North Central Railway Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
North Central Railway - NCR Tender
Civil And Construction
Construction Material
Ireps
Opening Date3 Jan 2025
Closing Date24 Jan 2025
Tender Amount₹ 59,42,815.79
Costs
EMD
₹ 1,18,900Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Maintenance Of Fencing In Mtj-bfp Section Under Aden-ii/mtj.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025-Jan-01-03-AGRA DIVISION-ENGINEERING/NORTH CENTRAL RLYTender No
2025-Jan-01-03Tender Authority
North Central Railway ViewPurchaser Address
-Website
http://ireps.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
ROAD WORK // FENCING // Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be 4 strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used. // With G.I. barbed wire
7614.6
19
149246.16
... More
ROAD WORK // FENCING // Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete.
8702.4
99
869804.88
... More
ROAD WORK // FENCING // Welded steel wire fabric fencing with posts of specified 6 material and of standard design placed and embedded in cement concrete blocks 45x45x 60 cm ofmix 1:5:10 (1 cement:5 fine sand : 10 graded stone aggregate 40 mm nominal size), every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and struts embedded in cement concrete blocks 70x45x50 cm of the same mix, provided with welded steel wire fabric fixed between the posts fitted and fixed with G.I. staples on wooden plugs or tied to 6 mm bar nibs with G.I. binding wire (cost of posts, welded steel wire fabric, painting, earth work in excavation and concrete to be paid for separately).
507.64
55
27920.2
... More
EARTH WORK // Earth work in excavation by mechanical means (Hydraulic 7 excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. // All kinds of soil.
253.82
286
72808.27
... More
DISMANTLING AND DEMOLISHING // Disposal of building rubbish / malba / similar 8 unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.
1813
219
397681.55
... More
CONCRETE WORK // CEMENT CONCRETE (CAST IN SITU) // Providing and laying in 9 position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : // 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
253.85
7365
1869643.33
... More
MASONRY WORK // Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: // Cement mortar 1:4 (1 cement : 4 coarse sand)
29
6882
199578
... More
MASONRY WORK // Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : // Cement mortar 1:4 (1 cement : 4 coarse sand)
50.76
8512
432074.2
... More
FINISHING // CEMENT PLASTER (IN FINE SAND) // 12 mm cement plaster of mix : // 1:4 (1 cement: 4 fine sand)
362.6
294
106912.61
... More
REINFORCED CEMENT CONCRETE // CAST IN SITU // Providing and laying in position 13 specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : // 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources)
3.62
8364
30278.4
... More
REINFORCED CEMENT CONCRETE // CAST IN SITU // Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, 14 fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : // 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
3.62
10185
36869.88
... More
REINFORCED CEMENT CONCRETE // FORM WORK // Centering and shuttering including strutting, propping etc. and removal of form for // Foundations, footings, bases of columns, etc. for mass concrete
43.51
307
13398.9
... More
REINFORCED CEMENT CONCRETE // FORM WORK // Centering and shuttering including strutting, propping etc. and removal of form for // Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
87.02
669
58264.24
... More
REINFORCED CEMENT CONCRETE // STEEL REINFORCEMENT // Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. // Hot rolled deformed bars
1740.48
89
156034.03
... More
Hiring of machinery for minor miscellaneous works for short duration including 1 operator/driver, fuel, lubricants and consumable. The contractor shall arrange all statutory permits as required by rules and regulations prevailing in the area of work. Payment shall be made for actual working hours at site. JCB Backhoe Loaders 3DX Plus or similar with minimum 1.10 cum bucket capacity
507.64
794
381704.93
... More
Loading, leading and unloading of PSC Sleepers of 52Kg / 60Kg by Railway's Rail Dolly/ Dip Lorry to the nominated location under traffic in case road carriage is not possible for different leads and lift up to 5 metres. For lead up to 500 metres
580.16
277
152541.16
... More
Transportation of Rails, sleepers, switches, crossings, SEJs and Glued Joints by road 3 vehicles for different leads. Note: 1. Lead shall be the shortest motorable road length between the points of loading and unloading. 2. Loading and unloading shall be paid extra under relevant items. Lead up to 5 Km
507.64
52
25455.32
... More
Transportation of Rails, sleepers, switches, crossings, SEJs and Glued Joints by road 4 vehicles for different leads. Note: 1. Lead shall be the shortest motorable road length between the points of loading and unloading. 2. Loading and unloading shall be paid extra under relevant items. Lead beyond 5 Km and up to 10 km
362.6
94
32315.83
... More
Transportation of Rails, sleepers, switches, crossings, SEJs and Glued Joints by road 5 vehicles for different leads. Note: 1. Lead shall be the shortest motorable road length between the points of loading and unloading. 2. Loading and unloading shall be paid extra under relevant items. Lead beyond 10 Km and up to 20 km
217.56
150
30922.73
... More
Transportation of Rails, sleepers, switches, crossings, SEJs and Glued Joints by road 6 vehicles for different leads. Note: 1. Lead shall be the shortest motorable road length between the points of loading and unloading. 2. Loading and unloading shall be paid extra under relevant items. Lead beyond 20 Km and up to 30 km
145.04
218
29974.33
... More
Hiring of machinery for minor miscellaneous works for short duration including 7 operator/driver, fuel, lubricants and consumable. The contractor shall arrange all statutory permits as required by rules and regulations prevailing in the area of work. Payment shall be made for actual working hours at site. Hydra or similar tyre mounted Pick-n-Carry crane of 12T capacity for misc. works of handling of material
108.78
942
97053.52
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%