Orai Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Orai Development Authority Tender

Works
Building Construction
Eprocure
Opening Date4 Jun 2019
Closing Date10 Jun 2019
Tender Amount₹ 4,78,286 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work in cutting or in filling in ordinary soil, excavation to be in the form of regular pits not exceeding 1/2 meter (20") in depth and earthwork in embankment to be in 20 cm(8") layers, including ramming & dressing the surface to reqired levels and slopes and also including 1.5 meter (5fts) lifts and 30 m. (100) lead. The earth from cutting to be used in making filling or to be deposited as spoil banks within 30 meters (100 fts) distance as directed by Engineer-in-charge (Rate is Including Royality) sl 253+ 231(a)

29.58

-

221

... More
R.C.C work with cement approved coarse sand and 2 cm. (3/4") gauge approved stone ballast in the proportion of 1:1.5:3 in the lighter beams having span above 6 m. excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I binding wire and including supply of all materials, labour & t&p etc. required for proper completion of the work. Binding wire cost being included in the item. S.I. No. 285(i)

1.95

-

8375

... More
R.C.C work with cement approved sand and 2 cm.(3/4") gauge approved stone ballast in the proportion of 1:1.5:3 in R.C.C beam and slab roofs and R.C.C columns excluding supply of reinforcement and its binding but including its flixing and binding the same with 24 B.W.G.G.I binding wire and including necessary centering and shuttering etc. and also including supply of all materials,labour& T&P etc.but in R.C.C beam and slab roofs and R.C.C columns. S.I. No. 288(1)

4.49

-

9316

... More
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage & overlapping & hooks. S.I. No. 504.

13.98

-

5666

... More
Supply and laying one layer of tar felt or any other equivalent approved material of the junction of wall and roof as per direction of E/I including necessary overlap, giving a coat of approved mastic paint below the Tar felt and including supply of all materials, labour and tools and pants etc, required for proper completion of the work fix as per standard….item 544

30.24

-

247

... More
Sand filling in plinth including supply of distance not exceeding 8 km.(5 miles) from the site of work and including watering, dressing etc. Rate to include cost of all materials, labour and T&P etc. Required for proper completion of the work. (Rate is including Royality).sl 255

2.56

-

1647

... More
Concrete with 4cm(1.5") gauge brick ballast fine local sand of 1.25 Fineness modulous and cement in Proportion of 1:4:8 in foundation and under floors incliding supply of all materials labour and T&P etc. Required for proper completion of the work. S.I. No 275.

3.84

-

5222

... More
P/L(white/colour) kajaria tiles, ramano tiles flooring over 20 mm(av.) thick base of cement morter 1:4:(1 cment :4 coarse sand) laid and jointed with white cement (with pigment) slurry including rubbing and polishing complete. S.I. no. Next to 628 (page 43)

41.83

-

1454

... More
12 mm Cement plaster in single coat on fair side if single or half brick wall for interior plasting upto floor two level including internal rounding angles chamfers, and/or rounded angles not exceeeding 80 mm in grith and finished even and smooth No extra for mixing any additive. (iii) 1 cement: 6 fine sand S.I. No 17.58

29.02

-

130

... More
Providing & applying of wall putty 2 mm thick I/C all as per PWD SOR 2013 page 47

121.01

-

175

... More
finishing walls with water proofing cement paint of approved make and quality on new m work with two coat to give to give an even shade. Including supply of all matericals, labour and T&P etc. Required for proper completion of the work. same as in item no. 660 but for each coat of water proof cement paint after the first coat to give an even shade.(51.30+18.80= 70.10) S.I. No. 660 + 661 same as quantity of wall putty

121.01

-

70.1

... More
Providing & fixing of stainless steel CHAIRS / BENCH I/C all COMPLETE

5

-

9000

... More
p/f side railing ss grade 304 made of hallow tube 1

126

-

619.4

... More
Painting & lettering of information I/c all complete

1

-

1000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.