Pashchimanchal Vidyut Vitran Nigam Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Pashchimanchal Vidyut Vitran Nigam Limited - PVVNL Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date18 Nov 2024
Closing Soon27 Nov 2024
Tender Amount₹ 86,24,060
Costs
EMD
₹ 86,240Document Cost
₹ 3,540Tender Fee
Refer Documents
Summary
Work Of 11kv Line Strengthening Business Plan Scheme 2024-25 Part-2 In The Area Of Ee, Eudd-i, Eudd-iii, Eudd-v And Eudd-ix Ghaziabad. Under The Jurisdiction Of Se, Eudc-i, Ghaziabad.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PVVNL_974605_1Tender No
23/2024-25/EUDC-I/GZBTender Authority
Pashchimanchal Vidyut Vitran Nigam Limited ViewPurchaser Address
-Website
http://http://pvvnl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Carriage of HDPE Pipe 120 mm from Store center to various work site loading and unloading both side. distance 1 km to 50 km.
560
-
-
Carriage of 33 kvXLPE Cable 3x300 sqmm from Store center to various work site loading and unloading both side. distance 1 km to 50 km.
506
-
-
Carriage of GI Pipe 6" Dia from Store center to various work site loading and unloading both side. distance 1 km to 50 km.
148
-
-
Carriage of ST Pole 11 MTR Long SP-55 from Store center to various work site loading and unloading both side. distance 1 km to 50 km.
109
-
-
Carriage of ACSR Dog Conductor from Store center to various work site loading and unloading both side. distance 1 km to 50 km.
6982
-
-
Carriage of ACSR Weasel Conductor from Store center to various work site loading and unloading both side. distance 1 km to 50 km.
30
-
-
Carriage of line material as per site requirement:-Distribution Box 3 Phase - 7 Nos, 33 kv O/D Cable Box 3x300 sqmm-12 Nos, 11 kv O/D cable Jointing Kit 3x185 sqmm- 44 Nos, 11 kv I/D cable Jointing Kit 3x185 sqmm- 2 Nos ...etc.. from Store center to various work site loading and unloading both side. distance 1 km to 50 km.
1
-
-
Carriage of line material as per site requirement:-11KV Stay wire- 10 Kg, MS Angle for Bracing 65x65x6 MM- 2220 Kg, MS Channel 100x50 mm-1440 Kg, GI Wire 8 SWG-1200 Kg, GI Wire 10 SWG-300 Kg...etc.. from Store center to various work site loading and unloading both side. distance 1 km to 50 km.
1
-
-
Carriage of line material as per site requirement:-33 kv Polymeric Disc Insulator 70 KN- 18 Nos, 33 kv disc Fitting 70 KN- 18 Nos, 11KV Pin with Nut- 12 Nos, MS Top Channel Set- 2 Nos, MS Dropper- 8 Nos, 11KV Pin Insulator- 133 Nos, 11KV Disc Insulator-123, 11KV Pin with Nut- 85 Nos, 11KV Disc Fitting- 102 Nos, 11KV Stay Set- 50 Nos, 11KV V-Type Cross ARM- 18 Nos, MS Earthing Rod- 22 Nos, Earthing of Pole- 10 Nos, F Bracket- 10 Nos ...etc.. from Store center to various work site loading and unloading both side. distance 1 km to 50 km.
1
-
-
Dismantling of ABC 3x95 Scrap & Used carriage from work site to Store center/JE store loading and unloading both side.
712
-
-
Dismantling of Damage STP off Size carriage from work site to Store center/JE store loading and unloading both side.
3725
-
-
Dismantling of Damage ST Pole carriage from work site to Store center/JE store loading and unloading both side.
14
-
-
Dismantling of Damage Gater Pole carriage from work site to Store center/JE store loading and unloading both side.
7
-
-
Dismantling of Old & Used Dog Conductor Scrap carriage from work site to Store center/JE store loading and unloading both side.
408
-
-
Dismantling of Old & Used Rabbit Conductor Scrap carriage from work site to Store center/JE store loading and unloading both side.
1070
-
-
Erection of ST Pole 11 Mtr long long complete in all respect as per respo Norms.
109
-
-
Providing and Grounting/Concreting of Pole complete in all respect as per respo Norms.
109
-
-
Cable Laying 33 kv XLPE Cable 3x300 sqmm Trunchless/Drilling with HDPE Pipe 140 mm (HDPE Carriage from Store)- 266 Mtr and Loop riser…etc work- 240 Mtr under EUDD-V, work site complete in all respect as per RESPO norm.
506
-
-
After Laying 33 kv XLPE Cable 3x300 sqmm, Road Restoration for Pucca road Charges at work site.
30
-
-
Cable Laying 11 kvXLPE Cable 3x185 sqmm alongwith cost of Digging, Bricks, sand- 440 Mtr and Loop riser…etc work- 60 Mtr under EUDD-I, Govindpuram work site complete in all respect as per RESPO norm.
500
-
-
Cable Laying 11 kvXLPE Cable 3x185 sqmm Trunchless/Drilling with HDPE Pipe 120 mm (HDPE Carriage from Store)- 560 Mtr and Loop riser…etc work- 40 Mtr under EUDD-V, work site complete in all respect as per RESPO norm.
600
-
-
Cable Laying 11 kvXLPE Cable 3x185 sqmm Trunchless/Drilling with HDPE Pipe 140 mm (HDPE Carriage from Store)- 550 Mtr and Loop riser…etc work- 560 Mtr at various work site complete in all respect as per RESPO norm.
1110
-
-
After Laying 33 kv XLPE Cable 3x300 sqmm, Road Restoration for Pucca road Charges at work site.
90
-
-
Fixing/Installation line material as per site Requirement:- Distribution Box 3 Phase - 7 Nos, 33 kv O/D Cable Box 3x300 sqmm-12 Nos, 11 kv O/D cable Jointing Kit 3x185 sqmm- 44 Nos, 11 kv I/D cable Jointing Kit 3x185 sqmm- 2 Nos ...etc.. at work Site complete in all respect as per respo Norms.
1
-
-
Fixing/Installation line material as per site Requirement:- 11KV Stay wire- 10 Kg, MS Angle for Bracing 65x65x6 MM- 2220 Kg, MS Channel 100x50 mm-1440 Kg, GI Wire 8 SWG-1200 Kg, GI Wire 10 SWG-300 Kg ...etc.. at work Site complete in all respect as per respo Norms.
1
-
-
Fixing/Installation line material as per site Requirement:- 33 kv Polymeric Disc Insulator 70 KN- 18 Nos, 33 kv disc Fitting 70 KN- 18 Nos, 11KV Pin with Nut- 12 Nos, MS Top Channel Set- 2 Nos, MS Dropper- 8 Nos, 11KV Pin Insulator- 133 Nos, 11KV Disc Insulator-123, 11KV Pin with Nut- 85 Nos, 11KV Disc Fitting- 102 Nos, 11KV Stay Set- 50 Nos, 11KV V-Type Cross ARM- 18 Nos, MS Earthing Rod- 22 Nos, Earthing of Pole- 10 Nos, F Bracket- 10 Nos ...etc.. at work Site complete in all respect as per respo Norms.
1
-
-
Laying/Lifting/sagging of A. B. Cable LT. (3x120+1x195+1x16) complete in all respect as per respo Norms.
750
-
-
Laying/Lifting/sagging of ACSR Dog Conductor complete in all respect as per respo Norms.
6982
-
-
Laying/Lifting/sagging of ACSR Weasel Conductor complete in all respect as per respo Norms.
30
-
-
Fixing/Installation of GI Pipe 6" Dia at site complete in all respect as per respo Norms.
148
-
-
Supply & Fixing/Installation MS LT Clamp with Sackle insulator at various site complete in all respect as per respo Norms.
52
-
-
Supply, installation testing and commissioning of 11 kv, 1250 Amps, 25 KA vacuum/solid dielectric BIL 28KV/75 KV peak with magn, Current sensor/ transformer, voltage sensor/ transformer magnetic actuator mechanism Autorecloser with complete accessories with 100 fault recorder and 500 event recorder.
The Autorecloser shall be provided with a galvanized mounting frame for structure or pole mounting. It shall be of sufficient size to accommodate the addition of an auxiliary voltage transformer (Aux. VT) bracket in case it is fitted outside the substation.
The control cabinet shall include battery capable of providing 24 hours of operation upon loss of AC power. During this 24-hour period, the battery shall be capable of providing up to 10 open and close operations.
All necessary wiring and space for FRTU to be given with Autorecloser for future compatibility of SCADA system (supply of FRTU is not in scope). at various site complete in all respect as per respo Norms. (Makes: Authorized by UPPCL)
11
-
-
Supply & Fixing/Installation Holding Clamp at various site complete in all respect as per respo Norms.
411
-
-
Supply & Fixing/Installation Suspension Clamp at various site complete in all respect as per respo Norms.
31
-
-
Supply & Fixing/Installation J Hook at various site complete in all respect as per respo Norms.
31
-
-
Supply & Fixing/Installation Nut & Bolts Off Size at various site complete in all respect as per respo Norms.
492
-
-
Supply & Fixing/Installation Clamps with Nut & Bolts at various site complete in all respect as per respo Norms.
15
-
-
Supply & Painting Red Oxide Paint at various site complete in all respect as per respo Norms.
23
-
-
Supply & Painting Alluminium Paint at various site complete in all respect as per respo Norms.
23
-
-
Supply & Fixing/Installation Concreting of Stay at various site complete in all respect as per respo Norms.
2
-
-
Supply & Fixing/Installation 11KV Stay Clamp at various site complete in all respect as per respo Norms.
2
-
-
Supply & Fixing/Installation Stone Pad at various site complete in all respect as per respo Norms.
53
-
-
Supply & Fixing/Installation Number Plate With Clamp at various site complete in all respect as per respo Norms.
48
-
-
Supply & Fixing/Installation Danger Board With Clamp at various site complete in all respect as per respo Norms.
24
-
-
Supply & Fixing/Installation Aluminum Binding Wire at various site complete in all respect as per respo Norms.
35
-
-
Supply & Fixing/Installation Cross Arm Holding Clamps with Bolts & Nut at various site complete in all respect as per respo Norms.
8
-
-
Supply & Fixing/Installation Dead & Clamp (Stay Clamp) at various site complete in all respect as per respo Norms.
75
-
-
All other works complete in all respect as per estimate requirement.
28
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%