Pashchimanchal Vidyut Vitran Nigam Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Pashchimanchal Vidyut Vitran Nigam Limited - PVVNL Tender

Works
Civil And Construction
Civil Works Others
Electrical and Electronics
Pipe Line Project
Electrical Works
Eprocure
Opening Date20 Jul 2024
Closing Soon26 Dec 2024
Tender Amount₹ 5,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
P.C.C POLE 8.5 Mtr long.

70

-

-

... More
Carriage of All line Material from store to j.e store Sub station as ACSR Weasel conductor, ABC conductor GI Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Barbed Wire. Disc Insulator etc.

18

-

-

... More
Erection of Single support including complete fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work.

73

-

-

... More
Erection of duble pole support including complete fittings & with instulation T/F on D/P including the cost of labour, T&P and carrier etc. required for proper completion of work.

6

-

-

... More
Grouting of Single support shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of cement, sand, birck ballast/stone ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work.

40

-

-

... More
Carriage of All line Material from j.e store Sub station to pit Site as ACSR Weasel conductor, ABC conductor GI Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Barbed Wire. Disc Insulator etc.

18

-

-

... More
Laying, sagging. Stringing and binding and jumpering of ACSR Weasel conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T&P, carrier etc. requried for proper completion of work.

650

-

-

... More
fixing of Stay rod with Stay wire in proper way with Nozelling.

12

-

-

... More
Grouting of Stay rods .

12

-

-

... More
Resagging of loose and bad sag of L.T./H.T. line.

1600

-

-

... More
Chopping of Tree branches..

3

-

-

... More
Tightening of Stay

12

-

-

... More
Grouting of PCC/STP Pole Old

10

-

-

... More
Change of broken/Damaged/Missing following Items :-

-

-

-

... More
Pin Insulator

85

-

-

... More
Disc Insulator

65

-

-

... More
Bended X-Arm/Angle/Channel

85

-

-

... More
Ailment of PCC/STP Pole

12

-

-

... More
F Clamps

30

-

-

... More
Stay Clamps

12

-

-

... More
Stay Insulator

12

-

-

... More
Making of Plinth of the Damaged/Broken STP of the welded 03 Nos. Angle Iron piece with the Pole.

10

-

-

... More
Dismantling of ST/PCc Poles.

3

-

-

... More
Removal of ST/PCc Poles.

3

-

-

... More
Dismantling of 25KVA/63KVA Insulator from damaged double pole.

1

-

-

... More
Mounting of 25KVA/63KVA Transfoner or double pole.

1

-

-

... More
The folloing material is required to be supplied by the contractor. (a) Stay clamp.

-

-

-

... More
Stay insulator.

12

-

-

... More
F bracket

10

-

-

... More
X Arm Holding clamp.

38

-

-

... More
F Clamps.

35

-

-

... More
Bolt & nut off size.

45

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.