Pashchimanchal Vidyut Vitran Nigam Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Pashchimanchal Vidyut Vitran Nigam Limited - PVVNL Tender

Works
Civil And Construction
Civil Works Others
Electrical and Electronics
Electrical Works
Eprocure
Opening Date11 Apr 2023
Closing Date18 Apr 2023
Tender Amount₹ 15,66,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
3. Supply for cable support Galvanised Structure i) Galvanised Channel (100x50x6)mm

136

-

-

... More
ii) Galvanised Angle (50x50x6)mm

20

-

-

... More
iii) G.I.Pipe 110mm Dia 2mm thickness 2Mtr long with G.I.Clamp.

4

-

-

... More
4. Supply of copper bus bar of size (2500x50x6)mm

6

-

-

... More
5. Supply for Water level earthing i) G.I. pipe size 40 mm inner dia & thickness 2mm

80

-

-

... More
ii) Solid copper cone Approx 225 mm long and 750 gm in weight

4

-

-

... More
iii) Copper wire 6 SWG

100

-

-

... More
iv) Copper flexible earthing strip of size 50x6mm for neutral

1.2

-

-

... More
6. Safe carriage of with loading & unloading at both ends respectively. (under jurisdiction of PVVNL) i) ACSR Dog Conductor

100

-

-

... More
ii) 11KV XLPE cable 3x300mm²

120

-

-

... More
7. Miscellaneous Civil works of Increasing Capacity of (i) increasing capacity of 33/11 KV Sub-Station KHATAULI TOWN and (ii) increasing capacity of 33/11 KV Sub-Station BUDHANA MOD KHATAULI (Muzaffarnagar) Construction of Plinth for 33/11KV T/F of (3.46x4.46x1.0)m 0.5 m above ground level) as per details:- i) Supply of 90 lbs rail pieces for T/F (44.64Kg/Mtrs.)

14

-

-

... More
ii) Supply & Erection of 1st Class brick work for side walls size 0.23 m wide upto 0.35 m height cm C.C. ratio of 1:4 (cement & fine sand)

2.56

-

-

... More
iii) Supply & Filling of brick ballast in plinth in ratio 1:4:8 (cement, coarse sand & brick ballast) with proper ramming. Size (3.0x4.0x0.65)m.

8.4

-

-

... More
iv) Supply & Erection of R.C.C. work on the top of plinth in ratio 1:2:4 in (3.46x4.46)m size and 0.20m in thickness by using M.S. Tor of 12 mm dia. 12 Nos. in each direction across to each other & M.S.Channel (125x65x6mm) 52Kgs. The work also includes cutting, bending of M.S. Tor etc.

6.16

-

-

... More
v) Supply & Erection of Quantity of M.S. Tor of size 12 mm dia required for reinforcement of plinth in R.C.C. work, work also includes cutting, winding and laying etc. in the T/F plinth.

480

-

-

... More
vi) Grouting of 02 Nos. 90/105 lb. Rail pieces of 3.46m long and (50x50x6)mm M.S. Angle in R.C.C. work at the top of plinth work also includes cutting of rail and angles pieces etc.

14

-

-

... More
vii) Supply & Erection of 12mm thick plaster with cement mortar ratio 1:4 (cement & fine sand) of plinth of 0.4m upper side.

36

-

-

... More
8. Hiring of D/G Set including carriage, loading, unloading & operating charges (with fuel) at 33/11 KV Substation under construction in case L.T. supply is not available near S/S within prescribed accessible limit. 63 KVA, Three phase, D/G Set for fabrication of different structure at Substation.

4

-

-

... More
Dismantling of Existing ( 5 MVA-1 Nos) Transformer Kept at suitable place outside switchyard

2

-

-

... More
i) Disconnecting HT cable connection from 33KV side & 11KV side of 05MVA Power transformer for removing power transformer from plinth after proper shutdown. Dismantling of 11KV cable support structure, copper bus bar structure, M.S.Frame etc.

2

-

-

... More
ii) Disconnecting copper flexible/Earthing strip from Power transformer neutral & Dismantling neutral earthing system to facilitate removal of Power transformer from plinth.

2

-

-

... More
iii) Disconnecting Earthing strip from body of 05MVA Power transformer.

2

-

-

... More
iv) Draining of transformer oil from conservator, radiators of existing 05 MVA T/F, at 33/11 KV S/S KHATAULI TOWN (Muzaffarnagar) into the dry & clean drums and stacking at the safe place in Substation outside of switchyard. Empty drums shall be provided by contractor.

2

-

-

... More
v) Removal of conservator, radiators and other accessories from existing 05 MVA Power transformer.

2

-

-

... More
vi) Safe Shifting of 05 MVA Power transformer main body and other accessories from the substation switchyard to outside the switchyard at suitable place assigned by concern J.E/S.D.O (Distribution).

2

-

-

... More
vii) Re-assembling of conservator, radiators and other accessories to existing 05 MVA Power transformer.

2

-

-

... More
viii) Re-filling the transformer oil (old & used in existing 5MVAT/F)

2

-

-

... More
10. Miscellaneous Electrical works of (i) increasing capacity of 33/11 KV Sub-Station KHATAULI TOWN and (ii) increasing capacity of 33/11 KV Sub-Station BUDHANA MOD KHATAULI (Muzaffarnagar) Installation of 33/11 KV, 10 MVA Transformer : i) Shifting of available 10 MVA 33/11 KV, Transformer to transformer plinth in Switch Yard.

2

-

-

... More
ii) Erection of shifted Transformer at plinth by fixing all accessories like radiators, conservator tank, filling the transformer oil to desired level and ensuring that there is no leakage, complete job in all respect.

2

-

-

... More
11. Water level earthing by Boring and lowering of G.I. pipe size 40 mm dia & thickness 2mm into the ground at 20 Mtr depth or upto the water level with the lower end of solid copper cone Approx 225 mm long and 750 gm in weight shall be provided and screwed in pipe as well as bringing out a continuous copper wire 6 SWG from the cone up to the ground surface where it will be bolted to the G.I. earth Strip for Transformer neutral connection, the earth strip will be welded to the G.I. pipe and neutral earthing support.

2

-

-

... More
12. i) Fabrication and erection of cable support made of two pieces of M.S. Channel (100x50x6)mm, 2.75 meter long, joined to each other by means of 5 Nos. M.S. Angle (50x50x6) mm pieces of size 0.75Mtr long each by welding at equal intervals and grouting in a block of size (300x1000x1000)mm in C.C. 1:3:6 complete with one coat of ready mixed primer and two coats of Al. paint. Work includes providing of three Nos. M.S. clamps made of (50x6)mm M.S. Flat for holding the cable including nuts and bolts with stone Pad of size (300x300x75mm).

2

-

-

... More
ii) Fixing 110mm dia 2mm thick 2M long G.I.Pipe over 11KV, 3x300Sq.mm XLPE Cable before mounting the 2No. Cable on cable support structure. Work includes fixing of Clamp, sealing of top and bottom end of the G.I.Pipe. One end of G.I.Pipe is to be buried under earth about 500mm.

4

-

-

... More
iii) Fabrication of copper bus bar of size (2500×50×6)mm in L.V. side of 10 MVA 33/11 KV, power transformer. Work includes connection of outside bus bar in L.V. side busing rod of Power Transformer and other side with outdoor 11 KV cable box as well as providing empire tape and H.T. tape etc. for proper insulation work.

6

-

-

... More
13. H.T. Power Cable Laying : i) Laying 11 KV, (3x300)/(3×185) mm2 XLPE Cable from power transformer to 11 KV incoming switch gear and 11 KV incoming switch gear to Double pole in the cable trench and 0.45 m wide, 0.90m depth. Providing 150 mm local sand for cushion beneath and 150 mm above the cable (quality of local sand required 0.375 cum/m in length). The cable shall be dully protected by brick. On both side of cable by laying brick vertically and bricks would also be laid bricks along the cable (minimum 18 Nos. of bricks are to be laid top and outer side along the single cable. The work includes digging of trenches, laying of cable in under ground trenches, joining of terminal's, back filling of earth and testing and commissioning of power cable etc. Spare cable shall be left over and laid in the trenches in shape of 6 m ring at both ends.

80

-

-

... More
ii) Laying and dressing of 11 KV (3x300)/(3×185) mm2 power cable in air/Trench.

40

-

-

... More
14. Preparation of 11 KV Power Cable ends: i) Making of cable end termination by Heat shrinkable Out door jointing kits suitable for 11KV, 3x300/3x185q.mm XLPE cable. Providing, fixing and crimping of proper size good quality lugs complete in all respect.

2

-

-

... More
ii) Making of cable end termination by Heat shrinkable indoor jointing kits suitable for 11KV, 3x300/3x185Sq.mm XLPE cable. Providing, fixing and crimping of proper size good quality lugs complete in all respect.

2

-

-

... More
15. Outdoor switchyard Earthing with 32 mm.size MS round Earth mat with Delta Earthing on power Transformer Nutral & 33 KV LA as per respo specification

2

-

-

... More
16. Testing & commissioning of Power T/F technicians with proper testing equipments during commissioning & energisation.

2

-

-

... More
17. Earthing of outdoor equipment, details as given below:- Cutting of 32mm.dia M.S. Bar-3Mtr.long and making one end in conical shape by forging process and driving it into the earth at each corner of bridge outside control room and proper welding with M.S.Bars.

2

-

-

... More
18. Digging of Pits for making delta by laying 32mm. dia M.S.Round in tringle shape. Electric welding on cross joints by providing “U” Clamp in size 25×6mm. of M.S.Flat, with over lap joint by providing M.S.Round-12mm dia, on both sides of over lap joints of M.S.Round, by electric welding. All joints shall be painted with black bituminious paint.

2

-

-

... More
19. Making earthing of 33KV LA, Neutral link structure, Power T/F body (both side) by providing G.I.Strip in size 50×6mm. with 32mm. dia M.S.Round laid in trench with proper electric welding.

2

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.