Northern Coalfields Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Northern Coalfields Limited - NCL Tender
Civil And Construction
Pipe Line Project
Eprocure
Opening Date22 Jul 2024
Closing Date12 Aug 2024
Tender Amount₹ 75,69,504
Costs
EMD
₹ 94,700Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_NCL_313174_1Bid Award Id
ViewTender No
B/Civil/2024-25/ETN-10 dtd 22.07.2024Tender Authority
Northern Coalfields Limited ViewPurchaser Address
-Website
http://http://nclcil.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Operation of pump system and regulating necessary controlling valves provided in the pipelines , sprinkling system including routine maintenance and repairing of pipelines, valves of all sizes by deploying necessary man powers as required including T & P etc. all complete as per instruction of EIC.manpower Fitter: one nos per day, valveman: 3 nos per day gaurd: one nos per day(Night shift)
730
2475853
3391.58
Providing and fixing C.I. sluice valves (with cap) complete with bolts, nuts, rubber insertions etc. (the tail pieces if required will be paid separately) : 150 mm diameter Class I
4
20232
5058
Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) : 80 mm nominal bore
8
15470
1933.85
Providing and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc. External work 50 mm dia nominal bore
40
22548
563.7
Earth work in excavation in all kind of soil/ silt by mechanical means (hydraulic excavaror)/ manual means including dozering, trasnportation, unloading at designated place, levelling and dressing of dump sites all inclusive as per instructions of EIC. with all lifts (for all project of NCL) Lead 50 M
645
18814
29.17
CONCRETE WORK Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size).
39
210715
5402.95
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size).
154
1063878
6908.3
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size).
26
211835
8147.5
Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns, etc. for mass concrete
82
17876
218
Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
833
399506
479.6
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars
14400
1458000
101.25
U-PVC pipes (working pressure 4kg/cm² ) Single socketed pipe 110 mm dia
57
7410
130
EARTH WORK Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
286
48691
170.25
Total impact of GST for the purpose of CTC
1
-
-