Northern Coalfields Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Northern Coalfields Limited - NCL Tender

Works
Civil And Construction
Pipe Line Project
Eprocure
Opening Date20 Nov 2024
Closing Date6 Dec 2024
Tender Amount₹ 47,07,199 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Notice inviting tender, Instructions to bidders, Conditions of contract and Annexures
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.

115

104

11983

... More
Providing and fixing bolts including nuts and washers complete.

80

108

8704

... More
REINFORCED CEMENT CONCRETE :- Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :- 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).

1

6908

6908.3

... More
Centering and shuttering including strutting, propping etc. and removal of form for :- Foundations, footings, bases of columns, etc. for mass concrete

4

218

872

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level :- Mild steel and Medium Tensile steel bars

84

101

8505

... More
Daily operation of all valves daily for two years including petrolling of CI & MS pipeline from Singrauli to Gorbi pipeline and submission of water supply report to IWSS daily and involvement of 3 No's labour per day (1 No. Skilled & 2 No. Un-Skilled labour) for replacement of sluice valves, gasket upto 200 mm. dia and rubberised wooden balls of air release valves, (labour rates only) including opening, tightening of nuts & bolts, gland packing and other site job required for opening and replacing of pipeline. The deduction will be made at double rate incase of non /less deployement of required man power (prorita basis)

730

1954

1427004

... More
Supply of materials at site. (a) 3 mm thick gasket

40

242

9714.8

... More
Supply of materials at site. (b) Gland packing etc.

20

209

4181.4

... More
Supply of materials at site. (c) Wooden ball 75 mm dia.3"

80

592

47389.6

... More
Welding of M.S. pipeline of various dia with suitable peripheri (4 Ways) including the cost of oxygen,DA cylinders, grinding stones, wire brush, hand gloves, generator, welding machines, disel pump transportation etc. all complete

25

2449

61239.5

... More
Deployment of required workforce for the work of changing old gasket and replacing of wornout Nuts & bolts, cleaning & fixing of flange of pipeline/valves including cleaning of sludge in valve chamber if necessary all complete as per direction of EIC.

4

5710

22842.52

... More
Cost of diesel pump and motor transportation/ carriage etc. (Hiring charge).

20

829

16586.2

... More
Running cost i.e. cost of diesel charge

120

142

17085.6

... More
Laying of M.S. Pipe 300 mm dia including alignment, making bend as per requirement etc all complete as per instruction of EIC.

30

653

19593

... More
Providing / daily engaging /Hiring of vehicle : Four wheeler fibre body covered, diesel jeep 'Bolero' model Or equivalent vehicle, on hire charge basis for 12 hours for regular basis for two years, new vehicle not more than three years old from registration date of UP state only with taxi permit (commercial registration) and suitable to operate/run mostly in MP and UP state, for use of 12 hours per day for official work purposes, with driver holding valid driving licence & with applicable of following terms & conditions.The rate includes all types of taxes /charges of insurance and lubricants, mobile oil , other maintenance charge etc as required for vehicle operation including wages of drivers as per labour laws. Contractor should posseses Vehical registration card (RC), Fitness certificate, Valid taxi permit, Valid first party comprehensive insurance, Polution clearance certificate, Valid driving licence of driver, noterised affidevit indicating non involvement of the contractor in any criminal case Hiring of vehicle inclusive of driver For jeep plying generally outside mines for 12 hours per day use (With A.C.). Note: Recovery at double the rate i.e. at the rate Rs 2640 per day shall be made for non reporting of vehicle for any day.

730

1320

963600

... More
Cost of diesel For ave. daily running of 100km/day at an average diesel consumption of 12 km/lit for total contract on submission of log-book of vehical.Note: on basis of actual total kilometer running of vehicle as per authenticated logbook in each calender month.

73000

7

577430

... More
Cost of toll /Entry Tax etc For movement of vehicle from UP to MP state entry.Entry tax for 365 days i.e. for 365 days Or limited as per actual entry days as per documentary evidence.

365

300

109500

... More
Total impact of GST for the purpose of CTC

1

718047

718047.19



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.