Pashchimanchal Vidyut Vitran Nigam Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Pashchimanchal Vidyut Vitran Nigam Limited - PVVNL Tender

Works
Eprocure
Opening Date22 Nov 2024
Closing Date9 Dec 2024
Tender Amount₹ 8,65,000 
Notes
Download

Costs

Summary

Work Proposed Various Substation Existing Power Transformer Distribution Transformer And Tpmo Fuse Set Installation In Add Business Plan 2024 25

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
11 KV TPMO with POLYMERIC INSULATOR

8

-

-

... More
ACSR RABBIT CONDUCTOR

120

-

-

... More
LINE MATERIAL (Insulator, Disc, X-Arm, ANGLE, CHANNEL ETC.)

10

-

-

... More
Complete work of installing the electrical material received from the store center at the site.

-

-

-

... More
Safely Removing the 03 no. Power Transformer (01 no. 5 MVA + 2 no. 10 MVA) installed at 33/11 KV Ss Beghrajpur from the old plinth with the help of a crane and after completion work of the New Plinth, Reinstalling the Power Transformer as before. In which necessary decentralized material will be provide by the Contractor/Firm.

3

-

-

... More
Complete work of making a new plinth in place of the damaged plinth for the safety of 03 no. Power Transformer (01 no. 5 MVA + 2 no. 10 MVA) installed at 33/11 KV Sub-station Beghrajpur as per RESPO standards. In which cement, sand and other necessary decentralized material will be provide by the Contractor/Firm.

3

-

-

... More
Complete work of Pipe Earthing (upto Water Level) of Established 03 no. Power Transformer (01 no. 5 MVA + 2 no. 10 MVA) installed at 33/11 KV Sub-station Beghrajpur as per RESPO standards.

6

-

-

... More
Complete work Connection Related work of Established 03 no. Power Transformer (01 no. 5 MVA + 2 no. 10 MVA) installed at 33/11 KV Sub-station Beghrajpur (During Removal and Re-installation Process) as per RESPO standards.

3

-

-

... More
Complete work of Laying/Installing RABBIT CONDUCTOR on the Established electric poles installed as per RESPO norms. Including opening / dismantling of old / damaged conductor of the line

120

-

-

... More
Work of Fixing/Installing Double Pole of the PCC Pole installed at the site support with proper alignment & upto depth of one sixth of lenth of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disk insulator, angle channel etc. and decentralized material will be provide by the Contractor/Firm.

8

-

-

... More
Complete work of Pole concreting on established Double Pole / Single Pole as per RESPO standards. In which cement, sand and other necessary decentralized material will be provide by the Contractor/Firm.

16

-

-

... More
Complete work of Earthing completing by establishing earthing road of Stablished Double Pole/ Single Pole as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm.

16

-

-

... More
Complete work of Installing and Commissioning of 11 KV FUSE SET as per RESPO standards.

1

-

-

... More
Complete work of Installing and Commissioning of 11 KV TPMO on established Double Pole as per RESPO standards.

8

-

-

... More
Supply of NUT & BOLT ALL SIZE as per RESPO standards

20

-

-

... More
Supply of CLAMP with NUT & BOLT as per RESPO standards

64

-

-

... More
SUNDRIES ITEM

1

-

-

... More
As per rules, the work of delivering the old material includes loading and unloading on both sides from the site to Store Center Muzaffarnagar.

-

-

-

... More
WEASEL CONDUCTOR DAMAGE

35

-

-

... More
Tailless Fuse Unit Installation on 11/0.4 KV 100 KVA Distribution Transformer

-

-

-

... More
Complete Work of installation and commissioning of Tailless Fuse Unit. as per RESPO Standards with G.I./ MS Sheet Distribution Board Single Ckt, M S Angle Frame Complete in all Respect and all necessary other decentralized material will be provide by the Contractor/Firm.

6

-

-

... More
Supply of Incoming Stud for 250 Amp as per RESPO Standards

18

-

-

... More
Supply of Outgoing Stud for 250 Amp as per RESPO Standards

18

-

-

... More
Supply of Copper Fuse Strip 240x10x3 mm as per RESPO Standards

18

-

-

... More
Supply of Crimping Lugs as per RESPO Standards

36

-

-

... More
Supply of NUT & BOLTS as per RESPO Standards

6

-

-

... More
Tailless Fuse Unit Installation on 11/0.4 KV 160/250 KVA Distribution Transformer

-

-

-

... More
Complete Work of installation and commissioning of Tailless Fuse Unit. as per RESPO Standards with Marble Stone Distribution Board Double Ckt with M S Angle Frame Complete in all Respect and all necessary decentralized material will be provide by the Contractor/Firm.

2

-

-

... More
Supply of Incoming Stud for 400 Amp as per RESPO Standards

12

-

-

... More
Supply of Outgoing Stud for 400 Amp as per RESPO Standards

12

-

-

... More
Supply of Copper Bus Bar for Dist. Board Double Circuit as per RESPO Standards

6

-

-

... More
Supply of Copper Fuse Strip 240x10x3 mm as per RESPO Standards

12

-

-

... More
Supply of Crimping Lugs as per RESPO Standards

12

-

-

... More
Supply of NUT & BOLTS as per RESPO Standards

3

-

-

... More
Installing fuse with bakelite strip on 11 KV bushing of small capacity distribution transformers (All Decentralized material used in the work will be provide by the Contractor / Firm)

-

-

-

... More
25 KVA Distribution Transformers. A fuse set made of BACKLITE STRIP (Provide by Contractor / Firm) is to be installed on 03 no. 11 KV bushing. In which 11 KV dropper wire will first be connected to one end of the fuse set of 11 KV backlit strip, then the complete work of connecting 11 KV bushing rod through fuse wire of 40 SWG.

12

-

-

... More
63 KVA Distribution Transformers. A fuse set made of BACKLITE STRIP (Provide by Contractor / Firm) is to be installed on 03 no. 11 KV bushing. In which 11 KV dropper wire will first be connected to one end of the fuse set of 11 KV backlit strip, then the complete work of connecting 11 KV bushing rod through fuse wire of 38 SWG.

44

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.