taxes and labour cess but excluding GST
196
7700
1509200
... More
Earthwork in excavation for structures as per drawing and technical specification clause 305.1 ,including setting out,construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavted suitable material. Including all taxes and labour cess but excluding GST
365
35
12775
... More
Sand Filling in Foundation Trenches as per Drawing & Technical SpecificationIncluding all taxes and labour cess but excluding GST
11.9
550
6545
... More
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications Including all taxes and labour cess but excluding GST
40
95
3800
... More
RCC Grade M25 Plain/Reinforced Cement Concrete, in Well Foundation complete as per Drawing and Technical Specification.Including all taxes and labour cess but excluding GST
91.9
7700
707630
... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications Including all taxes and labour cess but excluding GST
10.5
74500
782250
... More
Plain cement concrete 1:3:6 norminal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed placed in foundation and compected by vibration including curing for 14 days complete Including all taxes and labour cess but excluding GST
62
7150
443300
... More
Brick masonry work in 1:3 cement and coarse sand mortar in foundation complete excluding pointing and plastering as per drawing and technical speficiations clauses 600, 1202 & 1203. Including all taxes and labour cess but excluding GST
117
6700
783900
... More
Providing and laying reinforced cement concrete M 20 grade in superstructure as per drawing and technical specifications clauses 800, 1205.4 and 1205.5
17
7350
124950
... More
Pointing with cement and fine sand mortar (1:3) on brick work in sub structure & super structure as per drawing & techinical specification clauses 613.3 & 1204 and 1208.4 Including all taxes and labour cess but excluding GST
93
70
6510
... More
Plastering with cement mortar (1:4) 15 mm thick on brickwork in substructure/superstracutre as per technical specification clauses 613.4 & 1204 Including all taxes and labour cess but excluding GST
360
200
72000
... More
Providing & Laying 1000 mm dia NP-3 RCC pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation protection works, back filling conrete and masonary works in head walls and parapets. complete as per deriction of e / i . Including all taxes and labour cess but excluding GST
22.5
5500
123750
... More
Providing & Laying 350 mm dia Laying reinforced cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling,concrete and masonary works in head walls and parapets. Including all taxes and labour cess but excluding GST
40
1900
76000
... More
Kilometre Stone
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause1703
ii)Ordinary Kilometer Stone (Precast) Including all taxes and labour cess but excluding GST
4
2550
10200
... More
Hectometer Stone
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703
iii)200 m stone (precast) Including all taxes and labour cess but excluding GST
12
720
8640
... More
Providing and fixing of semi reflective cautionary, mandatory and informatory sign
board as per IRC:67 made of 1.5 mm thick MS Sheet duly stove white colour in front and gray colour on back with red reflective border of 65 mm width and required letters and figures with reflective tape engineering grade as per Clause 1701.3.9 of MORD for Rural Roads of required shade and colour supported and welded on 47mm x 47 mm x 12 SWG sheet tube firmly fixed to the ground by mean of properly designed foundations with M-15 grade cement concrete 450x450x600 mm, 600 mm below ground level as per approved drawing Clause 1701.2.2 iv)800 mm x600 mm rectangular Including all taxes and labour cess but excluding GST
2
3900
7800
... More
Maintenance of constructed road for next five yrears after completion the contractor shall be paid total maintenance cost for five year in the form of installment as below, The payment shall the inclusive of cess but excluding GST. Payment shall be done as per satisfaction of engineer in charge regarding maintenance work carried out by contractor.. (Including Labour cess but Excluding GST)
(i) From completion of 1 Year to 2nd year 7.50%
2.9
43000
124700
... More
(ii) 2nd year to 3rd year 20%
2.9
86000
249400
... More
(iii) 3rd year to 4th year 30%
2.9
129000
374100
... More
(iv) 4th year to 5th year 40%
2.9
172000
498800
Evaluation Notes How It Works ?
Potential Partner