Panchayati Raj Department Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Panchayati Raj Department - PRD Tender
Civil Works Roads
Eprocure
Opening Date13 Mar 2020
Closing Date24 Mar 2020
Tender Amount₹ 11,00,000
Costs
EMD
₹ 22,000Document Cost
₹ 1,298Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_UPPRD_447182_15Bid Award Id
ViewTender No
2126 Dt 02-02-2020Tender Authority
Panchayati Raj Department ViewPurchaser Address
-Website
http://http://panchayatiraj.up.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:2:4 in Column excluding supply of reinforcement and its bending, but including its fixing and binding the same with 24 B.W.G.G.I. binding wire [SI No. 288]
3.85
-
8400
... More
R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:2:4 in beam excluding supply of reinforcement and its bending, but including its fixing and binding the same with 24 B.W.G.G.I. binding wire [SI No. 286]
8.64
-
8600
... More
Supplying, fitting, and placing M.S bar reinforcement in R.C.C. complete as per drawing and technical specifications Clauses 1002, 1010 and 1202
25.91
-
5209.04
... More
Brick masonry work in cement mortar (1:4) in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203
3.06
-
5589
... More
M-150 Class Brickwork in superstructure of mix 1:4 with cement and coarse sand. [Above Item No.5+SI No.309 of UPPWD Schedule]
20.97
-
5899
... More
Providing and laying flamed finish Granite stone in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 Cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade i/c rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge : Flamed Finish granite stone slab Jet Black, Cherry Red, Elite Brown, Cat Eye or equivalent. [DSR 2016, Item No. 8.12]
106.46
-
2887.85
... More
Plastering with cement mortar (1:4), 12 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204
6.72
-
153.1
... More
Stainless Steel Lettering over top of gate elevation with boarder etc. complete.
1680
-
122.5
... More
S/F sodium vapour luminaries single piece Al. body flat glass suitable for 250 watt H.P.S.V. Lamp with required arrangement for focusing the light etc. for proper completion of the work.
2
-
7100
... More
P/F High Luminous LED Lights for Proper Light Arrangement i/c all Material, labour, T&P etc. all complete.
5
-
1850
... More
Supply & Fixing of Sign Board at Site.
1
-
5000
Evaluation Notes How It Works ?