If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Panchayati Raj Department - PRD Tender
Civil And Construction
Eprocure
Opening Date12 Dec 2018
Closing Date26 Dec 2018
Tender Amount₹ 7,92,930
Costs
EMD
₹ 15,859Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_UPPRD_282045_33Bid Award Id
ViewTender No
413/2018Tender Authority
Panchayati Raj Department ViewPurchaser Address
-Website
http://http://panchayatiraj.up.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
NAYAGANJ AIHAR JAKHIYA SAMPARK MARG SE PRIMARY SCHOOL JAKHIYA TAK CC KARYA
BOQ Items
... More
Providing and laying Cement Concrete 1:6:12 (1Cement:6 fine sand: 12 graded brick aggregate 40mm nominal size) and curing complete,including cost for formwork in foundation and floors.(P.W.D.SI.No-273)
5.4
14850
2750
... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.
27.17
103417
3806.3
... More
Providing,laying,spreading and compacting stoneaggregates of specific sizes to WBM specification including spreadingin uniform thickness,handpacking,rollingwithsmooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming,stonescreening to fill-up the interstices of coarse aggregate, watering and compacting to theRequired densityGrading-3asPerTechnicalSpecification Clause 405.
27.17
125077
4603.5
... More
Class-150 Brick work in 1:4 Cement and Fine sand of 1.25 F.M.morter in foundation and plinth including supply of all materials,labour and tools for proper completion of the work.(P.W.D.SI.No-305a)
14.9
66603
4470
... More
Laying C.C.Road slab 100 mm thick consisting of 1:2:4 Cement, coarse sand & approved 20 mm gauge stone ballast. Over prepared sub grade after its rectifications & bringing it to proper camber&including supply of all meterials,labour& T&P etc.required for proper completion of work.(P.W.D.SI.No-773a)
62.62
425816
6800
... More
Providing & Laying of 125mm Micron Polyethene Sheet in Between Base Concrete & Road Slab.
415.2
16192
39
... More
Making Construction Joint, Filling with Joint Filler Board
41.52
1619
39
... More
12 mm thick Plaster with cement mortar in proportion of 1:4 cement & fine sand of 1.25 F.M. morter.(P.W.D.SI.No-584)
36
4680
130
... More
Earthwork in cutting or in embankment in ordinary soil,excavation to be in the from of regular pits not exceeding1/2metre in depth and earthwork in embankment to be in 20cm Layers including ramming and dressing the surface to required levels and slopes and also including 1.5 metre lift and 30m lead.(P.W.D.SI.No-253)
55.44
5266
95
... More
Laying and Jointing PVC Pipe. Heading
-
-
-
... More
Shifting of material
54.34
5472
100.7
... More
Consumpation of Bricks for Extra Cost
6855.84
2399
0.35
... More
S/F Of Sign Board & Photo
1
5000
5000