Orai Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Orai Development Authority Tender
Eprocure
Opening Date11 Nov 2019
Closing Date19 Nov 2019
Tender Amount₹ 13,60,000
Costs
EMD
₹ 1,36,000Document Cost
₹ 1,180Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_ODAUP_401446_1Bid Award Id
ViewTender No
2019-20/ODA/01/581Tender Authority
Orai Development Authority ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend, hooks, and authorized overlapping shall be measured and including cost of binding wire. PWD SOR 504/2018
13
-
5566
... More
Class-150 brick work in 1:3 cement and coars sand mortar in Super structure including supply of all materials, labour and tools and plants etc. required for proper completion of the work. PWD SOR 307/2018
10.5
-
5348
... More
P/L cement concrete 1:2:4 in cement coarse sand and 4cm gauge stone grit including supply of all materials, labour, tools & plants etc. required for proper completion of the work. PWD SOR 279/2018
2.5
-
5560
... More
12cm thick plaster with cement and approved coarse sand mortar in 1:3 over brick work minimum thickness not to be less than 1 cm. including supply of all materials, labour, tools & plants etc. required for proper completion of the work. PWD SOR 17.58(1)/2018
160
-
171
... More
Stone work (machine cut edges) for wall lining etc. (veneer work) upto 10 metre height, backing filled with a grout of average 12 mm thick cement mortar 1:3 (1 cement : 3 coarse sand) including pointing in white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade : (To be secured to the backing and the sides by means of cramps and pins which shall be paid for separately) : Red sand stone - Exposed face machine cut and table rubbed with rough backing. 50 mm thick. DSR 7.23.2.3/2016
131
-
3537.1
... More
Providing and fixing stone jali 40 mm thick throughout in cement mortar 1:3 (1 cement : 3 coarse sand), including pointing in white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment, matching the stone shade, jali slab without any chamfers etc. Red sand stone. DSR 7.33.1.3/2016
88
-
6560.75
... More
Finishing walls with water proofing cement paint of approved make and quality on new work with two coat to give an even shade. Including supply of all material, labour and T&P etc. requred for proper completion of the work. PWD SOR 660/2018
64
-
51.3
... More
Earth work in cutting or in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 M. in depth and earth work in embankment to be in 20 cm. layers including remming and dressing the surface to required levels and slopes and also including 1.50 M. lift be used in making embankment or to be deposited as spoil blanks with in 30 M. including 5.00 Km cartage complete as directed by the Engineer incharge. Including Royality. PWD SOR 253/2018
(126+173=269)
240
-
126
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements