North Central Railway Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
North Central Railway - NCR Tender
Civil And Construction
Consultancy Services
Civil And Architectural Services
Ireps
Opening Date23 Dec 2024
Closing Date15 Jan 2025
Tender Amount₹ 18,02,881.15
Costs
EMD
₹ 36,100Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Final Location Survey For Connectivity Between Kasganj-mathura Route Of Ner & Hathras Jn-hathras Qilah Route Of Ncr (3 Km), Kanpur Central To Anwarganj Doubling (3 Km) And Bhimsen To New Bhimsen Doubling (4km) Under Dy.ce/construction /kanpur In Prayagraj Division Of North Central Railway".
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
CNB2024202515-DYCE-C-CNB-ENGINEERING/NORTH CENTRAL RLYTender No
CNB2024202515Tender Authority
North Central Railway ViewPurchaser Address
-Website
http://ireps.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Extra for revision/ modification in L-sections/ plans requiring after approval of 04 competent authority and submission of another tracing for approval. Six (06) ammonia/ white copies of each sheet and soft copy in CD/Pen drive to be submitted after final approval by comptent authorities of Railways.
6
1484
8908.56
... More
Preparation submission and approval of General map to scale of 25Km to 1cm. Index map to a scale of 2.5Km to 1cm and detail Index plan & section in autocad as per para 449, 450 & 05 451 of Engg. Code with complete details as directed by Engineer in charge to scale of 0.5Km to 1cm. in horizontal and 10m. to 1cm vertical. Note: (1) The above item will be executed only after approval of L-section sheets. 2) The contractor will supply original tracing of approved quality and 6 ferro copies and soft copy on CD in Auto Cad.
12
2475
29700.36
... More
Drilling holes of 100-150 mm diameter in all type of soil (sand, silt or clay ) by mechnical method to the various depths up to 30 m or up to refusal strata (refusal means when SPT/number of blows will be more than 50 for 30 cm of pentration) whichever is earlier including (a) conduction of standard Penetration tests in the bore holes at regular intervals of 1.5 mtr. (b) Collection of disturbed and undisturbed soil samples from the bore holes at regular intervals. (c ) 06 Recording of water table if met within the depth drilled. (d) conductiing all the necessary laboratory tests on the samples collected to determine Engineering properties of soil in order to analyze the bearing capacity, undrained cohesion of soil, details for foundation at various levels etc and (e) Preparation and submission of geotechnical report (in four copies) recommending the type of foundation and the safe bearing pressure of soil, as per relevent BIS code, including testing plant accessories and other site test equipments and personnel etc. Note: Soil samples taken at site shall be submitted in wooden boxes arranging the same in chronological order for record of the railway.
520
838
436269.6
... More
Drilling 85 mm dia bore holes with Nxbit through 100/150 mm dia. holes to a 07 maximum depth of 4 m below the depth of item No. (a) above in all types of soil and rock strata and cleaning the bore by collecting disturbed undisturbed samples, collection of Rock sample with its RQD values. This is also including conductiong unconfined compressive strenth test at selected rock specimen.
31
1103
34197.34
... More
Preparation of ESPs of various stations on Auto CAD as per requirement of Railways showing existing & proposed position of tracks and related structures ( based on concept plans) & 08 submission on one advance copy on white paper and further one copy on tracing after incorporating suggested corrections for approval for stations. Note: The colour scheme to be followed in the drawing shall be as per standard practice of North Central Railway or as per the direction of Engineer in charge.
7
6174
43222.55
... More
Extra for revision/ modification in ESPS requiring after approval of competent authority and submission of another tracing for approval. Six (06) ammonia / white copies of each yard and soft copy in CD/Pen Drive to be submitted after final approval by competent authorities of Railways.
-
-
9
... More
Preparation of existing & proposed layout plan along with detailed structural drawings ( If Type plans are not available) good for execution of Station buildings, quarters & structures of the 10 stations en-route on AutoCAD and submission of print on white paper and tracing for approval of Railways. Proposed layout plan for stations should indicate proposed service building like Relay room, equipment room, battery room, ESM cum data-logger room etc. Raiways type plans of buildings and structures shall be used in general.
20
6860
137217.2
... More
Preparation and submission of existing & proposed layout and detailed working plan 11 of level crossings including goomties as per IRPWM on Auto CAD and submission of print on white paper and tracing for approval. Six ammonia/white copies of each yard and soft copy in CD/Pen drive to be submitted after final approval by Railways.
5
2123
10615.6
... More
Site selection for Major and Important bridges including levelling for profile of stream 12 bed, leveling of 1.5km bed on up stream and down stream side traversing for catchments area of the stream, Collection of hydrological data. Hydrological calulations for deciding water way of bridges and preparation of GAD plan for bridges etc. complete.
4
12444
49777.6
... More
Preparation and submission of GAD-cum-design, drawing of Minor Bridges indicating details of proposed Bridges to suit 25 Ton loading -2008 including details of sub structure/foundation abutment/ pier wing and return considering waterway of existing bridge. The rate includes preparing 13 general arrangement drawing, detailed structural working drawing, getting the Railways approval and submitting approved drawing on tracing paper of A0/A1 size (as per direction of Engineer in charge) along with six ammonia prints. Submission of design calculation in 3 (three) copies properly binded for each bridge and also on CD /Pen Drive and schedule of quantities for minor bridges as per requirement of Engineer in charge. Cost of all labour, material tools & plants and machinery is included in the rate.
18
6204
111686.58
... More
Conducting feasibility study for construction of LHS/Sub-way/RUB in lieu of level 14 crossings manned and unmanned in the section and preparation of General arrangement drawing cum detailed design drawing for RUB in lieu of level crossing as per 25T loading standard and getting final approval of Railways complete.
7
7326
51288.65
... More
Making trial pits of 1.20m x 1,20m at suitable depth making out detailed bore log chart dearly specifying the type of soil strata and approximate bearing capacity in all type of soil with contractor's own tools & consumable etc inclusive of all lead and lift complete.
41
134
5526.39
... More
Finding out utility sevices along the proposed alignment such as eletrical lines, poles, 16 telephone lines, high tension line, alongwith there voltage and sag hight, OFC cables, existing RE cables, Quad cables, retaining walls, trees, pipe line for water, petrol or gas etc. including preparation of kilometre wise plan showing all utility services which needs to be shift before construction etc. complete
10
4232
42328.3
... More
Preparation of land plans using plane Table/Total Station along the proposed alignment for identification & measurement of land to be acquired and properties lying in the 17 proposed land, required for superimposition of revenue record, It also includes collecting details such as owner of land and property, type of structure, number of floors, land use pattern such as agriculture, commercial, barren, forest etc., and collection of all necessary revenue survey maps required for preparation of land acquisition proposals.
10
8865
88650.2
... More
Site survey & preparation of GADs for proposed ROBs/RUBs in lieu of level xings showing all important features such as existing Railway track, existing structures in the vicnity, site survey upto distance of 500 metres on either side from centre line of level xing and its connectivity to District /State Highway /National Highway, Ground water level HFL as directed by Engineer-in-charge 18 and submission of coloured print on paper for proof checking along with final coloured print on good quality tracing paper and soft copy of GAD. The work also includes showing sites of proposed R0B/RUB and diversion in the GAD as per instruction of Railway officials. The rate includes all expenses of Man and Material including toll tax & Govt taxes as applicable and nothing extra shall be paid. NOTE - Railway reserve the right to increase/ decrease number of copies of GAD as per requirement.
6
12923
77539.62
... More
"Work of Drone Orthophoto generation as per new railway guidelines for new line /doubling work under Dy. CE/C/CNB. NOTE A- Methology:- Drone will fly on the alignment, preparing a 19 orthophotos which are ortho rectified and geomentrically corrected. B- Delivery:- a- Raw images (jpgformate) (2cm GSD), b- Final scaled and Geopositioned orthophoto tiles in geotiff format for each 500mm of 2 cm resolution and reampled at 5cm GSD. c- Final scaled & Geopositioned orthotiles in jpg & amp sid compressed formate of 2 cm resolution and resampled at 5 cm GSD. d- Final scale and Geopositioned orthormoslac in jpg & amp Sid format for each 5 km. e- Map file comparible to CAD/GIS in shp format duly linked with attfibutes of assets. f- Quality control report for positional Accuracy Assessement Conditions to be placed for at least 5 well defined assests in 1 km length from/google and same to be measured on the orthophoto for co-ordinate comparison. "
10
11991
119916
... More
Conducting hydrological investigation including detailed calculation for minor bridges using DEM (digital elevation model) Geological information system Tasks (i) marking of all bridges locations on index plan of the alignment. (ii)delineating the catchment boundary of bridges from DEM and calculating physiographic parameters of the catchment-area longest stream, slope iii Calculating design discharge(Q50) for all bridges based on RBF 16/RBF 22 reports forsmall catchments and synthetic unit hydrograph from flood estimation report for large catchments (> 25 sq.km) iv consultant will verify if there are any dams/waterstorage structures in the catchment and obtain regulated flow discharge from concerned authority for calculation of design discharge.v. checking of 20 adequacy of proposed linear waterway,vertical clearance, free boardand depth of foundation. Soil investigation report for scour depth calculations will beprovided to the consultant.Deliverables i. 3 copies of report with bridge wise hydrological calculation sshould be submitted. Separate booklets should be prepared for major and minor bridges.ii. For each bridges,calculations and catchment plan with longest stream marked on Survey of India topo sheet should be submitted. For bridges with large catchment unit hydrograph and calculation of equivalent slope should also be submitted. iii. Catchment plan should be marked on 50year 24 hr rainfall map to verify correctness of rain fall data used and the same and the same submitted in the booklet. iv. The following are required to be submitted as soft copy-calculation spread sheets, Google EarthKML files of catchment plans, longest stream, alignment and bridges location.
18
1737
31282.2
... More
Conducting hydrological investigation including detailed calculation for major/important bridges using DEM (Digital Elevation Model) Geological information systemTasks ( i). marking of all bridges locations on index plan of the alignment. (ii.)Delineating the catchment boundary of bridges from DEM and calculating physiographic parameters of the catchment-area longest stream, slope iii.Calculating design discharge(Q50) for all bridges based on RBF 16/RBF 22 reports for small catchments and synthetic unit hydrograph from flood estimation report forlarge catchments (> 25 sq.km) iv Consultant will verify if there are any dams/waterstorage structures in the catchment and obtain regulated flow discharge from concerned authority for calculation of design 21 discharge.v. Checking of adequacy of proposed linear waterway,vertical clearance, free board and depth of foundation. Soil investigation report for scour depth calculations will be provided to the consultant.Deliverables i. 3 copies of report with bridge wise hydrological calculations should be submitted. Separate booklets should be prepared for major and minor bridges.ii. For each bridge, calculations and catchment plan with longest stream marked on Survey of India toposheet should be submitted. For bridges with large catchment unit hydrograph and calculation of equivalent slope should also be submitted. iii.Catchment plan should bemarked on 50 year 24 hr rainfall map to verify correctness of rainfall data used and the same and the same submitted in the booklet. iv. The following are required to be submitted as soft copy-calculation spreadsheets, Google EarthKML files of catchment plans,longest stream, alignment and bridges location.
4
4934
19739.08
... More
Conducting traffic survey for double line /new line as per the relevant Chapter 3 of 22 railway Engineering Code and preparation of detailed project report along with ROR, FIRR & EIRR (As per guidelines issued by Railway Board & including network effect) calculations duly complying the conditions involved. The detailed project report along with ROR calculations to be submitted in ten (10) hard copies as well as soft copy.
10
660
6605.7
... More
"Survey prepration of DPR & Detailed Estimate for the Signaling Telecomminication works for new BG Railway line as per Annexure I."
10
4902
49023
... More
Survey prepration of pegging plan general power of supply diagram wireing-cum- 24 sectioning digram, location plan of traction Sub station and switching station for desgin of 2x25Kv AC Traction system and prepration of detailed project report for new BG Railway line (Detailed scope of work is as per terms of reference attached)
10
13974
139742.8
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%