Pashchimanchal Vidyut Vitran Nigam Limited Tender

... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.

Pashchimanchal Vidyut Vitran Nigam Limited - PVVNL Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date4 Mar 2025
Closing Soon10 Mar 2025
Tender Amount₹ 1,23,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
ST Poles 11 mtr. long

73

-

-

... More
PCC Poles 8.5 mtr. long

204

-

-

... More
PCC Poles 11 mtr. long

400

-

-

... More
Safe carriage of store material from store center to JE Store/Sub Station with loading & unloading at both ends respectively without contractor porvading all item distance within- 0 to 50 Km

-

-

-

... More
ACSR Dog Conductor

8060

-

-

... More
LT ABC 3*95 sq mm

2035

-

-

... More
LT ABC 3*120 sq mm

16448

-

-

... More
11 KV XLPE CABLE (3X70) sq.mm

1770

-

-

... More
11 KV XLPE CABLE (3X185) sq.mm

2800

-

-

... More
11 KV XLPE CABLE (3X300) sq.mm

250

-

-

... More
33 KV XLPE CABLE (3X300) sq.mm

270

-

-

... More
GI WIRE 6 SQ GAGE

2200

-

-

... More
GI WIRE 8 SQ GAGE

200

-

-

... More
33 KV V TYPE CROSS ARM

40

-

-

... More
11 KV V TYPE CROSS ARM

446

-

-

... More
11 KV VCB

1

-

-

... More
11 KV VCB

1

-

-

... More
11 KV Pin Insulater

1359

-

-

... More
11 KV Disc Insulater

87

-

-

... More
Three Phase Distribution Box

103

-

-

... More
Loading, Safe carriage & unloading of heavy stock material channel, Angle and other site requerment any mattrial ETC from store center to JE Store/Sub Station with proper stacking of material, distance within 30 Kms.

20

-

-

... More
Safe carriage of store material from JE Store/Sub Station to Pit site as per site requirtement with loading & unloading at both ends respectively without contractor porvading all item distance within- 0 to 30 Km

-

-

-

... More
ACSR Dog Conductor

8060

-

-

... More
LT ABC 3*95 sq mm

2035

-

-

... More
LT ABC 3*120 sq mm

16448

-

-

... More
11 KV XLPE CABLE (3X70) sq.mm

1770

-

-

... More
11 KV XLPE CABLE (3X185) sq.mm

2800

-

-

... More
11 KV XLPE CABLE (3X300) sq.mm

250

-

-

... More
33 KV XLPE CABLE (3X300) sq.mm

270

-

-

... More
GI WIRE 6 SQ GAGE

2200

-

-

... More
GI WIRE 8 SQ GAGE

200

-

-

... More
33 KV V TYPE CROSS ARM

40

-

-

... More
11 KV V TYPE CROSS ARM

446

-

-

... More
11 KV VCB N/G CTR 200/100/5

1

-

-

... More
11 KV VCB N/G CTR 600/300 5A

1

-

-

... More
11 KV Pin Insulater

1359

-

-

... More
11 KV Disc Insulater

87

-

-

... More
Three Phase Distribution Box

103

-

-

... More
ST Poles 13 mtr. long

45

-

-

... More
ST Poles 11 mtr. long

73

-

-

... More
pcc Poles 11 mtr. long

400

-

-

... More
PCC Poles 8.5 mtr. long

204

-

-

... More
Loading, Safe carriage & unloading of heavy stock material channel, Angle and other site requerment any mattrial ETC from JE Store/Sub Station to Pit site as per site requirement with proper stacking of material, distance within 30 Kms.

20

-

-

... More
Erection of Single pole all size as per RESPO Drawing, fitting with all accessories Pin Insulator, F Bracket and etc as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.

-

-

-

... More
ST Poles 11 mtr. long

73

-

-

... More
ST Poles 13 mtr. long

45

-

-

... More
PCC Poles 8.5 mtr. long

204

-

-

... More
PCC Poles 11 mtr. long

400

-

-

... More
Excavation of For Each and grouting of Single Pole as per RESPO Drawing and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. The support shall be grouted with cement, sand and stone ballast in ratio 1:4:8 including the cost of Cement, Sand, Stone Ballast, Stone Pad etc. as per actual site requirement

-

-

-

... More
ST Poles 11 mtr. long

73

-

-

... More
ST Poles 13 mtr. long

45

-

-

... More
PCC Poles 8.5 mtr. long

204

-

-

... More
PCC Poles 11 mtr. long

400

-

-

... More
33 KV XLPE CABLE (3X300) sq.mm

270

-

-

... More
11 KV XLPE CABLE (3X300) sq.mm

250

-

-

... More
11 KV XLPE CABLE (3X185) sq.mm

2800

-

-

... More
11 KV XLPE CABLE (3X70) sq.mm

1770

-

-

... More
ACSR Dog Conductor

8060

-

-

... More
ACSR Weasel Conductor

1000

-

-

... More
LT ABC 3*120 sq mm

16448

-

-

... More
LT ABC 3*95 sq mm

2035

-

-

... More
Erection of stay set including the work of nozelling etc. as per RESPO manual and also including the cost of all grouting material, labour, T&P etc required for proper completion of work.

149

-

-

... More
Grouting of stay set including the work of nozelling etc. as per RESPO manual and also including the cost of all The support shall be grouted with cement, sand and stone ballast in ratio 1:4:8 including the cost of Cement, Sand, Stone Ballast, Stone etc. as per actual site requirement , labour, T&P etc required for proper completion of work.

161

-

-

... More
Providing and fixing of Barbed wire.

1314

-

-

... More
Fixing of earthing rod and Wire as per RESPO manual and as per direction of supervising engineer including the cost of labour, T&P etc. required for proper completion of work.

125

-

-

... More
Cutting/drilling/Welding of MS Channel Top Channal, site channel, site angle, Dropper Channal & Cross brassing angle and MS mattriel Including the work of fixing on STP Pole for construction of the line.

3825

-

-

... More
Mounting of 11 KV VCB Sub Station to Control Room by Hydra and manual Labour.

1

-

-

... More
Mounting of 11 KV VCB Sub Station to Control Room by Hydra and manual Labour.

1

-

-

... More
Fixing/Installaiton of 11 KV VCB

1

-

-

... More
Fixing/Installaiton of 11 KV VCB

1

-

-

... More
Fixing of 33 KV V TYPE CROSS ARM

40

-

-

... More
Fixing of 33 KV Disc Insulater

18

-

-

... More
Fixing of 33 KV Pin Insulater

105

-

-

... More
Fixing of 11 KV V TYPE CROSS ARM

446

-

-

... More
Fixing of 11 KV Pin Insulater

1359

-

-

... More
Fixing of 11 KV Disc Insulater

87

-

-

... More
Providing of Three Phase Distribution Box if not available in Store Center.

103

-

-

... More
Fixing of Three Phase Distribution Box

103

-

-

... More
Providing of G.I Pipe 6 inch dia

16

-

-

... More
Fixing of G.I Pipe 6 inch dia

16

-

-

... More
Chopping of branches of trees of eucalyptus, Neem, Keekar and other kind of trees along the route of the line and disposal of the same at suitable place.

5

-

-

... More
Providing and fixing of Water Level Earthing in heavy duty galvanised GI pipe with 50X6MM connecting strips as per respo norms

2

-

-

... More
Providing and fixing of HDPE Pipe for cable

730

-

-

... More
Drilling of dia 160 mm in Two Parallel bores by trench less Method by horizantal Boring by HDD Machine .

730

-

-

... More
Laying of HDPE Pipe Od-140 MM Dia-4 PE through HDD Method Trenchless on Road.

730

-

-

... More
Digging of Pits Of Size 4 Mtr X 4 Mtr X 1.5 Mtr. For Cable Loop

2

-

-

... More
Restoration of Pit After Laying Of Cable loop

2

-

-

... More
Hoisting of 33 KV 3X300 Sq mm XLPE Cable On Double Pole Structure through GI Pipe 140 MM dia 3 Mtr Long Fixed On Pole Structure Including its Jumpring Complete with Clamps Bolts and

2

-

-

... More
Providing & Fixing and Interconnecting 6 Mtr. Long Pieces of HDPE Pipe shocket.

80

-

-

... More
Laying And Pulling of 33 KV XLPE Cable Off size Throug HDPE Pipe

730

-

-

... More
Laying of 11/33 KV cable with Making open trench 1050x750sq.mm. with send ston slabe and bricks etc.

50

-

-

... More
Fixing of 11 KV Straight Through 3*70 SQ MM

8

-

-

... More
Fixing of 11 KV Straight Through 3*185 SQ MM

64

-

-

... More
Fixing of 33 KV XLPE Cable Jointing Kit 3*300 MM Indoor

4

-

-

... More
Fixing of 11 KV XLPE Cable Jointing Kit 3*300 MM Indoor

6

-

-

... More
Fixing of 33 KV XLPE Cable Jointing Kit 3*300 MM Out door

22

-

-

... More
Fixing of 11 KV XLPE Cable Jointing Kit 3*185 MM Out door

14

-

-

... More
Fixing of 11 KV XLPE Cable Jointing Kit 3*185 MM Indoor

2

-

-

... More
11 KV PIN Top Clamp

60

-

-

... More
HOLDING CLAMP

1391

-

-

... More
CLAMP FOR STP POLE

4

-

-

... More
F CLAMP WITH NUT BOLT

467

-

-

... More
DANGER BOARD AND CLAMP WITH NUT & BOLT

444

-

-

... More
PERCING Clamp

393

-

-

... More
DP CLAMP

14

-

-

... More
SUSPENSION CLAMP FOR LT ABC

322

-

-

... More
DEAD END CLAMP FOR LT ABC

146

-

-

... More
NUT & BOLT

1058

-

-

... More
J HOOK

311

-

-

... More
TF Clamps

16

-

-

... More
Dismantling and removing of old VCB inclusing carrige of dismentling material from sub station to store center

2

-

-

... More
Carrige of all dismantle material site/substation to store center BSR.

1

-

-

... More
Removing of old and damaged stp/pcc pole

-

-

-

... More
cutting of damaged stp pole through gas cutter

30

-

-

... More
removing damaged stp/pcc pole with help of hydra and carrying it to concerned substation

50

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.