Pashchimanchal Vidyut Vitran Nigam Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Pashchimanchal Vidyut Vitran Nigam Limited - PVVNL Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date21 Dec 2024
Closing Soon27 Dec 2024
Tender Amount₹ 8,36,000
Costs
EMD
₹ 10,000Document Cost
₹ 1,180Tender Fee
Refer Documents
Summary
Increasing Capacity Of 33 Kv Ss Jaroda Panda In District Saharanpur
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PVVNL_985607_1Tender No
12/ECWC1/MRT/2024-25Tender Authority
Pashchimanchal Vidyut Vitran Nigam Limited ViewPurchaser Address
-Website
http://http://pvvnl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
iv) 33KV C.T. Ratio 400/200/1-1A
3
-
-
... More
v) ACSR Dog Conductor
50
-
-
... More
vi) Control cable 2×2.5 mm² Mtr.
100
-
-
... More
vii) Control cable 4×2.5 mm² Mtr.
100
-
-
... More
viii) 33 KV Post Insulators
6
-
-
... More
ix) MS Angle 65×65×6mm
230
-
-
... More
x) MS Angle 50×50×6mm
170
-
-
... More
xi) M.S. Round of 32 mm² for Delta Earthing
252
-
-
... More
xii) Jointing Kit XLPE 300 mm² indoor
1
-
-
... More
xiii) Jointing Kit XLPE 300 mm² Outdoor
1
-
-
... More
Hiring of D/G Set including carriage, loading, unloading & operating charges (with fuel) at 33/11 KV Substation under construction in case L.T. supply is not available near S/S within prescribed accessible limit.
63 KVA, Three phase, D/G Set for fabrication of different structure at Substation.
2
-
-
... More
Dismantling of Existing ( 5 MVA-1 Nos) Transformer Kept at suitable place outside switchyard
i) Disconnecting HT cable connection from 33KV side & 11KV side of 05MVA Power transformer for removing power transformer from plinth after proper shutdown. Dismantling of 11KV cable support structure, copper bus bar structure, M.S.Frame etc.
1
-
-
... More
ii) Disconnecting copper flexible/Earthing strip from Power transformer neutral & Dismantling neutral earthing system to facilitate removal of Power transformer from plinth.
1
-
-
... More
iii) Disconnecting Earthing strip from body of 05MVA Power transformer.
1
-
-
... More
iv) Draining of transformer oil from conservator, radiators of existing 05 MVA T/F, at 33/11 KV S/S, into the dry & clean drums and stacking at the safe place in Substation outside of switchyard. Empty drums shall be provided by contractor.
1
-
-
... More
v) Removal of conservator, radiators and other accessories from existing 05 MVA Power transformer.
1
-
-
... More
vi) Safe Shifting of 05 MVA Power transformer main body and other accessories from the substation switchyard to outside the switchyard at suitable place assigned by concern J.E/S.D.O (Distribution).
1
-
-
... More
vii) Re-assembling of conservator, radiators and other accessories to existing 05 MVA Power transformer.
1
-
-
... More
viii) Re-filling the transformer oil (old & used in existing 5MVAT/F)
1
-
-
... More
Miscellaneous Electrical works of Increasing Capacity of 33/11 KV Substation Jaroda Panda (Saharanpur) from (2×5) to (1×5+1×10) MVA Installation of 33/11 KV, 10 MVA Transformer : i) Shifting of available 10 MVA 33/11 KV, Transformer to transformer plinth in Switch Yard.
1
-
-
... More
ii) Erection of shifted Transformer at plinth by fixing all accessories like radiators, conservator tank, filling the transformer oil to desired level and ensuring that there is no leakage, complete job in all respect.
1
-
-
... More
Providing and Erection of Water level earthing by Boring and lowering of G.I. pipe size 40 mm dia & thickness 2mm into the ground at 20 Mtr depth or upto the water level with the lower end of solid copper cone Approx 225 mm long and 750 gm in weight shall be provided and screwed in pipe as well as bringing out a continuous copper wire 6 SWG from the cone up to the ground surface where it will be bolted to the G.I. earth Strip for Transformer neutral connection, the earth strip will be welded to the G.I. pipe and neutral earthing support.
2
-
-
... More
Fabrication and erection of cable support made of two pieces of M.S. Channel (100x50x6)mm, 2.75 meter long, joined to each other by means of 5 Nos. M.S. Angle (50x50x6) mm pieces of size 0.75Mtr long each by welding at equal intervals and grouting in a block of size (300x1000x1000)mm in C.C. 1:3:6 complete with one coat of ready mixed primer and two coats of Al. paint. Work includes providing of three Nos. M.S. clamps made of (50x6)mm M.S. Flat for holding the cable including nuts and bolts with stone Pad of size (300x300x75mm).
1
-
-
... More
Providing and Erection of Fabrication of copper bus bar of size (2500×50×6)mm in L.V. side of 10 MVA 33/11 KV, power transformer. Work includes connection of outside bus bar in L.V. side busing rod of Power Transformer and other side with outdoor 11 KV cable box as well as providing empire tape and H.T. tape etc. for proper insulation work.
3
-
-
... More
Fabrication and erection of neutral earthing L Type support made of M.S. Channel size 100×50mm. Structure shall be 4 Mtr. long with 1 Mtr. Arms. Structure shall be grouted in ratio 1:3:6 in block size 300×300×700mm and painted with one coat of Ready Mixed primer and Two coat of enamel Aluminium paint work includes connecting neutral bushing rod of power Transformer and M.S. Earthing strip with the help of flexible copper bond, M.S. Bolt and washer.
1
-
-
... More
Fabrication and grouting of M.S. frames 3.60 mt. long for support of copper Bus Bar. Bus Bar will be provided in L.V. Side of Power transformer. The M.S. frame shall be made of M.S. channel (100×50)mm in 'T' shape. Providing 2 Nos. support of M.S. Angle iron (50×50×6)mm, 0.60 mt. long below the top channel, drilling of 3 Nos. hole on the top channel for fixing of 11 KV pin insulator. The M.S. frame shall be painted with one coat of primer & two coat of aluminum paint and grouting the frame in C.C. ratio 1:3:6 in a block of size (300×300×700)mm. The work also includes the fixing of 3 Nos. 11 KV pin insulator with pin and binding the copper Bus Bar with the pin insulator by Aluminum binding wire in complete
1
-
-
... More
H.T. Power Cable Laying :
i) Laying 11 KV, (3x300)/(3×185) mm2 XLPE Cable from power transformer to 11 KV incoming switch gear and in the cable trench and 0.45 m wide, 0.90m depth. Providing 150 mm local sand for cushion beneath and 150 mm above the cable. The cable shall be dully protected by brick. On both side of cable by laying brick along the cable ............. The work includes digging of trenches, laying of cable in under ground trenches, joining of terminal's, back filling of earth and testing and commissioning of power cable etc.
30
-
-
... More
ii) Laying and dressing of 11 KV (3x300)/(3×185) mm2 power cable in air/Trench.
20
-
-
... More
iii) Providing and Erection of Fixing 150mm dia 2mm thick 2M long G.I.Pipe over 11KV, 3x300Sq.mm XLPE Cable before mounting the 2No. Cable on cable support structure. Work includes fixing of all Clamp.
1
-
-
... More
Preparation of 11 KV Power Cable ends:
i) Making of cable end termination by Heat shrinkable Out door jointing kits suitable for 11KV, 3x300/3x185q.mm XLPE cable. Providing, fixing and crimping of proper size good quality lugs complete in all respect.
1
-
-
... More
ii) Making of cable end termination by Heat shrinkable indoor jointing kits suitable for 11KV, 3x300/3x185Sq.mm XLPE cable. Providing, fixing and crimping of proper size good quality lugs complete in all respect.
1
-
-
... More
Testing & commissioning of Power T/F and all 33KV & 11KV switchgears / Panels. providing required No. of technicians with proper testing equipments during commissioning & energisation.
1
-
-
... More
Installation of 33 KV Lightening Arrestors ::-
Assembling and installation/mounting of 3 Nos. lighting arrestors on the L.A.'s structure/terminal gantry, complete with earthing and line connections. The work includes fabrication for proper fixing, if required.
1
-
-
... More
Installation of 33 KV Post Insulators : Installation of 3 Nos. PI on structure. The work includes fabrication for proper fixing, if required.
1
-
-
... More
Installation and commissioning of 33 KV C.T.'s :-
Installation of 3 Nos. C.T.'s on the C.T.'s structure. The work includes fabrication for proper fixing, if required to complete the work.
1
-
-
... More
Earthing of outdoor equipment, details as given below:-
Cutting of 32mm.dia M.S. Bar-3Mtr.long and making one end in conical shape by forging process and driving it into the earth at each corner of bridge outside control room and proper welding with M.S.Bars.
1
-
-
... More
Digging of Pits for making delta by laying 32mm. dia M.S.Round in tringle shape. Electric welding on cross joints by providing “U” Clamp in size 25×6mm. of M.S.Flat, with over lap joint by providing M.S.Round-12mm dia, on both sides of over lap joints of M.S.Round, by electric welding. All joints shall be painted with black bituminious paint.
1
-
-
... More
Earthing of 33KV LA, Neutral link structure, Power T/F body (both side) by providing G.I.Strip in size 50×6mm. with 32mm. dia M.S.Round laid in trench with proper electric welding.
1
-
-
... More
Control Cable Laying a) Laying of different size of (2×2.5)mm2 control cables i.e. from Buchholz realy to Marshalling box Marshalling box to switch gear room, 33 KV CT's to CT's CT 33 KV, V.C.B. Control Panel Junction Box to 33 KV VCB control panel and control panel to 33 KV VCB outdoor operating mechanism panel from T/F etc. in the cable trench including making proper connection at Buchholz Relay, Marshalling box as per required for installed equipment.
100
-
-
... More
b) Laying of different size of (4×2.5)mm2 control cables i.e. from Buchholz realy to Marshalling box Marshalling box to switch gear room, 33 KV CT's to CT's CT 33 KV, V.C.B. Control Panel Junction Box to 33 KV VCB control panel and control panel to 33 KV VCB outdoor operating mechanism panel from T/F etc. in the cable trench including making proper connection at Buchholz Relay, Marshalling box as per required for installed equipment.
100
-
-
... More
Repair of Plinth of Power T/F
1
-
-
... More
Dismentling and Cartage to Nearest PVVNL Store-Aluminium scrap.
30
-
-
... More
Dismentling and Cartage to Nearest PVVNL Store-M.S. Scrap CT/PT unit
700
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%