Orai Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Orai Development Authority Tender
Building Construction
Eprocure
Opening Date31 Aug 2019
Closing Date11 Sep 2019
Tender Amount₹ 4,78,286
Costs
EMD
₹ 48,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_ODAUP_376381_1Bid Award Id
ViewTender No
ODA/2019-20/03/455Tender Authority
Orai Development Authority ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Earth work in cutting or in filling in ordinary soil, excavation to be in the form of regular pits not exceeding 1/2 meter (20") in depth and earthwork in embankment to be in 20 cm(8") layers, including ramming & dressing the surface to reqired levels and slopes and also including 1.5 meter (5fts) lifts and 30 m. (100) lead. The earth from cutting to be used in making filling or to be deposited as spoil banks within 30 meters (100 fts) distance as directed by Engineer-in-charge (Rate is Including Royality) sl 253+ 231(a)
29.58
6537
221
... More
R.C.C work with cement approved coarse sand and 2 cm. (3/4") gauge approved stone ballast in the proportion of 1:1.5:3 in the lighter beams having span above 6 m. excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I binding wire and including supply of all materials, labour & t&p etc. required for proper completion of the work. Binding wire cost being included in the item. S.I. No. 285(i)
1.95
16331
8375
... More
R.C.C work with cement approved sand and 2 cm.(3/4") gauge approved stone ballast in the proportion of 1:1.5:3 in R.C.C beam and slab roofs and R.C.C columns excluding supply of reinforcement and its binding but including its flixing and binding the same with 24 B.W.G.G.I binding wire and including necessary centering and shuttering etc. and also including supply of all materials,labour& T&P etc.but in R.C.C beam and slab roofs and R.C.C columns. S.I. No. 288(1)
4.49
41828
9316
... More
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage & overlapping & hooks. S.I. No. 504.
13.98
79210
5666
... More
Supply and laying one layer of tar felt or any other equivalent approved material of the junction of wall and roof as per direction of E/I including necessary overlap, giving a coat of approved mastic paint below the Tar felt and including supply of all materials, labour and tools and pants etc, required for proper completion of the work fix as per standard….item 544
30.24
7469
247
... More
Sand filling in plinth including supply of distance not exceeding 8 km.(5 miles) from the site of work and including watering, dressing etc. Rate to include cost of all materials, labour and T&P etc. Required for proper completion of the work. (Rate is including Royality).sl 255
2.56
4216
1647
... More
Concrete with 4cm(1.5") gauge brick ballast fine local sand of 1.25 Fineness modulous and cement in Proportion of 1:4:8 in foundation and under floors incliding supply of all materials labour and T&P etc. Required for proper completion of the work. S.I. No 275.
3.84
20052
5222
... More
P/L(white/colour) kajaria tiles, ramano tiles flooring over 20 mm(av.) thick base of cement morter 1:4:(1 cment :4 coarse sand) laid and jointed with white cement (with pigment) slurry including rubbing and polishing complete. S.I. no. Next to 628 (page 43)
41.83
60820
1454
... More
12 mm Cement plaster in single coat on fair side if single or half brick wall for interior plasting upto floor two level including internal rounding angles chamfers, and/or rounded angles not exceeeding 80 mm in grith and finished even and smooth No extra for mixing any additive.
(iii) 1 cement: 6 fine sand
S.I. No 17.58
29.02
3772
130
... More
Providing & applying of wall putty 2 mm thick I/C all as per PWD SOR 2013 page 47
121.01
21176
175
... More
finishing walls with water proofing cement paint of approved make and quality on new m work with two coat to give to give an even shade. Including supply of all matericals, labour and T&P etc. Required for proper completion of the work. same as in item no. 660 but for each coat of water proof cement paint after the first coat to give an even shade.(51.30+18.80= 70.10) S.I. No. 660 + 661 same as quantity of wall putty
121.01
8482
70.1
... More
Providing & fixing of stainless steel CHAIRS / BENCH I/C all COMPLETE
5
45000
9000
... More
p/f side railing ss grade 304 made of hallow tube 1
126
78044
619.4
... More
Painting & lettering of information I/c all complete
1
1000
1000